Alteration of Unreasonable Obstructive Bridges

Alteration of Unreasonable Obstructive Bridges

1625-0073_Instructional Review 2010

Alteration of Unreasonable Obstructive Bridges

OMB: 1625-0073

Document [doc]
Download: doc | pdf

U.S. DEPARTMENT OF

HOMELAND SECURITY

U.S. COAST GUARD

ALTERATION OF UNREASONABLY OBSTRUCTIVE BRIDGES

OMB No. 1625-0073

Exp: mm/dd/yyyy


Who must comply?

Owners of permitted bridges over navigable waters of the US

What is this collection about?

If a permitted bridge that crosses a navigable water of the US is determined to be unreasonable obstruction to navigation, then the bridge owner is required to prepare and submit general plans, specifications, and mapping location for the alteration of the unreasonably obstructive bridge.

Where do I find the requirements for this information?

33 U.S.C. 494, 502, 511, 513, 514, 515 516, 517, 521, 522, 523 and 524

When must information be submitted to the Coast Guard?

Since the Federal Government will pay for the majority cost of the bridge; the required information must be provided once Congress has appropriated enough funding to start the project.

How is the information submitted?

By mail, phone, fax or when electronically possible submitted via:

1. [email protected]

2. Phone/Fax: 202-372-1512 / 202-372-1914

3. Commandant (CG-551)

Attn: Bridge Program

US Coast Guard

2100 2nd St. SW Stop 7683

Washington D.C. 20593-7683

What happens when complete information is received?

The information (general plans, specifications, and mapping location) is necessary to determine both the scope of the alteration project and the apportionment of cost. The information is reviewed to determine how to proceed with the alteration and to determine what part of the cost of alteration is betterment and what part is necessary to meet the needs of navigation.

For additional information, contact--


Commandant (CG-551)

Attn: Bridge Program

US Coast Guard

2100 2nd St. SW Stop 7683

Washington D.C. 20593-7683

e-mail: [email protected]



An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number.

The Coast Guard estimates that the average burden for this report is about 15 minutes. You may submit any comments concerning the accuracy of this burden estimate or any suggestions for reducing the burden to: Commandant (CG-543), U.S. Coast Guard, 2100 2nd St., SW, Stop 7581, Washington D.C. 20593-7581 or Office of Management and Budget, Paperwork Reduction Project (1625-0002), Washington, DC 20503.

File Typeapplication/msword
File Title1625-0093 Facilities Transferring Oil or Hazardous Materials in Bulk -- Letter of Intent and Operations Manual http://law
Authorsarabdeep.kaur
Last Modified ByArthur A. Requina
File Modified2010-10-19
File Created2010-08-11

© 2024 OMB.report | Privacy Policy