FERC-537 (OMB Control No. 1902-0060)
Supporting Statement
FERC-537 (Gas Pipeline Certificates: Construction, Acquisition, and Abandonment),
(Three-year extension requested)
The Federal Energy Regulatory Commission (FERC or Commission) requests that the Office of Management and Budget (OMB) review and renew the information collection requirements in FERC-537 under OMB Control No. 1902-0060. This supporting statement covers the requirements of the FERC-537 information collection. The reporting requirements in the FERC-537 are also contained in FERC’s regulations in 18 Code of Federal Regulations (CFR) Parts 2, 157, and 284.1
CIRCUMSTANCES THAT MAKE THE COLLECTION OF INFORMATION NECESSARY
Under the Natural Gas Act (NGA)2 a natural gas company must obtain FERC authorization to engage in the transportation of natural gas in interstate commerce, to undertake the construction or extension of any facilities, or to acquire or operate any such facilities or extensions in accordance with section 7(c) of the NGA. A natural gas company must also obtain FERC approval under section 7(b) of the NGA prior to abandoning any jurisdictional facility or service. Under the Natural Gas Policy Act (NGPA) (Public Law 96-621) interstate pipelines must also obtain FERC authorization for certain transportation arrangements. If a certificate is granted, the natural gas company can engage in the interstate transportation of natural gas and construct, acquire, or operate facilities. Conversely, approval of an abandonment application permits the pipeline to cease service and discontinue the operation of such facilities. Authorization under NGPA Section 311(a) allows the interstate or intrastate pipeline applicants to render certain transportation services.
HOW, BY WHOM, AND FOR WHAT PURPOSE THE INFORMATION IS TO BE USED AND THE CONSEQUENCES OF NOT COLLECTING THE INFORMATION
The natural gas companies file the necessary information with FERC so that the Commission can determine from the data if the requested certificate should be authorized. The data required to be submitted in a normal certificate filing may include (depending on the circumstances and application):
Identification of the company and responsible officials
Factors considered in the location of the facilities and the impact on the area for environmental considerations
Flow diagrams showing the design capacity for engineering design verification ;
Cost of proposed facilities, plans for financing, and estimated revenues and expenses related to the proposed facility for accounting and financial evaluation.
Existing and proposed storage capacity and pressures and reservoir engineering studies for requests to increase storage capacity;
An affidavit showing the consent of existing customers for abandonment of service requests.
In addition, requests for an increase of pipeline capacity must include a statement that demonstrates compliance with the Commission’s Certificate Policy Statement by making a showing that the cost of the expansion will not be subsidized by existing customers and that there will not be adverse economic impacts to existing customers, competing pipelines or their customers, or to landowners and surrounding communities.
DESCRIBE ANY CONSIDERATION OF THE USE OF IMPROVED INFORMATION TECHNOLOGY TO REDUCE THE BURDEN AND TECHNICAL OR LEGAL OBSTACLES TO REDUCING BURDEN
There is an ongoing FERC effort to increase the use of improved information technology in order to reduce the compliance burden. The FERC-537 materials may be eFiled through FERC’s eFiling system. [See http://www.ferc.gov/docs-filing/efiling/filing.pdf for more information.]
The majority of the application filings made in accordance with sections 7(b) and 7(c) are filed electronically. However, due to the complexity of the exhibits, maps, and projects and distances covered by the project, for some of the filings, up to three additional paper copies may be required for staff review, processing, and collaboration. As additional uses of information technology are implemented, FERC may be able to reduce or eliminate the need for the additional paper copies.
DESCRIBE EFFORTS TO IDENTIFY DUPLICATION AND SHOW SPECIFICALLY WHY ANY SIMILAR INFORMATION ALREADY AVAILABLE CANNOT BE USED OR MODIFIED FOR USE FOR THE PURPOSE(S) DESCRIBED IN INSTRUCTION NO. 2
Filing requirements are periodically reviewed as information collection expiration dates arise or as the Commission may deem necessary in carrying out its regulatory responsibilities under the NGA in an effort to alleviate duplication. All Commission information collections are subject to analysis by Commission staff and are examined for redundancy. There is no other source of this information
METHODS USED TO MINIMIZE THE BURDEN IN COLLECTION OF INFORMATION INVOLVING SMALL ENTITIES
For FERC-537 all entities have the option of filing electronically through the eFiling interface as a means of reducing their incurred burden. The exact burden will vary among applicants since the information should be specific for each applicant and site.
CONSEQUENCE TO FEDERAL PROGRAM IF COLLECTION WERE CONDUCTED LESS FREQUENTLY
The Commission reviews and analyses the information filed under the regulations subject to FERC-537 to determine whether to approve or deny the requested authorization. If the Commission failed to collect these data, it would lose its ability to review relevant information to determine whether the requested certificate should be authorized.
