OMB control number
FERC-725G, RD25-1-000, RD25-2-000, RD25-3-000; RM25-3 Mandatory Reliability Standards for the Bulk-Power System: PRC Rel Stds.
OMB 1902-0252 · FERC.
OMB 1902-0252
This submission is for a renewal and update of RD25-10. Which updates to PREC-012-2 and PRC-017-1. The purpose of PRC-012-2 is to ensure that remedial action schemes (RAS) do not introduce unintentional or unacceptable reliability risks to the BES. The stated purpose of Reliability Standard PRC-017-1 is to ensure that all RAS are properly designed, meet performance requirements, and are coordinated with other protection systems and to ensure that maintenance and testing programs are developed and misoperations are analyzed and corrected
The latest form for FERC-725G, RD25-1-000, RD25-2-000, RD25-3-000; RM25-3 Mandatory Reliability Standards for the Bulk-Power System: PRC Rel Stds. expires 2028-07-31 and is listed under ICR 202605-1902-003.
Latest Forms, Documents, and Supporting Material
All Historical Document Collections
OMB Details
Transmission Relay Loadability Mandatory Reliability Standard (PRC-006-5)
Federal Enterprise Architecture: Energy - Energy Resource Management