FERC-725B, Revisions in Docket No. RD21-6-000 (replacement of Reliability Standards CIP-004-6 and CIP-011-2 with CIP--004-7 and CIP-011-3)

OMB 1902-0248

OMB 1902-0248

Final Rule in RM18-20. Pursuant to section 215(d)(2) of the Federal Power Act (FPA), the Commission approves Reliability Standard CIP-012-1 (Cyber Security – Communications between Control Centers). The North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO), submitted Reliability Standard CIP-012-1 for Commission approval in response to a Commission directive in Order No. 822. In Order No. 822, the Commission directed NERC, pursuant to section 215(d)(5) of the FPA, to develop modifications to the Reliability Standards to require responsible entities to implement controls to protect, at a minimum, communications links and sensitive bulk electric system data communicated between bulk electric system Control Centers “in a manner that is appropriately tailored to address the risks posed to the bulk electric system by the assets being protected (i.e., high, medium, or low impact).”

The latest form for FERC-725B, Revisions in Docket No. RD21-6-000 (replacement of Reliability Standards CIP-004-6 and CIP-011-2 with CIP--004-7 and CIP-011-3) expires 2021-12-31 and can be found here.

All Historical Document Collections
Withdrawn and continue
Revision of a currently approved collection 2023-12-20
Approved without change
Revision of a currently approved collection 2023-05-03
Comment filed on proposed rule and continue
Revision of a currently approved collection 2022-10-07
Approved with change
Revision of a currently approved collection 2021-11-15
Comment filed on proposed rule and continue
Revision of a currently approved collection 2021-02-17
Approved with change
Revision of a currently approved collection 2020-02-13
Comment filed on proposed rule and continue
Revision of a currently approved collection 2019-04-30
Approved without change
Revision of a currently approved collection 2018-10-29
Approved without change
Revision of a currently approved collection 2018-05-03
Comment filed on proposed rule and continue
Revision of a currently approved collection 2017-11-22
Approved with change
Revision of a currently approved collection 2016-01-27
Comment filed on proposed rule and continue
Revision of a currently approved collection 2015-09-16
Approved without change
Extension without change of a currently approved collection 2015-06-30
Approved without change
Revision of a currently approved collection 2014-02-28
Comment filed on proposed rule and continue
Revision of a currently approved collection 2014-02-19
Approved with change
Revision of a currently approved collection 2013-12-09
Comment filed on proposed rule and continue
Revision of a currently approved collection 2013-07-24
Comment filed on proposed rule and continue
Revision of a currently approved collection 2013-05-07
Approved without change
Revision of a currently approved collection 2012-04-27
Comment filed on proposed rule and continue
Revision of a currently approved collection 2011-09-28
Approved with change
Extension without change of a currently approved collection 2011-04-13
Approved without change
Existing collection in use without an OMB Control Number 2008-02-07
Comment filed on proposed rule
New collection (Request for a new OMB Control Number) 2007-08-07
OMB Details

FERC-725B, Mandatory Reliability Standards for Critical Infrastructure Protection

Federal Enterprise Architecture: Energy - Energy Conservation and Preparedness


© 2024 OMB.report | Privacy Policy