Part 25 of the Federal Communications Commission's Rules Governing the Licensing of, and Spectrum Usage By, Commercial Earth Stations and Space Stations
ICR 202611-3060-016 · OMB 3060-0678 · Received in OIRA
Part 25 of the Federal Communications Commission's Rules Governing the Licensing of, and Spectrum Usage By, Commercial Earth Stations and Space Stations
Revision of a currently approved collection
No
Regular
11/13/2026
table that charts list comparision
Requested
Previously Approved
36 Months From Approved
07/31/2028
4,223
3,591
37,129
27,748
7,159,040
4,154,267
On August 8, 2025, the Commission released a Second Report and Order, FCC 25-48, IB Docket Nos. 22-411 and 22-271, titled âExpediting Initial Processing of Satellite and Earth Station Applications; and Space Innovation.â In this Streamlining Second Report and Order, the Commission streamlines, simplifies, and modernizes the processing of space and earth station applications. Specifically, the Second Report and Order: (1) adopts a new process by which earth station operators may receive a baseline license without identifying a specific satellite point of communication, and adopts a procedure by which earth station applicants can easily add or remove identified points of communication; (2) expands the list of license modifications that do not require prior authorization; (3) eliminates the requirement to retain paper copies of applications; (4) changes the default ex parte status of all space station and earth station applications from ârestrictedâ to âpermit-but-disclose;â (5) adopts expanded timeframes to file license renewal applications for earth stations and replacement applications for non-geostationary orbit (NGSO) space stations; (6) provides non-U.S. licensed market access grantees the ability to receive the equivalent of a grant of special temporary authority; and (7) adopts a 30-day shot clock for earth station renewal applications.
On May 1, 2026, the Commission released a Report and Order, FCC 26-26, SB Docket No. 25-157, titled âModernizing Spectrum Sharing for Satellite Broadband.â In this Report and Order, the Commission that revised the spectrum sharing framework for Geostationary Orbit (GSO) and NGSO systems that currently relies on NGSO systems complying with Equivalent Power Flux Density (EPFD) limits developed in the late-1990s. The consequence today of applying such EPFD limits in the United States is that operators must overprotect GSO systems, which in turn means that American households and businessesâmost critically in rural and remote areasâdo not receive the fastest space-based NGSO satellite broadband American innovation has available. Based on the technical record in this proceeding, the Order replaced the EPFD framework with modern, performance-based GSO protection criteria. The Order extended the Commission's framework for good-faith coordination and allowed NGSO and GSO operators to bargain for appropriate interference protections through voluntary, private agreement. The Order further adopted technical backstops to protect GSO systems when coordination has not been reached. Under the new rules, prior to commencing operations, an NGSO FSS applicant must either certify that it has completed a coordination agreement with any operational co-frequency GSO satellite network, or submit for Commission approval a compatibility showing which demonstrates by use of a degraded throughput methodology that it will not cause unacceptable interference to any such system with which coordination has not been completed. The requirement for NGSO licensees to submit a compatibility showing implicates the Paperwork Reduction Act.
The Commission is reporting program changes to this information collection. Specifically, information collections requiring applicants to maintain a physical hard copy of their electronically filed application, earth station operators to file a modification application for certain changes, NGSO space station operators to file a modification application for certain changes, and GSO satellites to file for special temporary authority for relocation during drift, are no longer being collected due to changes adopted in the Streamlining Second Report and Order. Therefore, the program changes/increases are as follows: 379 to the number of respondents, 379 to the annual number of responses, 8,369 to the annual burden hours and $938,575 to the annual cost.
The Commission is reporting also adjustments to this information collection which are due to trends that Commission staff have been seeing in the past year since the industry is changing/growing so rapidly. These adjustments/increases are as follows: 253 to the number of respondents, 253 to the annual number of responses, 1,012 to the annual burden hours and $2,066,196 to the annual cost.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.