Notification Requirements for LNG Siting and Design Reviews
New collection (Request for a new OMB Control Number)
No
Regular
08/27/2024
table that charts list comparision
Requested
Previously Approved
36 Months From Approved
14
0
14
0
0
0
This mandatory information collection covers the burden for pipeline facility owners and/or operators to notify PHMSA, according to 49 CFR 190.405, and provide design specifications, construction plans and procedures, project schedule, and related materials of their prospective project. Pipeline facility owners and operators must also notify PHMSA when costs associated with the design and construction of new facilities for which PHMSA conducts siting reviews exceed $2.5 billion.
Pipeline Safety: Cost Recovery for Siting Reviews for LNG Facilities NPRM proposes to require owners and/or operators of LNG pipeline facilities to notify PHMSA, according to 49 CFR 190.405, when costs associated with the design and construction of new facilities for which PHMSA conducts siting reviews exceed $2.5 billion and provide design specifications, construction plans and procedures, project schedule and related materials of their prospective project.
49 CFR 190.405 would require the applicant for any new pipeline facility project in which PHMSA will conduct a design safety review to notify PHMSA and provide specific materials that PHMSA will examine during such reviews. Section 190.405 also identifies a 90-day target for PHMSA to provide the applicant its written feedback on those materials.
PHMSA also proposes to require applicants for new or expanded LNG facility projects to notify PHMSA of any material changes to documentation submitted to PHMSA or changes to estimated project design and construction costs that would cause the project to exceed the monetary threshold in 49 CFR 195.403(a).
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.