Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 1, Fluidized Bed | |||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||
1. | Applications | N/A | |||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||
3. | Reporting Requirements | ||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $100 | 1 | 40 | 41 | 1,640 | 82 | 164 | $107,220 | $4,100 | 0 | a,b,i,j | ||||
B. | Required Activities | ||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $3,704,400 | 0 | a | |||||
2) Annual stack test and test report | 40 | $21,348 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,k | |||||
3) Operator training and qualification | |||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 41 | 2,624 | 131 | 262 | $171,552 | $0 | 0 | a,b,j | |||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 41 | 2,952 | 148 | 295 | $192,996 | $0 | 0 | a,b,j | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $0 | 0 | a | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||
a) Initial capital costs | 0 | $2,773 | 1 | 0 | 60 | 0 | 0 | 0 | $0 | $166,400 | 0 | a,d | |||||
b) Annualized capital and O&M costs | 11 | $667 | 1 | 11 | 60 | 660 | 33 | 66 | $43,150 | $40,000 | 0 | c,e | |||||
C. | Create Information | Incl. in 3.B | |||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||
E. | Report Preparation | ||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 60 | 120 | 6 | 12 | $7,845 | $0 | 60 | ||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 60 | 120 | 6 | 12 | $7,845 | $0 | 60 | b,j | |||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 60 | 1,200 | 60 | 120 | $78,454 | $0 | 60 | ||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $0 | 60 | ||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 5 | 40 | 2 | 4 | $2,615 | $0 | 5 | g | |||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 5 | 80 | 4 | 8 | $5,230 | $0 | 10 | g | |||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 5 | 240 | 12 | 24 | $15,691 | $0 | 10 | h | |||||
ReportingSubtotal | 16,876 | 844 | 1,688 | $1,103,320 | $3,748,500 | 265 | |||||||||||
4. Recordkeeping Requirements | |||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||
E. Record Information | |||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 5 | 10 | 1 | 1 | $654 | $0 | 0 | g | |||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||
Recordkeeping Subtotal | 10 | 0.5 | 1 | $654 | $0 | 0 | |||||||||||
TOTAL: | 16,886 | 844 | 1,689 | $1,103,974 | $3,748,500 | 265 | |||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||
Summary of Respondent Burden | 19,419 | $1,103,974 | $3,748,500 | $4,852,474 | |||||||||||||
Initial Capital and Startup | $170,500 | ||||||||||||||||
Annualized Capital/Start-up and O & M | $3,748,500 | ||||||||||||||||
FOOTNOTES | |||||||||||||||||
a | One-time only costs. | ||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||
j | 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both | ||||||||||||||||
unit types are incorporated into the MH tables. | |||||||||||||||||
k | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 2, Fluidized Bed | |||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||||
1. | Applications | N/A | |||||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b,i | ||||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
2) Annual stack test and test report | 40 | $21,348 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $1,280,880 | 0 | c,k | |||||||
3) Operator training and qualification | |||||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 41 | 492 | 25 | 49 | $32,166 | $0 | 0 | c,j | |||||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 41 | 328 | 16 | 33 | $21,444 | $0 | 0 | c,j | |||||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial capital costs | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,d | |||||||
b) Annualized capital and O&M costs | 11 | $667 | 1 | 11 | 60 | 660 | 33 | 66 | $43,150 | $40,000 | 0 | c,e | |||||||
C. | Create Information | Incl. in 3.B | |||||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | b,j | |||||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $0 | 60 | ||||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 5 | 40 | 2 | 4 | $2,615 | $0 | 5 | g | |||||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 5 | 80 | 4 | 8 | $5,230 | $0 | 10 | g | |||||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 5 | 240 | 12 | 24 | $15,691 | $0 | 10 | h | |||||||
