Document
Permittee Report of Road Use
ICR 202606-1004-004 · OMB 1004-0168 · Object 170062700.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Permittee Report of Road Use |
| Subject | roads |
| Keywords | roads, rights-of-way, policy, IM-OR-2018-001 |
| Author | Bureau of Land Management |
| Last Modified By | Calc |
| File Modified | 2026-06-15 |
| File Created | 2026-07-24 |
| Conversion State | complete |
Extracted Text
Permittee Name/Contact/Bill Address: ↓ United States Department of the Interior Bureau of Land Management - Oregon State Office PERMITTEE REPORT OF ROAD USE Permit No.:↓ Serial No.:↓ Period From↓: Period To↓: Form OR 2812-6 (October 2026) OMB 1004-0168; Expiration 10/31/2029 Page 1 of _____ (for this reporting period) ↓BLM responsible for finalizing this portion↓: ↓Permittee required to complete this portion↓: Material Hauled From: Road Use Fees Maintenance Fees Surface Replacement Fees Quantity hauled (MBF in Long Log)* Alloc. or NonFee/ Amount Length Alloc. Road Use Due (NTE Fee/ MBF/ Permittee Project Name Road used Surface (A or Fee/MBF Current Def. MBF/Mi. Amount Mi. T. R. Sec. BLM Road No. Segment (optional) (Mi.) Type Non) ($)** Used Due Used Amount Due Bal.) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTALS FROM PAGE 1 $0.00 $0.00 $0.00 SUBTOTALS FROM PAGE 2 $0.00 $0.00 $0.00 TOTAL ALL PAGES (AMOUNTS TO BE BILLED) $0.00 $0.00 $0.00 PERMITTEE CERTIFICATION (Check one): BLM Verification: I certify that this Report of Road Use (all pages) is true and that, to the best of my knowledge, The hauling data in this Report of Road Use is verified. Bill can be prepared. is a complete statement of our hauling on U.S. roads during the above reporting period, or I certify that no hauling occurred on any U.S. roads during the above reporting period. Delegated BLM Official Permittee Signature*** Title Date Date *To report "Other Special Road Use" haul, enter the number of vehicles in the Quantity Hauled column and the appropriate fee per/vehicle mile into the Road Maintenance Fee/MBF Column. **For Reciprocal ROW: fees are calculated per MBF. If permit is system fee--then it is a negotiated fee/MBF. If a unilateral permit, use state-wide RUF/MBF. ***Title 18 U.S.C. Section 1001 makes it a crime for any person to knowingly make to any department or agency of the United States any false, ficticious, or fraudulent statements of representation as to any matter within its jurisdiction. Note: The Paperwork Reduction Act of 1995 requires us to inform you that: This information is being collected to determine road use and maintenance fees and verify other information relevant to operations under your right-of-way permit. The information is requried as a condition of your right-of-way permit and the regulations in 43 CFR 2812.8-1. Failure to submit this information may be grounds for suspension or termination of your permit. BLM may not sponsor, and you are not required to respond to, a collection of information that does not display a current valid OMB control number. Public reporting burden for this form is estimated to average 1 hour per response, including time for reviewing instructions, gathering and maintaining data, and completing and reviewing this form. Direct comments regarding the burden estimate or any other aspect of this form to: U.S. Department of the Interior, Bureau of Land Management, Bureau Clearance Officer, WO-630 (1004-0168), 1849 C Street, N.W., Mail Stop 4011LS, Washington, D.C. 20240. United States Department of Interior Bureau of Land Management - Oregon State Office PERMITTEE REPORT OF ROAD USE (CONTINUATION SHEET) Permit No. (one permit per report unless all are "no haul"): Permit No.↓ Serial No. ↓ Period From↓: ↓Permittee required to complete this portion↓: Material Hauled From: T. R. Sec. Permittee Project Name (optional) Form OR 2812-6 (October 2026) OMB 1004-0168; Expiration 10/31/2029 Period To↓: Page _____ of _____ (for this reporting period) ↓BLM responsible for finalizing this portion↓: Road Use Fees Surface Maintenance Fees Replacement Fees Alloc. or NonAmount Fee/ Alloc. Road Use Due (NTE Fee/ MBF/ BLM Road Road (A or Fee/MBF Current MBF/Mi. Amount Mi. No. Segment Non) ($)** Def. Bal.) Used Due Used $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS THIS PAGE (BLM TRANSFER TO PAGE 1)→ Quantity Length hauled used (MBF in Surface (Mi.) long log)* Type PERMITTEE CERTIFICATION for this continuation sheet: ← Initial here to indicate that certification on page one applies to this page as well. Amount Due $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 BLM Verification: The hauling data in this Report of Road Use is verified. Bill can be prepared. Delegated BLM Official Date *To report "Other Special Road Use" haul, enter the number of vehicles in the Quantity Hauled column and the appropriate fee per/vehicle mile into the Road Maintenance Fee/MBF Column. **For Reciprocal ROW: fees are calculated per MBF. If permit is system fee--then it is a negotiated fee/MBF. If a unilateral permit, use state-wide RUF/MBF.