NESHAP for Primary Aluminum Reduction Plants (40 CFR part 63, subpart LL) (Renewal)

ICR 202502-2060-037

OMB: 2060-0360

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2025-02-28
Supplementary Document
2025-02-28
Supporting Statement A
2025-02-28
IC Document Collections
ICR Details
2060-0360 202502-2060-037
Received in OIRA 202107-2060-002
EPA/OAR 1767.09
NESHAP for Primary Aluminum Reduction Plants (40 CFR part 63, subpart LL) (Renewal)
Extension without change of a currently approved collection   No
Regular 02/28/2025
  Requested Previously Approved
36 Months From Approved 02/28/2025
20 26
39,200 52,300
299,000 310,000

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for the regulations published at (40 CFR Part 63, Subpart LL) were proposed on September 26, 1996; promulgated on October 7, 1997; and amended on October 15, 2015. These regulations apply to owner or operator of the affected facilities, which include new or existing potlines, paste production plants, or anode bake furnaces associated with primary aluminum production and located at a major source, and for each new pitch storage tank associated with a primary aluminum reduction plant. New facilities include those that commenced either construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart LL. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.

US Code: 42 USC 7401 et.seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  88 FR 31748 05/18/2023
90 FR 10916 02/28/2025
No

1
IC Title Form No. Form Name
NESHAP for Primary Aluminum Reduction Plants (40 CFR Part 63, Subpart LL)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 20 26 0 0 -6 0
Annual Time Burden (Hours) 39,200 52,300 0 0 -13,100 0
Annual Cost Burden (Dollars) 299,000 310,000 0 0 -11,000 0
No
No
There is a decrease of 13,100 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This decrease is due to a decrease in the number of sources from eight to six compared to the previously approved ICR. There was also a decrease in the overall total capital and O&M costs due to the decrease in number of sources. This decrease is not due to any program changes.

$9,810
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/28/2025