NRC ONLINE FORM, “REQUEST FOR ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)"

ICR 202112-3150-005

OMB: 3150-0244

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2021-12-10
Supporting Statement A
2021-12-10
ICR Details
3150-0244 202112-3150-005
Received in OIRA 202011-3150-003
NRC
NRC ONLINE FORM, “REQUEST FOR ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)"
Revision of a currently approved collection   No
Regular 12/13/2021
  Requested Previously Approved
36 Months From Approved 01/31/2022
297 218
1,782 872
0 0

10 CFR 50.55a incorporates by reference Division 1 rules of Section III, "Rules for Construction of Nuclear Power Plant Components," and Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code); and the rules of the ASME “Code for Operation and Maintenance of Nuclear Power Plants” (OM Code). These rules of the ASME B&PV and OM Codes set forth the requirements to which nuclear power plant components are designed, constructed, tested, repaired, and inspected. The ability of licensed facilities to comply with these requirements may be negatively impacted by the Coronavirus Disease 2019 (COVID-19) Public Health Emergency (PHE) in order to not conflict with practices recommended by the Centers for Disease Control and Prevention (CDC) to limit the spread of COVID-19 (e.g., social distancing) while performing in-service testing and inspections.To facilitate licensees’ requests for alternatives to the requirements in the above regulations, the NRC is providing an online form to submit the required information for a specific alternative request.

None
None

Not associated with rulemaking

  86 FR 35368 07/02/2021
86 FR 70149 12/09/2021
No

1
IC Title Form No. Form Name
NRC ONLINE FORM, "REQUEST FOR ALTERNATIVE UNDER 10 CFR Part 50.55a(z)(1) and (2)"

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 297 218 0 0 79 0
Annual Time Burden (Hours) 1,782 872 0 0 910 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
The previous estimate of 4 hours per online form request was increased to 6 hours to reflect additional hours needed for licensees who will utilize the new features in the form, i.e., a field to allow licensee to submit sensitive information, as well as the capability to add attachments to build their alternative request from scratch vs. copying over from an existing version into the form. Additionally, the NRC staff identified additional potential respondents that were not included in the previous clearance. These include … in accordance with 10 CFR Part 50, which states “…applicant for or holder of an operating license or construction permit issued under this part, applicant for a standard design certification under part 52 of this chapter (including an applicant after the Commission has adopted a final design certification regulation), or an applicant for or holder of a standard design approval, a combined license…”, are potential respondents, thus were added as such, increasing the number of responses from 218 in the previous cycle to 297 for this cycle.

$1,657,260
No
    No
    No
No
No
No
Yes
Leslie Hill 3014152158 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 