ReportingSubtotal | 6,640 | 332 | 664 | $434,110 | $1,320,880 | 85 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 5 | 10 | 1 | 1 | $654 | $0 | 0 | g | |||||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | ||||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | ||||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 41 | 984 | 49 | 98 | $64,332 | $0 | 0 | j | |||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||||
Recordkeeping Subtotal | 1404 | 70.2 | 140.4 | $91,791 | $0 | 0 | |||||||||||||
TOTAL: | 8,044 | 402 | 804 | $525,901 | $1,320,880 | 85 | |||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 9,251 | $525,901 | $1,320,880 | $1,846,781 | |||||||||||||||
Initial Capital and Startup | $0 | ||||||||||||||||||
Annualized Capital/Start-up and O & M | $1,320,880 | ||||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | One-time only costs. | ||||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||||
j | 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both | ||||||||||||||||||
unit types are incorporated into the MH tables. | |||||||||||||||||||
k | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 3, Fluidized Bed | |||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||||
1. | Applications | N/A | |||||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b,i | ||||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
2) Annual stack test and test report | 40 | $21,348 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $1,280,880 | 0 | c,k | |||||||
3) Operator training and qualification | |||||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 41 | 492 | 25 | 49 | $32,166 | $0 | 0 | c,j | |||||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 41 | 328 | 16 | 33 | $21,444 | $0 | 0 | c,j | |||||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial capital costs | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,d | |||||||
b) Annualized capital and O&M costs | 11 | $667 | 1 | 11 | 60 | 660 | 33 | 66 | $43,150 | $40,000 | 0 | c,e | |||||||
C. | Create Information | Incl. in 3.B | |||||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | b,j | |||||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 60 | 2,400 | 120 | 240 | $156,907 | $0 | 60 | ||||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 5 | 40 | 2 | 4 | $2,615 | $0 | 5 | g | |||||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 5 | 80 | 4 | 8 | $5,230 | $0 | 10 | g | |||||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 5 | 240 | 12 | 24 | $15,691 | $0 | 10 | h | |||||||
ReportingSubtotal | 6,640 | 332 | 664 | $434,110 | $1,320,880 | 85 | 0 | ||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 5 | 10 | 1 | 1 | $654 | $0 | 0 | g | |||||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | ||||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | j | |||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 41 | 82 | 4 | 8 | $5,361 | $0 | 0 | ||||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 41 | 984 | 49 | 98 | $64,332 | $0 | 0 | j | |||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||||
Recordkeeping Subtotal | 1404 | 70.2 | 140.4 | $91,791 | $0 | 0 | |||||||||||||
TOTAL: | 8,044 | 402 | 804 | $525,901 | $1,320,880 | 85 | |||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 9,251 | $525,901 | $1,320,880 | $1,846,781 | |||||||||||||||
Initial Capital and Startup | $0 | ||||||||||||||||||
Annualized Capital/Start-up and O & M | $1,320,880 | ||||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | One-time only costs. | ||||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||||
j | 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both | ||||||||||||||||||
unit types are incorporated into the MH tables. | |||||||||||||||||||
k | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Fluidized Bed | |||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor (Annualized Capital/Startup and O&M) Costs | Total Costs |
1 | 16,886 | 844 | 1,689 | 19,419 | $1,103,974 | $3,748,500 | $4,852,474 |
2 | 8,044 | 402 | 804 | 9,251 | $525,901 | $1,320,880 | $1,846,781 |
3 | 8,044 | 402 | 804 | 9,251 | $525,901 | $1,320,880 | $1,846,781 |
Total | 32,974 | 1,649 | 3,297 | 37,920 | $2,155,776 | $6,390,260 | $8,546,036 |
Average | 10,991 | 550 | 1,099 | 12,640 | $718,592 | $2,130,087 | $2,848,679 |
Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 1, Multiple Hearth | |||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||
1. | Applications | N/A | |||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||
3. | Reporting Requirements | ||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $100 | 1 | 40 | 69 | 2,760 | 138 | 276 | $180,443 | $6,900 | 0 | a,b,i | ||||
B. | Required Activities | ||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $8,890,560 | 0 | a | |||||
2) Annual stack test and test report | 40 | $23,302 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,j | |||||
3) Operator training and qualification | |||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 69 | 4,416 | 221 | 442 | $288,709 | $0 | 0 | a,b | |||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 69 | 4,968 | 248 | 497 | $324,798 | $0 | 0 | a,b | |||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | |||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $0 | 0 | a | |||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||
a) Initial capital costs | 0 | $1,688 | 1 | 0 | 144 | 0 | 0 | 0 | $0 | $243,000 | 0 | a,d | |||||
b) Annualized capital and O&M costs | 11 | $389 | 1 | 11 | 144 | 1,584 | 79 | 158 | $103,559 | $56,000 | 0 | c,e | |||||
C. | Create Information | Incl. in 3.B | |||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||
E. | Report Preparation | ||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 144 | 288 | 14 | 29 | $18,829 | $0 | 144 | ||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 144 | 288 | 14 | 29 | $18,829 | $0 | 144 | b,j | |||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 144 | 2,880 | 144 | 288 | $188,289 | $0 | 144 | ||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $0 | 144 | ||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 7 | 56 | 3 | 6 | $3,661 | $0 | 7 | g | |||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 7 | 112 | 6 | 11 | $7,322 | $0 | 14 | g | |||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 7 | 336 | 17 | 34 | $21,967 | $0 | 14 | h | |||||
ReportingSubtotal | 34,968 | 1,748 | 3,497 | $2,286,140 | $8,953,460 | 611 | |||||||||||
4. Recordkeeping Requirements | |||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||
E. Record Information | |||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 7 | 14 | 1 | 1 | $915 | $0 | 0 | g | |||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||
Recordkeeping Subtotal | 14 | 0.7 | 1.4 | $915 | $0 | 0 | |||||||||||
TOTAL: | 34,982 | 1,749 | 3,498 | $2,287,055 | $8,953,460 | 611 | |||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||
Summary of Respondent Burden | 40,229 | $2,287,055 | $8,953,460 | $11,240,515 | |||||||||||||
Initial Capital and Startup | $249,900 | ||||||||||||||||
Annualized Capital/Start-up and O & M | $8,953,460 | ||||||||||||||||
FOOTNOTES | |||||||||||||||||
a | One-time only costs. | ||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||
j | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 2, Multiple Hearth | |||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||||
1. | Applications | N/A | |||||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b,i | ||||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
2) Annual stack test and test report | 40 | $23,302 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $3,355,488 | 0 | c,j | |||||||
3) Operator training and qualification | |||||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 69 | 828 | 41 | 83 | $54,133 | $0 | 0 | c | |||||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 69 | 552 | 28 | 55 | $36,089 | $0 | 0 | c | |||||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial capital costs | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,d | |||||||
b) Annualized capital and O&M costs | 11 | $389 | 1 | 11 | 144 | 1,584 | 79 | 158 | $103,559 | $56,000 | 0 | c,e | |||||||
C. | Create Information | Incl. in 3.B | |||||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | b,j | |||||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $0 | 144 | ||||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 7 | 56 | 3 | 6 | $3,661 | $0 | 7 | g | |||||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 7 | 112 | 6 | 11 | $7,322 | $0 | 14 | g | |||||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 7 | 336 | 17 | 34 | $21,967 | $0 | 14 | h | |||||||
