QID 200607 Peach Forecast

Fruit, Nuts, and Specialty Crops

0039 - Peach Forecast - PA Aug 09

Fruit, Nuts, and Specialty Crops

OMB: 0535-0039

Document [doc]
Download: doc | pdf

Project 134 QID 200607


OMB No. 0535-0039 Approval Expires 1/31/2010

PEACH FORECAST

August 2009


NATIONAL

AGRICULTURAL

STATISTICS

SERVICE




Pennsylvania Field Office

2301 N. Cameron Street

Room G-19

Harrisburg, PA 17110-9405

Phone: 1-800-498-1518

Fax: 1-800-498-1548

Email: [email protected]



Information is needed to forecast the expected peach crop in Pennsylvania. Response to this survey is voluntary and not required by law, but your reply to the questions on this form will be very helpful in determining the current peach crop. Individual reports will be kept confidential. Please return this inquiry promptly. Thank you for your cooperation.


Please make corrections to name, address and Zip Code, if necessary.


Definitions:


Bearing Acreage: Acres from which you will harvest peaches this year. Include blocks you rent from others, and exclude blocks rented out. Deduct any waste area within blocks.


Expected Production: The total bushels you anticipate harvesting. Consider the current condition of your orchards, and assume average weather and pest infestations until harvest.


Expected Percent of Full Crop: A full crop is the yield you would expect to achieve under normal production conditions. This yield may or may not be the maximum production potential for your operation. Therefore, your expected percent of full crop may exceed 100%. Example: you project a mature block should produce 250 bushels/acre and you estimate this year it will produce 300 bushels/acre or 120% of a full crop.


1. Bearing acres of peaches in 2009. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . acres

001

2. Expected percent of full crop. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . percent

002

3. Expected 2009 production (bushel = 48 pounds). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . bushels

003

4. 2008 production. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . bushels

004

Crop observations: Use other side if needed.






Respondent Name: _______________________________

Phone: ____________________________

9910 MM DD YY


Date: __ __ __ __ __ __


For office use only



Response

Respondent

Mode

Enum.

Eval.



1-Comp

2-R

3-Inac

4-Office Hold


5-R – Est

6-Inac – Est

7-Off Hold – Est

8-Known Zero

9901

1-Op/Mgr

2-Sp

3-Acct/Bkpr

4-Partner

9-Oth

9902

1-Mail

2-Tel

3-Face-to-Face

4-CATI

5-Web

6-e-mail

7-Fax

8-CAPI

19-Other

9903

098

100


According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0535-0039. The time required to complete this information collection is estimated to average 10 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.



File Typeapplication/msword
File TitleProject 134 QID 200607
AuthorMillBr
Last Modified ByDavid Hancock
File Modified2010-01-07
File Created2009-09-24

© 2024 OMB.report | Privacy Policy