NSPS for the Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X) (Renewal)

ICR 200911-2060-008

OMB: 2060-0037

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2009-11-12
IC Document Collections
ICR Details
2060-0037 200911-2060-008
Historical Active 200609-2060-007
EPA/OAR 1061.11
NSPS for the Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 01/21/2010
Retrieve Notice of Action (NOA) 11/25/2009
  Inventory as of this Action Requested Previously Approved
01/31/2013 36 Months From Approved 01/31/2010
26 0 26
1,194 0 1,194
320,190 0 320,000

40 CFR part 60, subparts T, U, V, W, and X, applies to owners and operators of each phosphate fertilizer production and storage facility. The provisions of this subpart apply to wet-process phosphoric acid plants having a design capacity of more than 15 tons of equivalent P2O5 feed per calendar day. The affected facility includes any combination of: reactors, filters, evaporators, and hot wells. Any facility that commences construction or modification after October 22, 1974 is subject to the requirements. Owners and operators must conduct an initial performance test, record amounts of feed material and storage, record pressure drop across control devices, and comply with a total fluoride emission standard. In addition to the monitoring, recordkeeping and reporting requirements listed in the General Provisions (40 CFR part 60), the phosphate fertilizer industry is required to meet the specific requirements at 40 CFR part 60, subparts T, U, V, W, and X to determine if compliance has been achieved.

None
None

Not associated with rulemaking

  74 FR 32581 07/08/2009
74 FR 61676 11/25/2009
No

1
IC Title Form No. Form Name
NSPS for the Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 26 26 0 0 0 0
Annual Time Burden (Hours) 1,194 1,194 0 0 0 0
Annual Cost Burden (Dollars) 320,190 320,000 0 0 190 0
No
No

$1,154
No
No
Uncollected
Uncollected
No
Uncollected
Robert Marshall 202-564-7021 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/25/2009


© 2024 OMB.report | Privacy Policy