Document
Microsoft Word - PRC-011-0
ICR 202611-1902-001 · OMB 1902-0252 · Object 174864600.
Document Viewer [pdf]
Status: Original and derived artifacts are available for this document.
Download: pdf
Loading document viewer…
Document Metadata
| File Type | application/pdf |
|---|---|
| File Title | Microsoft Word - PRC-011-0 |
| Author | zavanellih |
| Last Modified By | PScript5.dll Version 5.2.2 |
| File Modified | 2005-10-12 |
| File Created | 2005-10-12 |
| Conversion State | complete |
Extracted Text
Standard PRC-011-0 — UVLS System Maintenance and Testing A. Introduction 1. Title: Undervoltage Load Shedding System Maintenance and Testing 2. Number: PRC-011-0 3. Purpose: Provide system preservation measures in an attempt to prevent system voltage collapse or voltage instability by implementing an Undervoltage Load Shedding (UVLS) program. 4. Applicability: 4.1. Transmission Owner that owns a UVLS system 4.2. Distribution Provider that owns a UVLS system 5. Effective Date: April 1, 2005 B. Requirements R1. The Transmission Owner and Distribution Provider that owns a UVLS system shall have a UVLS equipment maintenance and testing program in place. This program shall include: R1.1. The UVLS system identification which shall include but is not limited to: R1.1.1. Relays. R1.1.2. Instrument transformers. R1.1.3. Communications systems, where appropriate. R1.1.4. Batteries. R2. R1.2. Documentation of maintenance and testing intervals and their basis. R1.3. Summary of testing procedure. R1.4. Schedule for system testing. R1.5. Schedule for system maintenance. R1.6. Date last tested/maintained. The Transmission Owner and Distribution Provider that owns a UVLS system shall provide documentation of its UVLS equipment maintenance and testing program and the implementation of that UVLS equipment maintenance and testing program to its Regional Reliability Organization and NERC on request (within 30 calendar days). C. Measures M1. Each Transmission Owner and Distribution Provider that owns a UVLS system shall have documentation that its UVLS equipment maintenance and testing program conforms with Reliability Standard PRC-011-0_R1. M2. Each Transmission Owner and Distribution Provider that owns a UVLS system shall have evidence it provided documentation of its UVLS equipment maintenance and testing program and the implementation of that UVLS equipment maintenance and testing program as specified in Reliability Standard PRC-011-0_R2. D. Compliance 1. Compliance Monitoring Process Adopted by NERC Board of Trustees: February 8, 2005 Effective Date: April 1, 2005 1 of 2 Standard PRC-011-0 — UVLS System Maintenance and Testing 1.1. Compliance Monitoring Responsibility Compliance Monitor: Regional Reliability Organization. 1.2. Compliance Monitoring Period and Reset Timeframe On request (30 calendar days). 1.3. Data Retention None specified. 1.4. Additional Compliance Information None. 2. Levels of Non-Compliance 2.1. Level 1: Documentation of the maintenance and testing program was complete, but records indicate implementation was not on schedule. 2.2. Level 2: Documentation of the maintenance and testing program was incomplete, but records indicate implementation was on schedule. 2.3. Level 3: Documentation of the maintenance and testing program was incomplete, and records indicate implementation was not on schedule. 2.4. Level 4: Documentation of the maintenance and testing program, or its implementation, was not provided. E. Regional Differences 1. None identified. Version History Version Date Action Change Tracking 0 April 1, 2005 Effective Date New 0 October 12, 2005 Level 2 Non-Compliance: Changed “incomplete” to “complete” and inserted “not” between “was” and “on.” Errata Adopted by NERC Board of Trustees: February 8, 2005 Effective Date: April 1, 2005 2 of 2