Document
1730t13
ICR 202607-2060-002 · OMB 2060-0363 · Object 171212700.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | 1730t13 |
| Author | Denise Bevington |
| Last Modified By | Calc |
| File Modified | 2026-02-18 |
| File Created | 2026-08-01 |
| Conversion State | complete |
Extracted Text
Table 1: Annual Respondent Burden and Cost – NSPS for Hospital/Medical/Infectious Waste Incinerators (40 Burden item 1. Applications 2. Survey and Studies 3. Reporting requirements A. Familiarization with the regulatory requirement B. Required activities Perf spec tests (certif) for CMS Repeat perf spec tests (certif) for CMS c,d Development of operating information e Annual update of operating information f Review of operating information with each operator g,h Initial control equipment inspection i Annual control equipment inspection i C. Create information D. Gather existing information E. Write reports Notification of intent to construct f Notification of anticipated commencement of construction g Notification of anticipated startup g Notification of actual startup g Notification of type(s) of waste to be combusted Notification of HMIWI capacity Notification of initial performance test h Notification of initial CMS demonstration Initial report for the site selection analysis j Waste management plan k Analysis and supporting documentation demonstrating conformance with EPA guidance and specifications for bag leak detection systems l Report of initial performance test m Report of initial CMS demonstration m Annual report CMS emissions/operation parameters n Exceedances/ malfunctions/periods of which data not obtained q,p Results of performance tests conducted during the year q Report of no exceedances q,p Report of annual control equipment inspection Semiannual report of exceedances/ malfunctions/periods for which data not obtained q,p,r (A) (B) Person hours No. of per occurrences occurrence per respondent per year (C) (D) Person Respondents hours per per year a respondent per year (C=AxB) N/A N/A 1 1 1 3 16 16 160 20 8 20 20 See 3B See 3B 1 1 1 1 2 1 1 16 16 160 20 16 20 20 0 0 0 3 3 0 3 2 1 2 0 2 1 2 0 2 2 2 2 2 2 460 160 1 1 1 1 1 1 1 1 2 2 2 2 2 2 460 160 0 0 0 0 0 0 0 0 40 1 40 0 8 See 3B 1 8 0 32 1 32 3 48 1 48 0.6 40 1 40 3 24 See 3B 1 24 2.4 48 1 48 0.6 Subtotal for Reporting Requirements 4. Recordkeeping requirements A. Familiarize with regulatory requirement B. Plan activities C. Implement activities D. Develop record system E. Time to enter information Documentation produced as a result of sitting requirements Records of operators completing operator training requirements h Records of operators that have been qualified as HMIWI operators h Records of initial performance test Records of startup, shutdown, or malfunction Records of persons completing review of operating information h Records of process and control device operating parameters Records of CMS operation and maintenance g Records of exceedances/malfunctions/periods for which data not obtained Records of annual and any subsequent compliance tests Records of annual control equipment inspections Records of bag leak detection system alarms l F. Time to train personnel t G. Time for audits Subtotal for Recordkeeping Requirements Total Labor Burden and Costs (rounded) u Capital and O&M Cost (rounded) u GRAND TOTAL (rounded) u See 3A N/A N/A N/A See 3E 2 2 4 3 2 2 4 3 See 3E 1.5 52 78 3 2 2 4 3 1.5 52 78 3 0.03 365 9.13 3 1.5 52 78 3 52 1 78 40 2 3 See 3E See 3B 1.5 40 N/A Assumptions: a We have assumed that the average number of sources that are subject to the standard will be 3, with no additional new sources projected ov b This ICR uses the following labor rates: Managerial $172.41 ($82.10+ 110%); Technical $141.75 ($67.50 + 110%); and Clerical $71.36 ($ States Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” Th The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing w business expenses associated with hiring, training, and equipping their employees. We assume that performance specification to certify CMS is expected to take approximately 16 hours. We assume no failures of the initial CMS demonstrations; includes CO CEMS. e We assume it will take 160 hours to develop the operating information. f We assume that it will take 20 hours to update the operating information each year. g We assume that it