EXPLAIN ANY SPECIAL CIRCUMSTANCES RELATING TO THE INFORMATION COLLECTION
There are no special circumstances (as described in 5 CFR 1320.5(d)(2)) related to the FERC-537 information collection.
DESCRIBE EFFORTS TO CONSULT OUTSIDE THE AGENCY: SUMMARIZE PUBLIC COMMENTS AND THE AGENCY’S RESPONSE
In accordance with OMB requirements, the Commission published a 60-day notice3 on 7/3/2024 and published a 30-day notice4 on 09/25/2024 there were no comments received on this collection.
EXPLAIN ANY PAYMENT OR GIFTS TO RESPONDENTS
There are no payments or gifts to respondents associated with the FERC-537.
DESCRIBE ANY ASSURANCE OF CONFIDENTIALITY PROVIDED TO RESPONDENTS
The Commission does not guarantee the information provided by applicants to be confidential. In fact, most of it is understood to be public. However, the Commission has encouraged applicants to indicate information which may be Critical Energy/Electric Infrastructure Information (CEII), or privileged, and thus initially confidential. CEII as defined in Section 18 CFR 388.113 includes information about proposed or existing natural gas facilities that could be used by a person planning an attack on critical energy infrastructure. Privileged material most often includes proprietary business information, specific cultural resource details and locations, and personal identification information of affected landowners. More information about CEII and privileged security levels of information are posted at http://www.ferc.gov/legal/ceii-foia/ceii.asp and http://www.ferc.gov/legal/ceii-foia/ceii/classes.asp. The Commission’s procedures in Part 388 are designed to ensure that CEII and privileged material are not placed in the Commission’s public records. Note that the Commission implemented revised procedures for the appropriate handling of documents and will follow the controlled unclassified information (CUI) labeling system now prescribed; see http://www.ferc.gov/docs-filing/labeling-guidance.pdf.
PROVIDE ADDITIONAL JUSTIFICATION FOR ANY QUESTIONS OF A SENSITIVE NATURE, SUCH AS SEXUAL BEHAVIOR AND ATTITUDES, RELIGIOUS BELIEFS, AND OTHER MATTERS THAT ARE COMMONLY CONSIDERED PRIVATE.
There are no questions of a sensitive nature in the reporting requirements.
ESTIMATED BURDEN OF COLLECTION OF INFORMATION
The estimate for cost and burden is as follows:
FERC-537 (Gas Pipeline Certificates: Construction, Acquisition, and Abandonment)5 |
||||||
|
Number
of Respondents |
Annual Number of Responses per Respondent (2) |
Total Number of Responses (1)*(2)=(3) |
Average Burden & Cost Per Response6 (4) |
Total Annual Burden Hours & Total Annual Cost (3)*(4)=(5) |
Cost per Respondent ($) (5)÷(1)7 |
18 CFR 157.5-.11 (Interstate Certificate and Abandonment Applications) |
31 |
1.39 |
43.09
|
500 hrs.; $50,000 |
21,545hrs; $ 2,154,500 |
$ 69,500 |
18 CFR 157.53 (Pipeline Purging/Testing Exemptions) |
1 |
1 |
1 |
50 hrs.; $5,000 |
50 hrs.; $5,000 |
$5,000 |
18 CFR 157.201-.209; 157.211; 157.214-.218 (Blanket Certificates Prior to Notice Filings) |
30
|
2.125 |
63.75 |
200 hrs.; $20,000 |
12,750 hrs.; $ 1,275,000 |
$42,500 |
18 CFR 157.201-.209; 157.211; 157.214-.218 (Blanket Certificates – Annual Reports) |
176 |
1 |
176 |
50 hrs.; $5,000 |
8,800hrs.; $880,000 |
$5,000 |
18 CFR 284.11 (NGPA Section 311 Construction – Annual Reports) |
75 |
1 |
75 |
50 hrs.; $5,000 |
3,750 hrs.; $375,000 |
$5,000 |
18 CFR 284.88 (Request for Waiver of Capacity Release Regulations) |
31 |
1.39 |
43.09
|
10 hrs.: $1,000 |
430.9 hrs.; $ 43,090 |
$1,390 |
18 CFR 284.13(e) and 284.126(a) (Interstate and Intrastate Bypass Notice) |
2 |
1 |
2 |
30 hrs.; $3,000 |
60 hrs.; $6,000 |
$3,000
|
18 CFR 284.221 (Blanket Certificates) |
1 |
1 |
1 |
100 hrs.; $10,000 |
100 hrs.; $10,000 |
$10,000 |
18 CFR 284.224 (Hinshaw Blanket Certificates) |
2 |
1 |
2 |
75 hrs.; $7,500 |
150 hrs.; $15,000 |
$7,500 |
18 CFR 157.5-.11; 157.13-.20 (Non-facility Certificate or Abandonment Applications |
11 |
1.36 |
14.96 |
75 hrs.; $7,500 |
1,122 hrs.; $112,200 |
$10,200 |
Project based Labor wages |
22 |
1 |
22 |
15 hrs. $1,500 |
330 hrs. $33,000 |
$1,500 |
TOTAL |
382 |
|
444 (rounded) |
|
49,091hrs.; (rounded) $ 4,909,010 |
|
ESTIMATE OF THE TOTAL ANNUAL COST BURDEN TO RESPONDENTS
All of the costs are associated with burden hours (labor) and described in #12 and 15.