ReportingSubtotal | 14,988 | 749 | 1,499 | $979,886 | $3,411,488 | 179 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 7 | 14 | 1 | 1 | $915 | $0 | 0 | g | |||||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 69 | 1,656 | 83 | 166 | $108,266 | $0 | 0 | ||||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||||
Recordkeeping Subtotal | 2360 | 118 | 236 | $154,292 | $0 | 0 | |||||||||||||
TOTAL: | 17,348 | 867 | 1,735 | $1,134,178 | $3,411,488 | 179 | |||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 19,950 | $1,134,178 | $3,411,488 | $4,545,666 | |||||||||||||||
Initial Capital and Startup | $0 | ||||||||||||||||||
Annualized Capital/Start-up and O & M | $3,411,488 | ||||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | One-time only costs. | ||||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||||
j | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines | |||||||||||||||||||
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 3, Multiple Hearth | |||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | ||||||||||||
Respondent | Non-Labor | Number of | Hours | Number of | Technical | Management | Clerical | Total | Total | Total | |||||||||
Hours per | Costs | Occurrences | Per | Respondents | Hours | Hours | Hours | Labor Costs | Non-Labor | Responses | |||||||||
Occurrence | Per | Per | Respondent | Per Year | Per Year | Per Year | Per Year | Per Year | Costs | Per Year | |||||||||
(Technical | Occurrence | Respondent | Per Year | Per Year | |||||||||||||||
Burden Item | hours) | Per Year | (C=A x B) | (CXD) | (E x 0.05) | (E x 0.1) | |||||||||||||
1. | Applications | N/A | |||||||||||||||||
2. | Surveys and Studies | N/A | |||||||||||||||||
3. | Reporting Requirements | ||||||||||||||||||
A. | Read and Understand Rule Requirements | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b,i | ||||||
B. | Required Activities | ||||||||||||||||||
1) Initial stack test and report | 40 | $61,740 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
2) Annual stack test and test report | 40 | $23,302 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $3,355,488 | 0 | c,j | |||||||
3) Operator training and qualification | |||||||||||||||||||
a) Establish and teach operator qualification course | 64 | $0 | 1 | 64 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
b) Obtain operator qualification | 72 | $0 | 1 | 72 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,b | |||||||
c) Annual refresher course | 12 | $0 | 1 | 12 | 69 | 828 | 41 | 83 | $54,133 | $0 | 0 | c | |||||||
d) Initial review of site-specific information | Incl. in a. | ||||||||||||||||||
e) Annual review of site-specific information | 8 | $0 | 1 | 8 | 69 | 552 | 28 | 55 | $36,089 | $0 | 0 | c | |||||||
4) Establish operating parameters (maximum and minimum) | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | |||||||
5) Continuous parameter monitoring (including CEMS) | |||||||||||||||||||
a) Initial capital costs | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,d | |||||||
b) Annualized capital and O&M costs | 11 | $389 | 1 | 11 | 144 | 1,584 | 79 | 158 | $103,559 | $56,000 | 0 | c,e | |||||||
C. | Create Information | Incl. in 3.B | |||||||||||||||||
D. | Gather Information | Incl. in 3.E | |||||||||||||||||
E. | Report Preparation | ||||||||||||||||||
1) Notification of initial performance test | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Notification of initial CMS Demonstration | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | b,j | |||||||
3) Final Control Plan | 20 | $0 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
4) Initial Compliance Report | 40 | $0 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
5) Report for site-specific parameter petition | 14 | $0 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a,f | |||||||
6) Annual Compliance Report | 40 | $0 | 1 | 40 | 144 | 5,760 | 288 | 576 | $376,578 | $0 | 144 | ||||||||
7) Status report for operators that are off-site for more than 2 weeks | 8 | $0 | 1 | 8 | 7 | 56 | 3 | 6 | $3,661 | $0 | 7 | g | |||||||
8) Corrective action summary for operators that are off-site | |||||||||||||||||||
for more than 2 weeks | 8 | $0 | 2 | 16 | 7 | 112 | 6 | 11 | $7,322 | $0 | 14 | g | |||||||
9) Semiannual Deviation Report | 24 | $0 | 2 | 48 | 7 | 336 | 17 | 34 | $21,967 | $0 | 14 | h | |||||||
ReportingSubtotal | 14,988 | 749 | 1,499 | $979,886 | $3,411,488 | 179 | |||||||||||||
4. Recordkeeping Requirements | |||||||||||||||||||
