SSI EG Burden Estimate Tables promulgation

SSI EG Burden Estimate Tables promulgation.xlsx

EG for Sewage Sludge Incinerators (40 CFR part 60, subpart MMMM) (Final Rule)

SSI EG Burden Estimate Tables promulgation

OMB: 2060-0661

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1.A
Table 1.B
Table 1.C
Table 1.D (FB Summary)
Table 2.A
Table 2.B
Table 2.C
Table 2.D (MH Summary)
Table 3 (Summary)
Table 4
Table 5
Table 6
Table 7 (Summary)


Sheet 1: Table 1.A

Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 1, Fluidized Bed




(A)
(B) (C) (D) (E) (F) (G)


Footnotes




Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total




Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses




Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year




(Technical Occurrence Respondent Per Year




Per Year
Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)


1. Applications

N/A










2. Surveys and Studies

N/A










3. Reporting Requirements














A. Read and Understand Rule Requirements
40 $100 1 40 41 1,640 82 164 $107,220 $4,100 0 a,b,i,j

B. Required Activities














1) Initial stack test and report
40 $61,740 1 40 60 2,400 120 240 $156,907 $3,704,400 0 a


2) Annual stack test and test report
40 $21,348 1 40 0 0 0 0 $0 $0 0 c,k


3) Operator training and qualification















a) Establish and teach operator qualification course 64 $0 1 64 41 2,624 131 262 $171,552 $0 0 a,b,j



b) Obtain operator qualification 72 $0 1 72 41 2,952 148 295 $192,996 $0 0 a,b,j



c) Annual refresher course 12 $0 1 12 0 0 0 0 $0 $0 0 c



d) Initial review of site-specific information Incl. in a.









e) Annual review of site-specific information 8 $0 1 8 0 0 0 0 $0 $0 0 c


4) Establish operating parameters (maximum and minimum)
40 $0 1 40 60 2,400 120 240 $156,907 $0 0 a


5) Continuous parameter monitoring (including CEMS)















a) Initial capital costs 0 $2,773 1 0 60 0 0 0 $0 $166,400 0 a,d



b) Annualized capital and O&M costs 11 $667 1 11 60 660 33 66 $43,150 $40,000 0 c,e

C. Create Information
Incl. in 3.B











D. Gather Information
Incl. in 3.E











E. Report Preparation














1) Notification of initial performance test
2 $0 1 2 60 120 6 12 $7,845 $0 60


2) Notification of initial CMS Demonstration
2 $0 1 2 60 120 6 12 $7,845 $0 60 b,j


3) Final Control Plan
20 $0 1 20 60 1,200 60 120 $78,454 $0 60


4) Initial Compliance Report
40 $0 1 40 60 2,400 120 240 $156,907 $0 60


5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f


6) Annual Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0


7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 5 40 2 4 $2,615 $0 5 g


8) Corrective action summary for operators that are off-site















for more than 2 weeks 8 $0 2 16 5 80 4 8 $5,230 $0 10 g


9) Semiannual Deviation Report
24 $0 2 48 5 240 12 24 $15,691 $0 10 h
ReportingSubtotal







16,876 844 1,688 $1,103,320 $3,748,500 265
4. Recordkeeping Requirements






A. Read Instructions

Incl. in 3.A




B. Plan Activities

N/A


C. Implement Activities

N/A











D. Develop Record System

N/A











E. Record Information















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0


2) Records of exceedances of the operating parameters
2 $0 1 2 5 10 1 1 $654 $0 0 g


3) Records of stack tests
2 $0 1 2 0 0 0 0 $0 $0 0


4) Records of persons who have reviewed operating procedures
2 $0 1 2 0 0 0 0 $0 $0 0


5) Records of persons who have completed operator training
2 $0 1 2 0 0 0 0 $0 $0 0


6) Records of persons who meet operator qualification criteria
2 $0 1 2 0 0 0 0 $0 $0 0