will take 8 hours to review the operating information with each operator. h We assume that it will take 2 operators per facility to enter information. i We assume that annual control equipment inspection will occur for all sources. j We assume that it will take 460 hours to develop the site selection analysis. k We assume that it will take 160 hours to develop the waste management plan. c d We assume that it will take 40 hours to develop the bag leak detection system analysis and 1.5 hours to record bag leak detection system ala be evenly distributed among small, medium, and large sources and only new large and medium sources (i.e. two-thirds of the affected source l We assume that it will take 8 hours for each facility to review the report of the initial performance test for pollutants and fugitive ash. Person-hours per occurrence are assumed to be 32 hours. o We have assume that it will take 48 hours and 24 hours per report per affected facility to report monitoring exceedances and no excess emis monitoring requirements focus primarily on three pollutants (PM, CO, and HCl), assume three pollutants. m n Assume 20 percent of respondents report monitoring exceedances and 80 percent report no excess emissions. Assume 40 hours to review report of annual compliance test. r Because the semiannual report coincides once each year with the annual report and both reports include information on exceedances, malfun obtained, the frequency of the semiannual report is shown in the table as only once per year to avoid double-counting. p q We assume that this activity will be recorded daily. We assumed that it will take 40 hours once per year to train one person to perform the Method 9 and Method 22 tests. The labor requiremen hr/d for 5 d/yr. s t Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. u aste Incinerators (40 CFR Part 60, Subpart Ec) (E) (F) (G) Technical Management Clerical person- hours person hours person per year per year hours per (E=CxD) (Ex0.05) year (Ex0.1) (H) Total Cost Per year b 3 0.15 0.30 $472.52 0 0 0 60 48 0 60 0.00 0 0 3 2.4 0 3 0.00 0 0 6 4.8 0 6 $0.00 $0 $0.00 $9,450.39 $7,560.31 $0.00 $9,450.39 0 0 0 $0.00 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 $0.00 0 0 0 $0.00 96 4.8 9.6 $15,120.62 28.8 1.44 2.88 $4,536.19 120 6 12 $18,900.78 57.6 2.88 5.76 $9,072.37 28.8 1.44 2.88 $4,536.19 Labor Rates Management $172.41 Technical $141.75 Clerical $71.36 578 $79,100 12 0.60 1.20 $1,890.08 12 0.60 1.20 $1,890.08 234 11.7 23.4 $36,856.52 12 0.6 1.2 $1,890.08 234 11.70 23.4 $36,856.52 27.38 1.37 2.74 $4,311.74 234 11.7 23.4 $36,856.52 156 120 7.80 6 15.60 12 $24,571.01 $18,900.78 1,198 1,780 $164,023 $243,000 $177,000 $420,000 new sources projected over the next 3 years. %); and Clerical $71.36 ($33.98 + 110%). These rates are from the United nal and industry group.” The rates are from column 1, “Total compensation.” ness costs of employing workers beyond their wages and benefits, including Hrs/resp 1,780 106 g leak detection system alarms. We assume the total number of sources will hirds of the affected sources) will install baghouses. ants and fugitive ash. dances and no excess emissions, respectively. Because testing and on on exceedances, malfunctions, and periods for which data were not ing. ests. The labor requirements to train the personnel were estimated to be 8 Table 2: Average Annual EPA Burden and Cost – NSPS for Hospital/Medical/Infectious Waste Incinerators (4 Activity 1. 2. Attend initial performance test c Repeat initial performance test A. Retesting preparation d B. Attend retesting e 3. Litigation f 4. Excess emissions - enforcement activities g 5. Report review Review notification of intent to construct Review notification of anticipated commencement of construction Review notification of anticipated startup Review notification of actual startup Review notification of type(s) of waste to be combusted Review notification of HMIWI capacity Review notification of initial performance test Review notification of initial CMS demonstration Review notification addressing sitting requirements Review waste management plan Review analysis for bag leak detection systems h Review report of initial performance test i Review report of initial CMS demonstration Review annual report CMS emissions/operating parameters j Exceedances/malfunctions/periods for