A. Read Instructions | Incl. in 3.A | ||||||||||||||||||
B. Plan Activities | N/A | ||||||||||||||||||
C. Implement Activities | N/A | ||||||||||||||||||
D. Develop Record System | N/A | ||||||||||||||||||
E. Record Information | |||||||||||||||||||
1) Records of operating parameters | 2 | $0 | 52 | 104 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||||||
2) Records of exceedances of the operating parameters | 2 | $0 | 1 | 2 | 7 | 14 | 1 | 1 | $915 | $0 | 0 | g | |||||||
3) Records of stack tests | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
4) Records of persons who have reviewed operating procedures | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
5) Records of persons who have completed operator training | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
6) Records of persons who meet operator qualification criteria | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
7) Records of monitoring device calibration | 2 | $0 | 1 | 2 | 69 | 138 | 7 | 14 | $9,022 | $0 | 0 | ||||||||
8) Records of site-specific documentation | 24 | $0 | 1 | 24 | 69 | 1,656 | 83 | 166 | $108,266 | $0 | 0 | ||||||||
F. Personnel Training | Incl. in 3.B | ||||||||||||||||||
G. Time for Audits | N/A | ||||||||||||||||||
Recordkeeping Subtotal | 2360 | 118 | 236 | $154,292 | $0 | 0 | |||||||||||||
TOTAL: | 17,348 | 867 | 1,735 | $1,134,178 | $3,411,488 | 179 | |||||||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||||||
Summary of Respondent Burden | 19,950 | $1,134,178 | $3,411,488 | $4,545,666 | |||||||||||||||
Initial Capital and Startup | $0 | ||||||||||||||||||
Annualized Capital/Start-up and O & M | $3,411,488 | ||||||||||||||||||
FOOTNOTES | |||||||||||||||||||
a | One-time only costs. | ||||||||||||||||||
b | Cost incurred by a facility regardless of the number of affected units at the plant. | ||||||||||||||||||
c | Annual cost. Annual costs are not incurred until the second year of operation. | ||||||||||||||||||
d | Based on the sum of the total capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
e | Based on the sum of the annualized capital costs for each monitoring system required for incinerators. | ||||||||||||||||||
f | Assumed that none of the facilities will petition for site-specific parameters. | ||||||||||||||||||
g | Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. | ||||||||||||||||||
h | Assumed that 10 percent of the facilities would have an exceedance during the year. | ||||||||||||||||||
i | Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. | ||||||||||||||||||
j | Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. |
Table 2.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Multiple Hearth | |||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor (Annualized Capital/Startup and O&M) Costs | Total Costs | ||
1 | 34,982 | 1,749 | 3,498 | 40,229 | $2,287,055 | $8,953,460 | $11,240,515 | ||
2 | 17,348 | 867 | 1,735 | 19,950 | $1,134,178 | $3,411,488 | $4,545,666 | ||
3 | 17,348 | 867 | 1,735 | 19,950 | $1,134,178 | $3,411,488 | $4,545,666 | ||
Total | 69,678 | 3,484 | 6,968 | 80,130 | $4,555,412 | $15,776,436 | $20,331,848 | ||
Average | 23,226 | 1,161 | 2,323 | 26,710 | $1,518,471 | $5,258,812 | $6,777,283 | ||
Table 3 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - All Subcategories | ||||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Labor Hours | Labor Costs | Non-Labor (Annualized Capital/Startup and O&M) Costs | Total Costs | |||
1 | 51,868 | 2,593 | 5,187 | 59,648 | $3,391,029 | $12,701,960 | $16,092,989 | |||
2 | 25,392 | 1,270 | 2,539 | 29,201 | $1,660,079 | $4,732,368 | $6,392,447 | |||
3 | 25,392 | 1,270 | 2,539 | 29,201 | $1,660,079 | $4,732,368 | $6,392,447 | |||
Total | 102,652 | 5,133 | 10,265 | 118,050 | $6,711,187 | $22,166,696 | $28,877,883 | |||
Average | 34,217 | 1,711 | 3,422 | 39,350 | $2,237,062 | $7,388,899 | $9,625,961 | |||
Table 4 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 1 |
|||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 60 | a | 40 | 2400 | 120 | 240 | $124,374 | |||
3. | Required Activities | ||||||||||
A. | Observe stack tests | 41 | b | 48 | 1958 | 98 | 196 | $101,489 | |||
B. | Excess emissions -- Enforcement Activities | 12 | 24 | 288 | 14 | 29 | $14,925 | ||||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review initial notifications | 204 | 20 | 4080 | 204 | 408 | $211,435 | ||||
