NRC ONLINE FORM, “REQUEST FOR ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)"

OMB 3150-0244

OMB 3150-0244

10 CFR 50.55a incorporates by reference Division 1 rules of Section III, "Rules for Construction of Nuclear Power Plant Components," and Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code); and the rules of the ASME “Code for Operation and Maintenance of Nuclear Power Plants” (OM Code). These rules of the ASME B&PV and OM Codes set forth the requirements to which nuclear power plant components are designed, constructed, tested, repaired, and inspected. The ability of licensed facilities to comply with these requirements may be negatively impacted by the Coronavirus Disease 2019 (COVID-19) Public Health Emergency (PHE) in order to not conflict with practices recommended by the Centers for Disease Control and Prevention (CDC) to limit the spread of COVID-19 (e.g., social distancing) while performing in-service testing and inspections.To facilitate licensees’ requests for alternatives to the requirements in the above regulations, the NRC is providing an online form to submit the required information for a specific alternative request.

The latest form for NRC ONLINE FORM, “REQUEST FOR ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)" expires 2022-01-31 and can be found here.


© 2024 OMB.report | Privacy Policy