Information Collection Request

30 CFR 250, Application for Permit to Drill (APD, Revised APD), Supplemental APD Information Sheet, and all supporting Documentation

ICR 202606-1014-001 · OMB 1014-0025 · Received in OIRA

Forms and Documents

Forms and supporting documents for this ICR
DocumentTypeStatusAvailability
Form BSEE-0123S Supplemental APD Information Sheet Form Modified Available
Form BSEE-0123 Application for Permit to Drill Form Modified Available
2026.10.16_91 FR 65772_1014-0025_30-day FRN.pdf Supplementary Document Uploaded 2026-10-16 Available
1014-0025-SS-APDs 2026 6.23.26 - JP Feedback.docx Supporting Statement A Uploaded 2026-07-16 Available
30 CFR Part 250 Subpart G (up to date as of 7-10-2026).pdf Supplementary Document Uploaded 2026-07-14 Available
30 CFR Part 250 Subpart E (up to date as of 7-10-2026).pdf Supplementary Document Uploaded 2026-07-14 Available
30 CFR Part 250 Subpart D (up to date as of 7-10-2026).pdf Supplementary Document Uploaded 2026-07-14 Available
30 CFR Part 250 Subpart C (up to date as of 7-10-2026).pdf Supplementary Document Uploaded 2026-07-14 Available
30 CFR Part 250 Subpart A (up to date as of 7-10-2026).pdf Supplementary Document Uploaded 2026-07-14 Available
2026-08030.pdf Supplementary Document Uploaded 2026-06-23 Available

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
235947 250.414(c) - Alternative Downhold mud weight prior to APD Modified
234256 250.738(b) - ITP written statement Modified
225374 250.1622(b) - Well-Completion Sulfur Removed
225373 250.1617 - Application for Sulfur Operations Removed
225372 250.1605(b)(3) - Fitness of Drilling Unit for Sulfur Removed
225370 250.807(a) - HPHT Removed
225369 250.738(n) - Pipe/Variable Bore Rams Modified
225368 250.738(m) - Additional Well Control Equipment Modified
225367 250.737(d)(12) - Autoshear & Deadman systems Modified
225366 250.737(d)(3)-(4) - ROV Test Procedures Modified
225365 250.737(d)(2) - Surface BOPs Modified
225364 250.737(b)(3) - Annular BOPs Unchanged
225363 250.737(b)(2) - RAM BOPs Unchanged
225362 250.737(a) - Omit BOP Pressure Test Modified
225361 250.734(c) - Revised Surface Casing Modified
225360 250.734(b) - Revised ITP Verification Report Modified
225359 250.733(b) - Annulus Monitoring Plan Modified
225358 250.731 - BOP / Independent Third Party (ITP) Modified
225356 250.721(g)(4) - Revised Successful Negative Pressure Test Removed
225355 250.721(g)(4) - Successful Negative Pressure Test Modified
225354 250.720(b) - Kill-Weight Fluid Modified
225353 250.713(g) - Current Speeds Modified
225352 250.713(e) - Contingency Plan Modified
225351 250.713(b) - Rig's Anchor Pattern Modified
225350 250.513 - Revised Description of Well-Completion Removed
225349 250.513 - Description of Well-Completion Modified
225348 250.513 - Revised Written Approval Removed
225347 250.513 - Written Approval Modified
225346 250.410; 412 through 418; 420; 456; 470; 472 - Alaska Region: Modified
225345 250.490(c) - Reclassification Modified
225344 250.490(c) - Available Information Modified
225343 250.490(c) - H2S Modified
225342 250.462(c) - Source Control & Containment Description Modified
225340 250.460(a) - Projected Plans Modified
225339 250.432 - Depart from Diverter Req. Modified
225338 250.428(k) - Description of Valve(s) Modified
225337 250.428(b) - Revised Casing Setting Depths Modified
225336 250.423(c) - Casing Pressure Test Procedures Unchanged
225335 250.420(a)(7) - Signed PE Cert. Modified
225334 250.411; 418 - Additional Information Modified
225333 250.411; 713 - MODU Modified
225332 250.411; 416; 731 - Diverter & BOP Descriptions Modified
225331 250.411; 413; 414; 415; 420 - Design, Drilling, Casing & Cementing Descriptions Modified
225330 250.411; 412 - Plat Requirements Modified
225329 250.410(d) - Public Info Copy Revised Removed
225327 250.410(d) - Public Info Copy Modified
225326 250.410(b); 713 - Plans Modified
225325 250.409 - Departures Modified
225324 250.300(b)(1)-(2) Sub C Modified
225323 Subparts D, E, G Revised APD Modified
225271 Subparts A, C, D, E, G, H, P - Actual APD and Supplemental APD Form ModifiedSupplemental APD Information Sheet
225271 Subparts A, C, D, E, G, H, P - Actual APD and Supplemental APD Form ModifiedApplication for Permit to Drill
225271 Subparts A, C, D, E, G, H, P - Actual APD and Supplemental APD Other-BSEE-0123 Screen Shots Modified