which data not obtained k Results of performance test conducted during the year l PM, CO, HCl Fugitive ash emissions Report of no exceedances m Report of annual control equipment inspection n Review semiannual report of exceedances/ malfunctions/periods for which data not obtained k,o TOTAL (rounded) p (A) EPA Person hours per occurrence 32 (B) No. of occurrences per respondent per year 1 (C) (D) Person Respondents hours per per year a respondent per year (C=AxB) 32 0 12 32 N/A 1 1 12 32 0 0 32 1 32 0.03 2 1 2 0 2 1 2 0 2 2 1 1 2 2 0 0 2 1 2 0 2 2 1 1 2 2 0 0 2 1 2 0 24 8 8 54 N/A 1 1 1 1 24 8 8 54 0 0 0 0 6 1 6 3 8 1 8 0.6 18 6 2 1 1 1 18 6 2 3 3 2.4 4 1 4 3 8 1 8 0.6 Assumptions: a We have assumed that the average number of sources that will be subject to the standard is 3. This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12 6, Step 3, $19.30+ 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Tec Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent t government employees. b We assume EPA personnel attend 8 percent of the initial performance tests. We assume that 20 percent will fail the initial performance test, and will have to repeat the performance test. e We assume 10 percent of initial performance re-tests are attended by EPA personnel. f This ICR does not account for litigation costs. c d g We assume 10 percent of the affected facilities are required to re-test as a result of excess emissions, and that EPA personnel attend 10 perc We assume only new large and medium sources (i.e. two-thirds of the effected sources) will install baghouses. We assume 6 person-hours per report per pollutant. For the three new HMIWI in the three-year period, nine pollutants are required to be tes j We assume 1 person-hour per report per CMS. For HMIWI, assume each uses six CMS (flue gas temperature, secondary chamber temperat liquor flow, and scrubber energy input). h i We assume 20 percent of the affected facilities with recurrent burden will report monitoring exceedances. We assume 6 person-hours per report per pollutant. For annual tests, there are three pollutants (PM, CO, and HCl) for all HMIWI. m We assume 80 percent of the affected facilities with recurrent burden will report no excess emissions. n We assume it will take 4 hours to review the annual control equipment inspection report. o Because the semiannual report coincides once each year with the annual report and both reports include information on exceedances, malfu obtained, the frequency of semiannual report is shown in the table as only once per year to avoid double-counting. k l p Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. Waste Incinerators (40 CFR Part 60, Subpart Ec) (E) (F) (G) Technical Management Clerical person- hours person hours person hours per year per year per year (E=CxD) (Ex0.05) (Ex0.1) (H) Total Cost Per year b 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 0.96 0.048 0.096 $61.44 0 0 0 $0.00 0 0 0 $0.00 0 0 0 0 0 0 $0.00 $0.00 0 0 0 $0.00 0 0 0 0 0 0 $0.00 $0.00 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00 $0.00 $0.00 18 0.9 1.8 $1,152.06 4.8 0.24 0.48 $307.22 54 18 4.8 2.7 0.9 0.24 5.4 1.8 0.48 $3,456.19 $1,152.06 $307.22 12 0.6 1.2 $768.04 4.8 0.24 0.48 $307.22 135 $7,510 Labor Rates: Management Technical Clerical 76.91 57.07 30.88 ; Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and Clerical $30.88 (GShours are 10 percent of Technical hours. These rates are from the Office of n increased by 60 percent to account for the benefit packages available to A personnel attend 10 percent of these tests. tants are required to be tested. condary chamber temperature, charge weight, scrubber liquor pH, scrubber l) for all HMIWI. ion on exceedances, malfunctions, and periods for which data were not ICR Summary Information Hours per Response 106 Number of Respondents 3 Total Estimated Burden Hours 1,780 Total Estimated Costs $420,000 Annualized Capital O&M $177,000 Total Annual Responses 17 Form Number Not Applicable Capital/Startup vs. Operation and Maintenance (O&M) Costs (C) (D) (A) (B) Continuous Monitoring Device Capital/Startup Cost for One Respondent 1 DIFF/WS2 DIFF2 WS2 SNCR3 CO CEMS4 BLD5 ACI6 Testing7 Filing Cabinets8 Photocopying8 Postage8 Totals (rounded) 9 $1,869 $1,465 $1,869 $2,122 $26,520 $1,565 $0 $102,227 $152 $0 $0 Number of New Respondents Total Capital/Startup Cost, (B X C) 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Costs have been updated to 2024 dollars using the annual Chemical Engineering Plant Cost Index (CEPCI) values for 2024 and 2007. (Cos 796.2/525.4). 