The Post-Enumeration Survey (PES) for the 2020 Census will be conducted to provide estimates of census net coverage error and components of census coverage (such as correct enumerations, omissions, and erroneous enumerations, including duplicates) for housing units and people living in housing units to improve future censuses. The primary sampling unit is the Basic Collection Unit, which is the smallest unit of collection geography for 2020 Census listing operations. As in the past, including the 2020 Census Coverage Measurement program, the Post-Enumeration Survey operations and activities must be conducted separate from and independent of the other 2020 Census operations. The 2020 PES will use the dual-system estimation procedure, which depends on two independent systems of measurement. The independence between the PES and census operations is a fundamental necessity for dual-system estimation. The PES will comprise two independent enumerations of housing units and the household population within the same sample areas. These two enumerations are called the enumeration sample (E sample) and the population sample (P sample). The E sample contains the list of housing units and people enumerated in the 2020 Census within a sample of BCUs. The P sample contains housing units and people in the sample set of sample BCUs, but obtained independently from the census. The independent roster of housing units is obtained during the PES Independent Listing, while the independent roster of people is obtained during the PES Person Interview. The P sample housing units and people will be matched to all census housing units in the sample BCUs and surrounding BCUs. The results of the housing unit matching operations will be used to determine which PES and census addresses will be eligible to go to the PES Person Followup operation.
The latest form for 2020 Census Post-Enumeration Survey Person Interview and Person Followup expires 2023-01-31 and can be found here.
Document Name |
---|
Form |
Form and Instruction |
Justification for No Material/Nonsubstantive Change |
Justification for No Material/Nonsubstantive Change |
Justification for No Material/Nonsubstantive Change |
Justification for No Material/Nonsubstantive Change |
Supporting Statement B |
Supporting Statement A |
Approved with change |
No material or nonsubstantive change to a currently approved collection | 2021-04-28 | |
Approved without change |
No material or nonsubstantive change to a currently approved collection | 2021-02-02 | |
Approved with change |
No material or nonsubstantive change to a currently approved collection | 2020-11-23 | |
Approved without change |
No material or nonsubstantive change to a currently approved collection | 2020-08-17 | |
Approved with change |
New collection (Request for a new OMB Control Number) | 2019-11-13 |
Federal Enterprise Architecture: General Government - Central Records & Statistical Mgt
Form PES PI RI 2020 | PES Person Interview Reinterview | Fillable Fileable | Form and instruction |
Form PES PI 2020 | PES Person Interview | Fillable Fileable | Form and instruction |
Review document collections for all forms, instructions, and supporting documents - including paper/printable forms.