7) Records of monitoring device calibration
2 $0 1 2 0 0 0 0 $0 $0 0


8) Records of site-specific documentation
24 $0 1 24 0 0 0 0 $0 $0 0

F. Personnel Training

Incl. in 3.B









G. Time for Audits

N/A










Recordkeeping Subtotal







10 0.5 1 $654 $0 0
TOTAL:







16,886 844 1,689 $1,103,974 $3,748,500 265










Total Hours Labor Non-Labor Total








Summary of Respondent Burden

19,419 $1,103,974 $3,748,500 $4,852,474








Initial Capital and Startup


$170,500









Annualized Capital/Start-up and O & M $3,748,500


















FOOTNOTES














a One-time only costs.













b Cost incurred by a facility regardless of the number of affected units at the plant.













c Annual cost. Annual costs are not incurred until the second year of operation.













d Based on the sum of the total capital costs for each monitoring system required for incinerators.













e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.













f Assumed that none of the facilities will petition for site-specific parameters.













g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.













h Assumed that 10 percent of the facilities would have an exceedance during the year.













i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.













j 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both














unit types are incorporated into the MH tables.













k Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.














Sheet 2: Table 1.B

Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines

for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 2, Fluidized Bed





(A)
(B) (C) (D) (E) (F) (G)


Footnotes





Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total





Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses





Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year





(Technical Occurrence Respondent Per Year




Per Year


Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)




1. Applications

N/A












2. Surveys and Studies

N/A












3. Reporting Requirements
















A. Read and Understand Rule Requirements
40 $0 1 40 0 0 0 0 $0 $0 0 a,b,i


B. Required Activities
















1) Initial stack test and report
40 $61,740 1 40 0 0 0 0 $0 $0 0 a



2) Annual stack test and test report
40 $21,348 1 40 60 2,400 120 240 $156,907 $1,280,880 0 c,k



3) Operator training and qualification

















a) Establish and teach operator qualification course 64 $0 1 64 0 0 0 0 $0 $0 0 a,b




b) Obtain operator qualification 72 $0 1 72 0 0 0 0 $0 $0 0 a,b




c) Annual refresher course 12 $0 1 12 41 492 25 49 $32,166 $0 0 c,j




d) Initial review of site-specific information Incl. in a.











e) Annual review of site-specific information 8 $0 1 8 41 328 16 33 $21,444 $0 0 c,j



4) Establish operating parameters (maximum and minimum)
40 $0 1 40 0 0 0 0 $0 $0 0 a



5) Continuous parameter monitoring (including CEMS)

















a) Initial capital costs 0 $0 1 0 0 0 0 0 $0 $0 0 a,d




b) Annualized capital and O&M costs 11 $667 1 11 60 660 33 66 $43,150 $40,000 0 c,e


C. Create Information
Incl. in 3.B













D. Gather Information
Incl. in 3.E













E. Report Preparation
















1) Notification of initial performance test
2 $0 1 2 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 $0 1 2 0 0 0 0 $0 $0 0 b,j



3) Final Control Plan
20 $0 1 20 0 0 0 0 $0 $0 0




4) Initial Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0




5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f



6) Annual Compliance Report
40 $0 1 40 60 2,400 120 240 $156,907 $0 60



7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 5 40 2 4 $2,615 $0 5 g



8) Corrective action summary for operators that are off-site

















for more than 2 weeks 8 $0 2 16 5 80 4 8 $5,230 $0 10 g



9) Semiannual Deviation Report
24 $0 2 48 5 240 12 24 $15,691 $0 10 h

ReportingSubtotal







6,640 332 664 $434,110 $1,320,880 85


4. Recordkeeping Requirements









A. Read Instructions

Incl. in 3.A





B. Plan Activities

N/A




C. Implement Activities

N/A













D. Develop Record System

N/A













E. Record Information

















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0




2) Records of exceedances of the operating parameters
2 $0 1 2 5 10 1 1 $654 $0 0 g



3) Records of stack tests
2 $0 1 2 41 82 4 8 $5,361 $0 0




4) Records of persons who have reviewed operating procedures
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



