FERC-725G (DLO in RD22-2-000), Mandatory Reliability Standards for the Bulk-Power System: PRC Rel Stds.
Revision of a currently approved collection
No
Regular
Approved with change
05/18/2023
10/25/2022
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
05/31/2026
36 Months From Approved
09/30/2024
10,377
0
10,227
714,272
0
709,664
0
0
0
(An attachment to all standards within FEC-725G can be found in the Supplementary Document Section.) RD22-2:⢠PRC-002-3 is applicable to the RC, TO and GO and NERC proposes to modify the applicability of the PRC-002-3 standard to remove PCs as a responsible entity subject to the standard and replace any references in the standard that would have included PCs with references to RCs. NERC concluded that the RC was the appropriate entity to carry out the duties that currently apply to PCs in certain interconnections, including the identification of BES elements that are part of an IROL or stability-related SOL.
⢠PRC-023-5 is applicable to the TO, GO, DP and PC and NERC proposes to modify Section B2 of Attachment B to PRC-023-5 as follows:
âB2. The circuit is selected by the Planning Coordinator or Transmission Planner based on Planning Assessments of the Near-Term Transmission Planning Horizon that identify instances of instability, Cascading, or uncontrolled separation, that adversely impact the reliability of the Bulk Electric System for planning events. â
Attachment B sets the criteria used to determine the circuits in a Planning Coordinator area for which Transmission Owners, Generator Owners, and Distribution Providers must comply with certain requirements in the standard applicable to protective relays.
⢠PRC-026-2 is applicable to the GO, PC and TO and NERC proposes modification to the PRC-026-2 standard, Requirement R1, Criteria 1, 2, and 4 to replace references to planning horizon SOLs with references to the TPL-001-4 Planning Assessment.
For 725G (PRC Reliability Standards), the change (increase in responses and increase in manhours) is due to agency discretion as we have updated the method to determine affected entities and their responses. Additionally, changes have occurred since last cycle in the number of NERC Registered Entities who may have to follow these Reliability Standards.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.