HUD-52483-A Proposal for Public Housing Project

Public Housing Capital Fund Financing

52483-A

Public Housing Capital Fund Financing

OMB: 2577-0157

Document [pdf]
Download: pdf | pdf
U.S. Department of Housing
and Urban Development
Office of Public and Indian Housing

Proposal for a
Public Housing Project

OMB Approval No. 2577-0157 (Exp. 11/30/2008)

See Public Reporting Burden Statement on Page 3.
Project Number:

1234
1234
1234
1234 P
1234
1234

If an ACC for Front-End Funds was executed: Allocation Area:

1234
1234
1234
1234
1234
1234

Loan Authority=_______________
Contract Authority= $____________
Date:
_______________

PHA inside Central City
Allocation Area
PHA outside Central City
Allocation Area

Metro Area
Non-Metro Area

Part I—PHA Data
1. Name of PHA:

3.
4.
5.
6.

2. Address of PHA:

PHA area of jurisdiction
includes the community for which public housing development assistance is being requested.
The required Cooperation Agreements
are executed for the proposed project.
A current General Certificate: (a)
is attached (b)
was submitted, dated
, and is still valid.
The required PHA resolution authorizing submission of this PHA Proposal, etc., (a)
is attached (b)
was submitted, dated

Part II—Proposal Project Summary and Development Schedule
Section A. Project Location
1. Community:

2. County or Other Similar Area:

3. Congressional District(s)

4. Census Tracts/Enumeration District(s)

Section B. Housing Type and Development Method
1. Housing Type and Development Method

9. If Turnkey:

(1) Conventional
(2) Turnkey
(a) New Construction
(3) Acquisition
(b) Rehabilitation
(c) Existing

(a)
(b)
(c)

3. Congregate or other special-use housing

RFP and Developer's Packet is attached.
(a)
is
(b)
is not proposed. If “Yes”
PHA selected Turnkey Proposal is attached.
specify use(s) and number of units:
PHA certifies that Turnkey Proposal was selected
based on an objective rating system using such
factors as site location, project design, price and
developer experience.

Section C. Dwelling Units by Household Type and Structure Type
As appropriate, enter the number of dwelling units (DUs), proposed for this project by number of bedrooms, structure and household type.
Column 1

Column 2

Structure
Type 1

No. of
Buildings

Column 3
Total DUs
(a)
Total

Column 4
Number of Family and Large Family DUs

(b)
Family

(c)
Elderly

(a)
1-BR

(b)
2-BR

(c)
3-BR

(d)
4-BR

(e)
5-BR

Column 5
Number of Elderly DUs
(f)
6-BR

(a)
Efficiency

(b)
1-BR

(c)
2-BR

1
2
3
4
5
6

D
SD
E
W
E2
Totals
Number in
7 Line 6 for
Hdcp.
1 Structure Types are: D=Detached; SD=Semi-Detached; R=Row or Townhouse, W=Walkup; and E=Elevator
2 Justification required; See Part III, Item A.4, Density
Section D. Proposed Project Development Schedule
Schedule each processing step for the proposed project in the “PHA Estimate”
Number of Calendar Days
column by entering the estimated number of calendar days required.
Processing Steps
(1) PHA Estimate
(2) HUD Use
1. Site Documents
2. Design Documents
3. Construction Documents
4. Contract Documents
5. Construction Start
6. Completion or Acquisition
7.

(a) PHA Submission
(b) HUD Decision
(a) PHA Submission
(b) HUD Decision
(a) PHA Submission
(b) HUD Decision
(a) PHA Submission
(b) HUD Decision

8. Date by which complete proposal
will be submitted:

25

25

9. State the earliest option expiration date and
identify the applicable site:

45

45

_____________________________________

45

45

_____________________________________

15

15

_____________________________________

_____________________________________

Total
Page 1 of 3

form HUD-52483-A (5/94)
ref Handbook 7417.1

Part III—Proposal Content
Section A. Proposed Site, Project Description and Construction Cost
1. One to Four Family Properties: A scattered site housing project involving one to four family properties is proposed: (a)

Yes, (b)

No. If Yes, the

a neighborhood map identifying specific boundaries within which the PHA proposed to acquire sites or properties; (2)

following are attached: (1)

description of the structural types, unit sizes, and conditions of typical housing in each of the specified neighborhoods; (3)
or existing houses, as applicable to the proposal, are regularly offered for sale within cost limitations; and (4)

a

evidence that vacant sites

for projects involving 1-to-4-family

properties, the attached schedule demonstrates that all properties will be acquired by the PHA within one year of ACC execution and identifies the
number of units and dates by which property specific site acquisition documents will be submitted.
2. Site Design and Cost Reports: (1) Number of sites in proposed project _______; (b) Number of Forms HUD-52651-A attached _______; (c) A Form
each proposed site and/or (2)

HUD-52651-A with required exhibits is attached for: (1)

a site comprising several contiguous parcels having

a separate Form HUD-52651-A is attached summarizing the proposed project as a whole.

common exhibits and information; (d)

3. Proposed Construction Cost/Price: The total construction cost/price proposed is $ ______________________________ , with a per unit cost/price
proposed of $ _____________________________________________________________________________________________________________.
the PHA proposes a project density which meets HUD requirements including those of compatibility for the number and ages of the

4. Density: (a)

intended residents; (b) the proposed project: (1)
is not applicable, (2)

is attached, or (3)

5. Schools: A letter from the school board (a)

is

(2)

is not a scattered-site project; (c) justification for the use of high-rise structures: (1)

was previously submitted to the Field Office on _____________________________________ (date).
is attached (b)

is not required.

6. PHA: The PHA selected the proposed site(s) to comply with the locations for assisted housing identified in the HUD-approved PHA: (a)

Yes or (b)

Not Applicable.
7. Facilities and Services: For the intended residents, the PHA proposes a project for which: (a)

Proposed Facility/Service

8. Nondwelling Space: (a)

Source of Funding

Completion Date

applicable amounts and cost of such space and/or (c)

nondwelling space is also for other public housing projects and the

nondwelling space is also for projects under other assisted housing programs.

9. Utility Combination: The attached Comparative Analysis of Utility Costs (Form HUD-51994) (a)

is the one prepared by the Field Office or

is a revised one prepared pursuant to requirements.

10. Housing Opportunities: (a)
(b)

Remarks

the project nondwelling space proposed complements the facilities and services referred to in Item 7 above. If nondwelling space

is not exclusively for the proposed project, an attachment state the extent that (b)

(b)

the facilities and services as currently exist, meet or

with the addition of the following, the facilities will meet or exceed HUD requirements:

exceed HUD requirements; or (b)

the PHA selected the proposed project site to comply with or exceed HUD housing opportunity requirements and

the following information has been added to the locality map required by the Form HUD-52651-A: (1) the percentage of minority residents for each of

the locality's areas of minority concentration and racially mixed areas; and (2) existing and proposed HUD and other assisted housing.
11. Environmental:

the PHA proposes a project which complies with or exceeds HUD environmental requirements.

12. Relocation: Displacement (a)
A, identifies: (1)
pant; (2)

is (b)

is not involved. If displacement is involved, (c) an attachment, in addition to that required by the Form HUD-52651-

the type of notice (Notice of Displacement, Notice of Right to Continue in Occupancy, or other notice) proposed to be issued to each occu-

the estimated cost of any required relocation benefits; and (d) the following summarizes potential displacement:

(1) Type of
Occupant

a. Total
Number

b. Eligible for
Assisted Housing

c. Estimated
Relocation Cost

(2) Sources of Relocation Cost Funds
a. Source

1. Families

1. CDBG

2. Individuals

2. Public Housing

3. Business Concerns

xxxxxxxxxxxxxxxxxx

3.

4. Nonprofit Institutions

xxxxxxxxxxxxxxxxxx

4.

5.

Total

5.

b. Amount

Total

Section B. Demonstration of Financial Feasibility
This PHA has demonstrated financial feasibility: (1)
with the aid of operating subsidy or
(2)
without the need for operating subsidy, and a
Demonstration of Financial Feasibility (Form HUD-52485) or other demonstration pursuant to HUD instructions is attached.

Page 2 of 3

form HUD-52483-A (5/94)
ref Handbook 7417.1

Section C. Professional Assistant to PHA
The following ___________ (enter the number) professional service contracts are attached:
1. Service

2. Name and Address of Firm or Individual

a.

a.

b.

b.

c.

c.

d.

d.

Section D. Annual Contributions Contract
Three original, signature copies of the following are attached:
1.

Form HUD-53010. Part One of the ACC (Form HUD-53010) signed and dated by the authorized PHA official. (Part Two should not be returned.)

2.

Forms HUD-274 and HUD-51999. The Designation of Depository for Direct Deposit of Loan or Grant Funds (Form HUD-274) and the General
Depository Agreement (Form HUD-51999) signed and dated by the authorized PHA official and bank representative.

3.

Forms HUD-9204, HUD-52250 and HUD-5412. The Project Loan Note (Form HUD-9204), the Permanent Note (Form HUD-52250), and the Note
Signature Certificate (Form HUD-5412) signed and dated by the authorized PHA official.

Section E. Request for Advances
1. A PHA request for advances (a)

is attached (b)

is not attached.

2. Funds required are for: (a)
planning expenses required for the first calendar quarter following Field Office execution of the ACC ($ __________________
and/or (b)
site acquisition and related costs ($ ____________________ ).
3.

A detailed explanation of the nature and the amount of each obligation or proposed obligation and the extent that the obligation is necessary for the
proposed project is attached.

4.

The PHA certifies that required blanket fidelity bond and any other required insurance coverage is in force.

Section F. Signature
I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Warning: HUD will prosecute false claims and statements. Conviction may result in criminal and/or civil penalties. (18 U.S.C. 1001, 1010, 1012;
31 U.S.C. 3729, 3802)
Typed Name and Title of Authorized PHA Official:

Signature:

Date:

Public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. This agency may
not collect this information, and you are not required to complete this form, unless it displays a currently valid OMB control number.
This collection of information is required for developing a public housing project pursuant to HUD regulations 24 CFR 94l. The information will be used
to provide HUDwith sufficient information to enable a determination that funds should or should not be reserved or a contractual commitment made. This
information collection is mandated pursuant to the U.S. Housing Act of l937. The information requested does not lend itself to confidentiality.

Page 3 of 3

form HUD-52483-A (5/94)
ref Handbook 7417.1