5) Records of persons who have completed operator training
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



6) Records of persons who meet operator qualification criteria
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



7) Records of monitoring device calibration
2 $0 1 2 41 82 4 8 $5,361 $0 0




8) Records of site-specific documentation
24 $0 1 24 41 984 49 98 $64,332 $0 0 j


F. Personnel Training

Incl. in 3.B











G. Time for Audits

N/A












Recordkeeping Subtotal







1404 70.2 140.4 $91,791 $0 0


TOTAL:







8,044 402 804 $525,901 $1,320,880 85












Total Hours Labor Non-Labor Total










Summary of Respondent Burden

9,251 $525,901 $1,320,880 $1,846,781










Initial Capital and Startup


$0











Annualized Capital/Start-up and O & M $1,320,880






















FOOTNOTES
















a One-time only costs.















b Cost incurred by a facility regardless of the number of affected units at the plant.















c Annual cost. Annual costs are not incurred until the second year of operation.















d Based on the sum of the total capital costs for each monitoring system required for incinerators.















e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.















f Assumed that none of the facilities will petition for site-specific parameters.















g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.















h Assumed that 10 percent of the facilities would have an exceedance during the year.















i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.















j 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both
















unit types are incorporated into the MH tables.















k Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.
















Sheet 3: Table 1.C

Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines

for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 3, Fluidized Bed





(A)
(B) (C) (D) (E) (F) (G)


Footnotes





Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total





Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses





Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year





(Technical Occurrence Respondent Per Year




Per Year


Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)




1. Applications

N/A












2. Surveys and Studies

N/A












3. Reporting Requirements
















A. Read and Understand Rule Requirements
40 $0 1 40 0 0 0 0 $0 $0 0 a,b,i


B. Required Activities
















1) Initial stack test and report
40 $61,740 1 40 0 0 0 0 $0 $0 0 a



2) Annual stack test and test report
40 $21,348 1 40 60 2,400 120 240 $156,907 $1,280,880 0 c,k



3) Operator training and qualification

















a) Establish and teach operator qualification course 64 $0 1 64 0 0 0 0 $0 $0 0 a,b




b) Obtain operator qualification 72 $0 1 72 0 0 0 0 $0 $0 0 a,b




c) Annual refresher course 12 $0 1 12 41 492 25 49 $32,166 $0 0 c,j




d) Initial review of site-specific information Incl. in a.











e) Annual review of site-specific information 8 $0 1 8 41 328 16 33 $21,444 $0 0 c,j



4) Establish operating parameters (maximum and minimum)
40 $0 1 40 0 0 0 0 $0 $0 0 a



5) Continuous parameter monitoring (including CEMS)

















a) Initial capital costs 0 $0 1 0 0 0 0 0 $0 $0 0 a,d




b) Annualized capital and O&M costs 11 $667 1 11 60 660 33 66 $43,150 $40,000 0 c,e


C. Create Information
Incl. in 3.B













D. Gather Information
Incl. in 3.E













E. Report Preparation
















1) Notification of initial performance test
2 $0 1 2 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 $0 1 2 0 0 0 0 $0 $0 0 b,j



3) Final Control Plan
20 $0 1 20 0 0 0 0 $0 $0 0




4) Initial Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0




5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f



6) Annual Compliance Report
40 $0 1 40 60 2,400 120 240 $156,907 $0 60



7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 5 40 2 4 $2,615 $0 5 g



8) Corrective action summary for operators that are off-site

















for more than 2 weeks 8 $0 2 16 5 80 4 8 $5,230 $0 10 g



9) Semiannual Deviation Report
24 $0 2 48 5 240 12 24 $15,691 $0 10 h

ReportingSubtotal







6,640 332 664 $434,110 $1,320,880 85 0

4. Recordkeeping Requirements









A. Read Instructions

Incl. in 3.A





B. Plan Activities

N/A




C. Implement Activities

N/A













D. Develop Record System

N/A













E. Record Information

















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0




2) Records of exceedances of the operating parameters
2 $0 1 2 5 10 1 1 $654 $0 0 g