2) | Review initial compliance report | 204 | 40 | 8160 | 408 | 816 | $422,871 | ||||
3) | Review annual compliance report | 0 | 8 | 0 | 0 | 0 | $0 | ||||
4) | Review semi-annual excess emission and parameter exceedance report | 24 | 16 | 384 | 19 | 38 | $19,900 | ||||
5) | Review status reports and corrective action summary for operators off-site | 24 | 4 | 96 | 5 | 10 | $4,975 | ||||
F. | Prepare annual summary report | 1 | c | 200 | 200 | 10 | 20 | $10,364 | |||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $881 | per trip | $35,955 | |||||||
TOTAL | 17566 | 878 | 1757 | $946,288 | |||||||
FOOTNOTES | |||||||||||
a | Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents). | ||||||||||
b | Assumes EPA personnel attend 20 percent of the stack tests. | ||||||||||
c | Using four hours per state to write annual summary report. |
Table 5 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 2 |
|||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 0 | 40 | 0 | 0 | 0 | $0 | ||||
3. | Required Activities | ||||||||||
A. | Observe stack tests | 41 | b | 48 | 1958 | 98 | 196 | $101,489 | |||
B. | Excess emissions -- Enforcement Activities | 12 | 24 | 288 | 14 | 29 | $14,925 | ||||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review initial notifications | 0 | 20 | 0 | 0 | 0 | $0 | ||||
2) | Review initial compliance report | 0 | 40 | 0 | 0 | 0 | $0 | ||||
3) | Review annual compliance report | 204 | 8 | 1632 | 82 | 163 | $84,574 | ||||
4) | Review semi-annual excess emission and parameter exceedance report | 24 | 16 | 384 | 19 | 38 | $19,900 | ||||
5) | Review status reports and corrective action summary for operators off-site | 24 | 4 | 96 | 5 | 10 | $4,975 | ||||
F. | Prepare annual summary report | 1 | c | 200 | 200 | 10 | 20 | $10,364 | |||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $881 | per trip | $35,955 | |||||||
TOTAL | 4558 | 228 | 456 | $272,182 | |||||||
FOOTNOTES | |||||||||||
a | Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents). | ||||||||||
b | Assumes EPA personnel attend 20 percent of the stack tests. | ||||||||||
c | Using four hours per state to write annual summary report. |
Table 6 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 3 |
|||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | ||||||
Burden Item | Number of Occurrences Per Year | EPA Hours Per Occurrence | Tech Hours Per Year (C=AxB) | Management Hours Per Year (D=Cx0.05) | Clerical Hours Per Year (E=Cx0.1) | EPA Cost Per Year | |||||
1. | Applications | not applicable | |||||||||
2. | Read and Understand Rule Requirements | 0 | a | 40 | 0 | 0 | 0 | $0 | |||
3. | Required Activities | ||||||||||
A. | Observe stack tests | 41 | b | 48 | 1958 | 98 | 196 | $101,489 | |||
B. | Excess emissions -- Enforcement Activities | 12 | 24 | 288 | 14 | 29 | $14,925 | ||||
C. | Create Information | not applicable | |||||||||
D. | Gather Information | not applicable | |||||||||
E. | Report Reviews | ||||||||||
1) | Review initial notifications | 0 | 20 | 0 | 0 | 0 | $0 | ||||
2) | Review initial compliance report | 0 | 40 | 0 | 0 | 0 | $0 | ||||
3) | Review annual compliance report | 204 | 8 | 1632 | 82 | 163 | $84,574 | ||||
4) | Review semi-annual excess emission and parameter exceedance report | 24 | 16 | 384 | 19 | 38 | $19,900 | ||||
5) | Review status reports and corrective action summary for operators off-site | 24 | 4 | 96 | 5 | 10 | $4,975 | ||||
F. | Prepare annual summary report | 1 | c | 200 | 200 | 10 | 20 | $10,364 | |||
5. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $881 | per trip | $35,955 | |||||||
TOTAL | 4558 | 228 | 456 | $272,182 | |||||||
FOOTNOTES | |||||||||||
a | Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents). | ||||||||||
b | Assumes EPA personnel attend 20 percent of the stack tests. | ||||||||||
c | Using four hours per state to write annual summary report. |
Table 7 - Summary of Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM | |||||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor Costs | Total Costs | ||
1 | 17,566 | 878 | 1,757 | 20,201 | $946,288 | $0 | $946,288 | ||
2 | 4,558 | 228 | 456 | 5,242 | $272,182 | $0 | $272,182 | ||
3 | 4,558 | 228 | 456 | 5,242 | $272,182 | $0 | $272,182 | ||
Total | 26,683 | 1,334 | 2,668 | 30,686 | $1,490,652 | $0 | $1,490,652 | ||
Average | 8,894 | 445 | 889 | 10,229 | $496,884 | $0 | $496,884 | ||
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |