Document
Cost and Burden Calculation Tables
ICR 202607-2060-004 · OMB 2060-0434 · Object 171242000.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Cost and Burden Calculation Tables |
| Author | Stephen Treimel |
| Last Modified By | Calc |
| File Modified | 2026-02-18 |
| File Created | 2026-08-01 |
| Conversion State | complete |
Extracted Text
ICR Summary Information Hours per Response 203 Number of Respondents 19 Total Estimated Burden Hours 23,300 Total Estimated Costs $6,240,000 Annualized Capital O&M $3,050,000 Total Annual Responses 115 Form Number Not Applicable Table 1: Annual Respondent Burden and Cost – NESHAP for the Manufacture of Amino/Phenolic Resins (40 (A) Burden Item 1. Applications 2. Survey and Studies 3. Reporting Requirements A. Familiarize with regulatory requirements c, d B. Plan activities C. Training D. Create, test and research development e, f E. Gather, monitor and inspect information F. Process, compile and review G. Write Report 1) Pre-compliance report 2) Notification of compliance status 3) Semiannual summary report g 4) Activities for periodic report related to storage vessel maintenance h 5) Reports of malfunctions 6) Other reports 7) Leak detection and repair (LDAR) reporting Subtotal for Reporting Requirements 4. Recordkeeping Requirements A. Familiarize with regulatory requirements c, d B. Plan activities C. Implement activities 1) Malfunction records 2a) Monitoring records 2b) Continuous process vent records h 3) Batch process vent records 4) Aggregate batch vent stream records 5) Leak detection and repair (LDAR) records 6) Other records and documentation D. Develop record system 1) Record/disclose information 2) Store, file, maintain information i E. Time to enter information 1) Malfunction records 2) Monitoring records 3a) Storage vessel - maintenance & recording info h 3b) Continuous process vent records h 4) Batch process vent records 5) Aggregate batch vent stream records (B) No. of Technical occurrences person-hours per per occurrence respondent per year (C) Technical person-hours per respondent per year (C=AxB) (D) Respondents per year a N/A N/A 16 8 16 320 208 48 1 1 1 1 1 2 16 8 16 320 208 96 19 19 19 1 19 19 20 20 40 1 1 2 20 20 80 0 0 19 1 1 1 15 20 8 60 2 2 1 40 16 60 19 19 19 6 24 4 24 24 24 24 2 2 2 2 2 2 2 12 48 8 48 48 48 48 19 19 1 19 19 19 19 16 4 2 2 32 8 19 19 4 4 1 4 4 4 2 2 1 2 2 2 8 8 1 8 8 8 19 19 15 1 19 19 See 3A See 3B 6) Leak detection and repair (LDAR) records 7) Other records and documentation F. Time to train personnel 1) Control equipment inspect and monitor 2) Leak detection and repair G. Time for audits Subtotal for Recordkeeping Requirements Total Labor Burden and Costs (rounded) j Total Capital and O&M Cost (rounded) j Grand Total (rounded) j 4 8 2 2 8 16 19 19 40 40 N/A 2 2 80 80 19 19 Assumptions: a This ICR assumes there are 19 respondents subject to the rule and that no additional respondents will become subject over the next three ye This ICR uses the following labor rates: Managerial $172.41 ($82.10+ 110%); Technical $141.75 ($67.50 + 110%); and Clerical $71.36 ($ Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers bey expenses associated with hiring, training, and equipping their employees. This ICR assumes that Managerial hours are 5 percent of Technica hours. b c This ICR assumes that all respondents will have to familiarize with the regulatory requirements each year. d We assume that it will take 16 hours for each respondent to familiarize with regulatory requirements. Initial performance testing was assumed to take 280 technical hours (1 test leader for two weeks and 5 feet crew for one week), with an add monitoring levels for a total of 320 respondent hours per occurrence. e f We assume that 5 percent of the initial tests will be repeated during each successive year. g We assume that it will take each respondent 40 hours two times per year to complete reports (semiannual reporting). Includes burden from activities based on amendments in the October 15, 2018 final rule (83 FR 51842). These activities only apply to own these provisions (15 facilities), or continuous process vents (1 facility). h i We assume that it will take 4 hours two times per year to gather monitoring information and maintain monitoring equipment. j Totals have been rounded to three significant figures. Figures may not add exactly due to rounding. /Phenolic Resins (40 CFR Part 63, Subpart OOO) (Renewal) (E) (F) (G) Technical Management Clerical hours hours per year hours per year per year (E=CxD) (F=Ex0.05) (H) Total cost per year ($) b (G=Ex0.10) 304 152 304 320 3,952 1,824 15 8 15 16 198 91 30 15 30 32 395 182 $47,881.98 $23,940.99 $47,881.98 $50,402.08 $622,465.69 $287,291.86 0 0 1,520 0 0 76 0 0 152 $0 $0 $239,409.88 15 1 2 $2,362.60 760 304 1,140 38 15 57 12,184 76 30 114 $119,704.94 $47,881.98 $179,557.41 $1,668,781 228 912 8 912 912 912 912 11 46 0.4 46 46 46 46 23 91 1 91 91 91 91 $35,911.48 $143,645.93 $1,260.05 $143,645.93 $143,645.93 $143,645.93 $143,645.93 608 152 30 8 61 15 $95,763.95 $23,940.99 152 152 15 8 152 152 8 8 1 0.4 8 8 15 15 2 1 15 15 $23,940.99 $23,940.99 $2,362.60 $1,260.05 $23,940.99 $23,940.99 Labor Rates Management $172.41 Technical $141.75 Clerical $71.36 152 304 8 15 15 30 $23,940.99 $47,881.98 1,520 1,520 76 76 152 152 $239,409.88 $239,409.88 11,135 23,300 $1,525,135 $3,190,000 $3,050,000 $6,240,000 bject over the next three years. %); and Clerical $71.36 ($33.98 + 110%). These rates are from the United States d industry group.” The rates are from column 1, “Total compensation.” The rates s of employing workers beyond their wages and benefits, including business s are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical for one week), with an additional 40 hours for the establishment of parameter ing). ctivities only apply to owners and operators of storage vessels that are subject to g equipment. 203 hrs/response Table 2: Average Annual EPA Burden and Cost – NESHAP for the Manufacture of Amino/Phenolic Resins (4 OOO) (Renewal) (A) Burden Item Initial performance test Repeat performance test c Report review a) Notification of construction/reconstruction b) Notification of anticipated startup c) Notification of actual startup d) Notification of modification e) Notification of compliance status f) Notification of performance test/review test report d g) Notification of process change h) Notification of inspection of storage vessel i) Notification of change in primary product j) Pre-compliance report k) Storage vessel initial compliance demonstration l) Periodic reports of compliance status e m) Semiannual summary report n) Reports of malfunctions TOTAL (rounded) f (B) (C) (D) Number of EPA Hours Per EPA Hours Occurrences Number of Per Respondent Respondents per Occurrence Respondent Per Year Per Year a Per Year (C=AxB) N/A 20 1 20 1 N/A N/A N/A N/A N/A 4 1 4 1 N/A N/A N/A N/A N/A 4 2 2 2 2 2 8 4 4 19 19 19 Assumptions: a This ICR assumes there are 19 respondents subject to the rule and that no additional respondents will become subject over the next three ye This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12 Clerical $30.88 (GS-6, Step 3, $19.30+ 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours hours. These rates are from the Office of Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The percent to account for the benefit packages available to government employees. b c We assume that it would take 20 hours once per year for the Agency to view the repeat performance test. d We assume that it will take 4 hours once per year for the Agency to review the notification of performance test and the performance test re We assume that it will take 4 hours twice per year for Agency to review the periodic report of compliance status. e f Totals have been rounded to three significant figures. Figures may not add