3) Records of stack tests
2 $0 1 2 41 82 4 8 $5,361 $0 0




4) Records of persons who have reviewed operating procedures
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



5) Records of persons who have completed operator training
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



6) Records of persons who meet operator qualification criteria
2 $0 1 2 41 82 4 8 $5,361 $0 0 j



7) Records of monitoring device calibration
2 $0 1 2 41 82 4 8 $5,361 $0 0




8) Records of site-specific documentation
24 $0 1 24 41 984 49 98 $64,332 $0 0 j


F. Personnel Training

Incl. in 3.B











G. Time for Audits

N/A












Recordkeeping Subtotal







1404 70.2 140.4 $91,791 $0 0


TOTAL:







8,044 402 804 $525,901 $1,320,880 85












Total Hours Labor Non-Labor Total










Summary of Respondent Burden

9,251 $525,901 $1,320,880 $1,846,781










Initial Capital and Startup


$0











Annualized Capital/Start-up and O & M $1,320,880






















FOOTNOTES
















a One-time only costs.















b Cost incurred by a facility regardless of the number of affected units at the plant.















c Annual cost. Annual costs are not incurred until the second year of operation.















d Based on the sum of the total capital costs for each monitoring system required for incinerators.















e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.















f Assumed that none of the facilities will petition for site-specific parameters.















g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.















h Assumed that 10 percent of the facilities would have an exceedance during the year.















i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.















j 32 facilities have FB units; however one of these facilities also has a MH unit. Facility-specific costs are included for only 31 units here and the facility-specific costs for the facility have both
















unit types are incorporated into the MH tables.















k Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.
















Sheet 4: Table 1.D (FB Summary)

Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Fluidized Bed
Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor (Annualized Capital/Startup and O&M) Costs Total Costs
1 16,886 844 1,689 19,419 $1,103,974 $3,748,500 $4,852,474
2 8,044 402 804 9,251 $525,901 $1,320,880 $1,846,781
3 8,044 402 804 9,251 $525,901 $1,320,880 $1,846,781
Total 32,974 1,649 3,297 37,920 $2,155,776 $6,390,260 $8,546,036
Average 10,991 550 1,099 12,640 $718,592 $2,130,087 $2,848,679

Sheet 5: Table 2.A

Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines
for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 1, Multiple Hearth




(A)
(B) (C) (D) (E) (F) (G)


Footnotes




Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total




Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses




Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year




(Technical Occurrence Respondent Per Year




Per Year
Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)


1. Applications

N/A










2. Surveys and Studies

N/A










3. Reporting Requirements














A. Read and Understand Rule Requirements
40 $100 1 40 69 2,760 138 276 $180,443 $6,900 0 a,b,i

B. Required Activities














1) Initial stack test and report
40 $61,740 1 40 144 5,760 288 576 $376,578 $8,890,560 0 a


2) Annual stack test and test report
40 $23,302 1 40 0 0 0 0 $0 $0 0 c,j


3) Operator training and qualification















a) Establish and teach operator qualification course 64 $0 1 64 69 4,416 221 442 $288,709 $0 0 a,b



b) Obtain operator qualification 72 $0 1 72 69 4,968 248 497 $324,798 $0 0 a,b



c) Annual refresher course 12 $0 1 12 0 0 0 0 $0 $0 0 c



d) Initial review of site-specific information Incl. in a.









e) Annual review of site-specific information 8 $0 1 8 0 0 0 0 $0 $0 0 c


4) Establish operating parameters (maximum and minimum)
40 $0 1 40 144 5,760 288 576 $376,578 $0 0 a


5) Continuous parameter monitoring (including CEMS)















a) Initial capital costs 0 $1,688 1 0 144 0 0 0 $0 $243,000 0 a,d



b) Annualized capital and O&M costs 11 $389 1 11 144 1,584 79 158 $103,559 $56,000 0 c,e

C. Create Information
Incl. in 3.B











D. Gather Information
Incl. in 3.E











E. Report Preparation














1) Notification of initial performance test
2 $0 1 2 144 288 14 29 $18,829 $0 144