1 Per the October 6, 2009 final rule (74 FR 51378), assume capital/startup costs of $1,233 and annual operation and maintenance costs of $4, scrubber with fabric filter followed by wet scrubber, and capital/startup costs of $967 and $2,733 per dry scrubber with fabric filter. 2 3 Per the October 6, 2009 final rule, assume capital/startup costs of $1,400 and annual operation and maintenance costs of $300 per facility u Per the October 6, 2009 final rule, assume capital/startup costs of $17,500 and annual operation and maintenance costs of $25,100 per facili activities, RATA, CGA, and annual QA and review. 4 Per the October 6, 2009 final rule, assume capital/startup costs of $1,033 and annual operation and maintenance costs of $1,267 per facility Per the October 6, 2009 final rule, assume annual operation and maintenance costs of $3,367 per facility for lime/carbon flow monitoring. 7 Per the October 6, 2009 final rule, assumes combined initial testing costs of $67,458 per facility. 8 Assumes an initial purchase cost of $100 for filing cabinets, and annual facility costs of $199 for photocopying and $93 for postage. 9 Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. 5 6 aintenance (O&M) Costs (E) Annual O&M Costs for One Respondent 1 $7,172 $4,142 $1,717 $455 $38,037 $1,920 $5,102 $0 $0 $302 $141 (F) (G) Number of Respondents with O&M Total O&M, (E X F) 3 3 3 3 3 3 3 3 3 3 3 $21,517 $12,425 $5,151 $1,364 $114,111 $5,760 $15,307 $0 $0 $905 $423 $177,000 (CEPCI) values for 2024 and 2007. (Costs = Costs from 2009 final rule x al operation and maintenance costs of $4,733 per facility for each wet scrubber or dry er dry scrubber with fabric filter. maintenance costs of $300 per facility using SCNR for control. d maintenance costs of $25,100 per facility using CO CEMS, including daily maintenance costs of $1,267 per facility using a bag leak detection system. acility for lime/carbon flow monitoring. hotocopying and $93 for postage. $177,000 2024 CEPCI CE Index 796.2 2007 CEPCI CE Index 525.4 CEPCI CE Adjustment factor 1.52 Total Annual Responses (A) (B) (C) (D) (E) Number of Existing Respondents Total Annual That Keep Responses E=(BxC) Records But Do +D Not Submit Reports Number of Respondents Number of Responses Notification of intent to construct 0 1 0 0 Notification of anticipated commencement of construction 0 1 0 0 Notification of anticipated startup 0 1 0 0 Notification of actual startup 0 1 0 0 Notification of type(s) of waste to be combusted 0 1 0 0 Notification of HMIWI capacity 0 1 0 0 Notification of initial performance test 0 1 0 0 Notification of initial CMS demonstration 0 1 0 0 Initial report for the site selection analysis 0 1 0 0 Waste management plan 0 1 0 0 Analysis and supporting documentation demonstrating conformance with EPA guidance and specifications for bag leak detection systems1 0 1 0 0 Report of initial performance test 0 1 0 0 Report of initial CMS demonstration 0 1 0 0 3 1 0 3 0.6 1 0 0.6 3 1 0 3 Report of no exceedances2 2.4 1 0 2.4 Report of annual control equipment inspection 3 1 0 3 Semiannual report of exceedances, malfunctions, and periods for which data not obtained2 2.4 2 0 4.8 Total 16.8 Information Collection Activity Annual reports CMS emissions and operating parameters Exceedances, malfunctions, and periods for which data not obtained2 Results of performance tests conducted during the year 1 Assume the total number of sources will be evenly distributed among small, medium, and large sources and only new large and medium sources (i.e. two-t 2 Assume 20 percent of respondents report monitoring exceedances and 80 percent report no excess emissions. w large and medium sources (i.e. two-thirds of the affected sources) will install baghouses. Number of Respondents Respondents That Submit Reports (A) Year a Number of New Respondents a Respondents That Do Not Submit Any Reports (B) (C) (D) Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents 1 0 3 0 0 2 0 3 0 0 3 0 3 0 0 Average 0 3 0 0 New respondents include sources with constructed and reconstructed affected facilities. (E) Number of Respondents (E=A+B+C-D) 3 3 3 3