exactly due to rounding. re of Amino/Phenolic Resins (40 CFR Part 63, Subpart (E) (F) (G) (H) Technical Management Clerical Hours Per Hours Per Hours Per Total Costs, $ b Year Year Year (E=CXD) (F=Ex0.05) (G=Ex0.1) 20 1 2 $1,280.11 Labor Rates $76.91 Management $57.07 Technical $30.88 Clerical 4 0.2 0.4 $256.02 152 76 76 7.6 3.8 3.8 377 15.2 7.6 7.6 $9,728.85 $4,864.43 $4,864.43 $21,000 ll become subject over the next three years 48.07 + 60%); Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and of Technical hours, and Clerical hours are 10 percent of Technical ich excludes locality, rates of pay. The rates have been increased by 60 e test. rmance test and the performance test report. pliance status. Capital/Startup vs. Operation and Maintenance (O&M) Costs (A) Continuous Monitoring Device pH Monitor (B) Capital/Startup Cost for One Respondent c (C) Number of New Respondents $1,382 0 (D) Total Capital/Startup Cost, (B X C) $0 Liquid Flow Monitor $691 0 $0 O&M $0 0 $0 a Continuous process vent control systems $3,330,054 0 $0 Monitoring equipment $30,293 0 $0 b Total $0 a We assume that there are 19 facilities in the Amino/Phenolic Resins category, however only 6 facilities are expected to operate emissions c process vents. Further, 4 out of 6 back-end process vents are able to comply with the standard without any additional controls. The EPA curr back-end CPVs located at 1 facility installed an RTO. Capital/Startup and Annual O&M Costs are average facility costs based on revised con information from industry provided to the EPA as part of the October 15, 2018 final rule. We assumed that facilities are in compliance with t amendments by October 15, 2019, and therefore there are no capital costs under this ICR renewal. For front-end CPVs at existing affected so these CPVs are able to meet the standard without any additional controls. See the memorandum “National Impacts Associated with Final Sta Storage Tanks in the Amino and Phenolic Resins Production Source Category” in Docket Id. No. EPA-HQ-OAR-2012-0133-0105 for additi b c Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. This ICR updates the capital and O&M costs from 2014 dollars (CEPCI CE Index 576.1) to 2024 dollars (CEPCI CE Index 796.2). ance (O&M) Costs (E) (F) Annual O&M Costs Number of for One Respondent Respondents c with O&M $415 19 $138 $2,080 $1,459,239 $4,313 19 19 2 19 (G) Total O&M (E X F) $7,878 $2,626 $39,520 $2,918,479 $81,954 $3,050,000 cilities are expected to operate emissions controls for continuous out any additional controls. The EPA currently anticipates that 2 average facility costs based on revised control technology vendor med that facilities are in compliance with the 2018 final rule For front-end CPVs at existing affected sources, it is expected that ational Impacts Associated with Final Standards for CPVs and PA-HQ-OAR-2012-0133-0105 for additional information. dollars (CEPCI CE Index 796.2). CEPCI 2014 CE INDEX 576.1 CEPCI 2024 CE 796.2 INDEX CEPCI Ratio 1.3820517 Total Annual Responses (A) (B) (C) (D) (E) Total Annual Responses E=(BxC)+D 0 Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Initial notification and performance tests 0 1 0 Repeat performance test 1 1 0 1 Malfunction reports 19 2 0 38 Semiannual compliance reports 19 2 0 38 Other reports 19 2 0 38 a a Total We assume that 5 percent of the initial tests will be repeated during each successive year. 115 Number of Respondents Respondents That Submit Reports (A) a (B) Respondents That Do Not Submit Any Reports (C) (D) (E) Number of Number of Existing Existing Number of Number of Respondents that Respondents Existing Respondents keep records but That Are Also Respondents (E=A+B+C-D) do not submit New reports Respondents Year Number of New Respondents a 1 0 19 0 0 19 2 0 19 0 0 19 3 0 19 0 0 19 Average 0 19 0 0 19 New respondents include sources with constructed, reconstructed and modified affected facilities.