FERC-505, Small Hydropower
Projects and Conduit Facilities including License/Relicense,
Exemption, and Qualifying Conduit Facility Determination
No
material or nonsubstantive change to a currently approved
collection
No
Regular
02/13/2025
Requested
Previously Approved
02/28/2026
02/28/2026
324
324
24,555
24,555
0
0
FERC-505 includes applications,
notices of intent, and related information collection activities
for: • Small hydropower project licenses and relicenses; •
Exemptions; and • Determinations of a qualifying conduit hydropower
facility. Small hydropower projects are minor water power projects
and major water power projects that have an installed capacity of
10 MW or less. They may be licensed under Part I of the Federal
Power Act, but some small hydropower projects may be eligible for
an exemption. There are two types of FERC hydropower exemptions:
(1) exemptions for qualifying conduit hydropower facilities; and
(2) exemptions for small projects of 10 MW or less. A qualifying
conduit hydropower facility, as defined in section 30 of the FPA,
is an existing or proposed hydroelectric facility that utilizes for
electric power generation the hydroelectric potential of a conduit,
or any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is not primarily used for the
generation of electricity. A Notice of Intent to Construct
Qualifying Conduit Hydropower Facilities under 18 CFR 4.401, which
is discussed above, is required in order to seek a determination by
the Commission that the proposed facility is in accordance with
criteria listed at section 30 of the FPA. If the Commission issues
such a determination, the facility is not required to be licensed
or exempted by the Commission under Part I of the FPA. A 10-MW
exemption, as defined in section 405(d) of PURPA, is a project that
utilizes for electric generation the water potential of either an
existing non-federal dam or a natural water feature (e.g., natural
lake, water fall, gradient of a stream, etc.) without the need for
a dam or man-made impoundment. The respondents for this information
collection include citizens of the United States, corporations
organized under the laws of United States or any State thereof,
State governments, and municipalities.
US Code:
16
USC 791 Name of Law: Federal Power Act
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.