NRC ONLINE FORM, “REQUEST FOR
ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)"
Revision of a currently approved collection
No
Regular
12/13/2021
Requested
Previously Approved
36 Months From Approved
01/31/2022
297
218
1,782
872
0
0
10 CFR 50.55a incorporates by
reference Division 1 rules of Section III, "Rules for Construction
of Nuclear Power Plant Components," and Section XI, "Rules for
Inservice Inspection of Nuclear Power Plant Components," of the
American Society of Mechanical Engineers (ASME) Boiler and Pressure
Vessel Code (B&PV Code); and the rules of the ASME “Code for
Operation and Maintenance of Nuclear Power Plants” (OM Code). These
rules of the ASME B&PV and OM Codes set forth the requirements
to which nuclear power plant components are designed, constructed,
tested, repaired, and inspected. The ability of licensed facilities
to comply with these requirements may be negatively impacted by the
Coronavirus Disease 2019 (COVID-19) Public Health Emergency (PHE)
in order to not conflict with practices recommended by the Centers
for Disease Control and Prevention (CDC) to limit the spread of
COVID-19 (e.g., social distancing) while performing in-service
testing and inspections.To facilitate licensees’ requests for
alternatives to the requirements in the above regulations, the NRC
is providing an online form to submit the required information for
a specific alternative request.
The previous estimate of 4
hours per online form request was increased to 6 hours to reflect
additional hours needed for licensees who will utilize the new
features in the form, i.e., a field to allow licensee to submit
sensitive information, as well as the capability to add attachments
to build their alternative request from scratch vs. copying over
from an existing version into the form. Additionally, the NRC staff
identified additional potential respondents that were not included
in the previous clearance. These include … in accordance with 10
CFR Part 50, which states “…applicant for or holder of an operating
license or construction permit issued under this part, applicant
for a standard design certification under part 52 of this chapter
(including an applicant after the Commission has adopted a final
design certification regulation), or an applicant for or holder of
a standard design approval, a combined license…”, are potential
respondents, thus were added as such, increasing the number of
responses from 218 in the previous cycle to 297 for this
cycle.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.