ICR Details

Reginfo record details
table that charts list comparision
  Requested Previously Approved
36 Months From Approved 10/31/2026
10,820 11,206
49,446 77,816
299,876 4,298,876





Reginfo record details
43
table that charts list of burden
IC Title Form No. Form Name
250.1605(b)(3) - Fitness of Drilling Unit for Sulfur
250.1617 - Application for Sulfur Operations
250.1622(b) - Well-Completion Sulfur
250.300(b)(1)-(2) Sub C
250.409 - Departures
250.410(b); 713 - Plans
250.410(d) - Public Info Copy
250.410(d) - Public Info Copy Revised
250.410; 412 through 418; 420; 456; 470; 472 - Alaska Region:
250.411; 412 - Plat Requirements
250.411; 413; 414; 415; 420 - Design, Drilling, Casing & Cementing Descriptions
250.411; 416; 731 - Diverter & BOP Descriptions
250.411; 418 - Additional Information
250.411; 713 - MODU
250.414(c) - Alternative Downhold mud weight prior to APD
250.420(a)(7) - Signed PE Cert.
250.423(c) - Casing Pressure Test Procedures
250.428(b) - Revised Casing Setting Depths
250.428(k) - Description of Valve(s)
250.432 - Depart from Diverter Req.
250.460(a) - Projected Plans
250.462(c) - Source Control & Containment Description
250.490(c) - Available Information
250.490(c) - H2S
250.490(c) - Reclassification
250.513 - Description of Well-Completion
250.513 - Revised Description of Well-Completion
250.513 - Revised Written Approval
250.513 - Written Approval
250.713(b) - Rig's Anchor Pattern
250.713(e) - Contingency Plan
250.713(g) - Current Speeds
250.720(b) - Kill-Weight Fluid
250.721(g)(4) - Revised Successful Negative Pressure Test
250.721(g)(4) - Successful Negative Pressure Test
250.731 - BOP / Independent Third Party (ITP)
250.733(b) - Annulus Monitoring Plan
250.734(b) - Revised ITP Verification Report
250.734(c) - Revised Surface Casing
250.737(a) - Omit BOP Pressure Test
250.737(b)(2) - RAM BOPs
250.737(b)(3) - Annular BOPs
250.737(d)(12) - Autoshear & Deadman systems
250.737(d)(2) - Surface BOPs
250.737(d)(3)-(4) - ROV Test Procedures
250.738(b) - ITP written statement
250.738(m) - Additional Well Control Equipment
250.738(n) - Pipe/Variable Bore Rams
250.807(a) - HPHT
Subparts A, C, D, E, G, H, P - Actual APD and Supplemental APD BSEE-0123, BSEE-0123S ,  
Subparts D, E, G Revised APD

table that charts list of burden
  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 10,820 11,206 0 0 -386 0
Annual Time Burden (Hours) 49,446 77,816 0 0 -28,370 0
Annual Cost Burden (Dollars) 299,876 4,298,876 0 0 -3,999,000 0


Reginfo record details
  No