ESTIMATED ANNUALIZED COST TO FEDERAL GOVERNMENT
The estimated annualized cost to the Federal Government for FERC-537 follows:
|
Number of Employees (FTE) |
Estimated Annual Federal Cost |
FERC-537 Analysis and Processing of filings9 |
55 |
$ 11,428,230 |
PRA10 Administrative Cost |
|
$8,396 |
FERC Total |
|
$11,436,626 |
The Commission bases its estimate of the ‘Analysis and Processing of filings’ cost to the Federal Government on salaries and benefits for professional and clerical support. This estimated cost represents staff analysis, decision making, and review of any actual filings made in response to the information collection.
The FERC-537 applications and data include a variety of highly technical exhibits. The federal staff analyzing and processing the data includes many types of highly specialized and experienced technical and professional staff members in a variety of fields. FERC-537 applications and related exhibits may include:
For Certificates
Articles of incorporation
Flow diagrams (showing daily design capacity and reflecting operation with and without proposed facilities, reflecting maximum capabilities, and data)
Total gas supply data
Market data
Federal authorizations
Cost of facilities
Financing
Construction, operation, and management
Revenues, Expenses, and Income
Depreciation and depletion
Tariffs
For Abandonments
Related applications
Contracts and other agreements
Flow diagram showing daily design capacity and reflecting operation of applicant's system after abandonment
Impact on customers whose service will be terminated
Effect of the abandonment on existing tariffs
Accounting treatment of abandonment
Location of facilities
The PRA Administrative Cost is a Federal Cost associated with preparing, issuing, and submitting materials necessary to comply with the Paperwork Reduction Act (PRA) for rulemakings, orders, or any other vehicle used to create, modify, extend, or discontinue an information collection. This average annual cost includes requests for extensions, all associated rulemakings, and any changes to the collection, and publication of required notices in the Federal Register.
REASONS FOR CHANGES IN BURDEN INCLUDING THE NEED FOR ANY INCREASE
Growth in the industry caused the number of respondents to increase from 416 to 444. This reflects the fact that more firms are doing business related to gas pipeline construction, acquisition, and abandonment.
FERC-537 |
Total Request |
Previously Approved |
Change due to Adjustment in Estimate |
Change Due to Agency Discretion |
Annual Number of Responses |
444 |
416 |
+28 |
0 |
Annual Time Burden (Hr.) |
49,091 |
45,763 |
+3,328 |
0 |
Annual Cost Burden ($) |
0 |
0 |
0 |
0 |
TIME SCHEDULE FOR PUBLICATION OF DATA
FERC does not publish any data associated with this collection.
DISPLAY OF EXPIRATION DATE
The expiration date is displayed at https://www.ferc.gov/enforcement-legal/legal/information-collections.
EXCEPTIONS TO THE CERTIFICATION STATEMENT
There are no exceptions.
1 18 CFR Parts 2.55(a)(3), 157.5-.11, 157.13-.20, 157.53, 157.201-.209, 157.211, 157.214-.218, 284.8, 284.11, 284.126(a), 284.221, and 284.224.
2 15 U.S.C. 717-717w
3 89 FR 55235
4 89 FR 78298
5 Changes to estimated number of respondents were based on average number of respondents over the past three years.
6 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $100.00/hour = Average cost/response. The figure is the 2024 FERC average hourly cost (for wages and benefits) of 100.00 (and an average annual salary of $207,786/year). Commission staff is using the FERC average salary because we consider any reporting requirements completed in response to the FERC-537 to be compensated at rates similar to the work of FERC employees.
7 Each of the figures in this column are rounded to the nearest dollar.
8 A Certificate Abandonment Application would require waiver of the Commission’s capacity release regulations in 18 CFR 284.8; therefore this activity is associated with Interstate Certificate and Abandonment Applications.
9 Based upon FERC’s 2024 FTE average salary plus benefits ($207,786/year).
10 Paperwork Reduction Act of 1995 (PRA)
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Title | FERC-537 supporting statement |
Author | ferc |
File Modified | 0000-00-00 |
File Created | 2024-10-07 |