2) Notification of initial CMS Demonstration
2 $0 1 2 144 288 14 29 $18,829 $0 144 b,j


3) Final Control Plan
20 $0 1 20 144 2,880 144 288 $188,289 $0 144


4) Initial Compliance Report
40 $0 1 40 144 5,760 288 576 $376,578 $0 144


5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f


6) Annual Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0


7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 7 56 3 6 $3,661 $0 7 g


8) Corrective action summary for operators that are off-site















for more than 2 weeks 8 $0 2 16 7 112 6 11 $7,322 $0 14 g


9) Semiannual Deviation Report
24 $0 2 48 7 336 17 34 $21,967 $0 14 h
ReportingSubtotal







34,968 1,748 3,497 $2,286,140 $8,953,460 611
4. Recordkeeping Requirements






A. Read Instructions

Incl. in 3.A



B. Plan Activities

N/A


C. Implement Activities

N/A











D. Develop Record System

N/A











E. Record Information















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0


2) Records of exceedances of the operating parameters
2 $0 1 2 7 14 1 1 $915 $0 0 g


3) Records of stack tests
2 $0 1 2 0 0 0 0 $0 $0 0


4) Records of persons who have reviewed operating procedures
2 $0 1 2 0 0 0 0 $0 $0 0


5) Records of persons who have completed operator training
2 $0 1 2 0 0 0 0 $0 $0 0


6) Records of persons who meet operator qualification criteria
2 $0 1 2 0 0 0 0 $0 $0 0


7) Records of monitoring device calibration
2 $0 1 2 0 0 0 0 $0 $0 0


8) Records of site-specific documentation
24 $0 1 24 0 0 0 0 $0 $0 0

F. Personnel Training

Incl. in 3.B









G. Time for Audits

N/A










Recordkeeping Subtotal







14 0.7 1.4 $915 $0 0
TOTAL:







34,982 1,749 3,498 $2,287,055 $8,953,460 611










Total Hours Labor Non-Labor Total








Summary of Respondent Burden

40,229 $2,287,055 $8,953,460 $11,240,515








Initial Capital and Startup


$249,900









Annualized Capital/Start-up and O & M

$8,953,460


















FOOTNOTES














a One-time only costs.













b Cost incurred by a facility regardless of the number of affected units at the plant.













c Annual cost. Annual costs are not incurred until the second year of operation.













d Based on the sum of the total capital costs for each monitoring system required for incinerators.













e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.













f Assumed that none of the facilities will petition for site-specific parameters.













g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.













h Assumed that 10 percent of the facilities would have an exceedance during the year.













i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.













j Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.














Sheet 6: Table 2.B

Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines

for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 2, Multiple Hearth





(A)
(B) (C) (D) (E) (F) (G)


Footnotes





Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total





Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses





Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year





(Technical Occurrence Respondent Per Year




Per Year


Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)




1. Applications

N/A












2. Surveys and Studies

N/A












3. Reporting Requirements
















A. Read and Understand Rule Requirements
40 $0 1 40 0 0 0 0 $0 $0 0 a,b,i


B. Required Activities
















1) Initial stack test and report
40 $61,740 1 40 0 0 0 0 $0 $0 0 a



2) Annual stack test and test report
40 $23,302 1 40 144 5,760 288 576 $376,578 $3,355,488 0 c,j



3) Operator training and qualification

















a) Establish and teach operator qualification course 64 $0 1 64 0 0 0 0 $0 $0 0 a,b




b) Obtain operator qualification 72 $0 1 72 0 0 0 0 $0 $0 0 a,b




c) Annual refresher course 12 $0 1 12 69 828 41 83 $54,133 $0 0 c




d) Initial review of site-specific information Incl. in a.











e) Annual review of site-specific information 8 $0 1 8 69 552 28 55 $36,089 $0 0 c



4) Establish operating parameters (maximum and minimum)
40 $0 1 40 0 0 0 0 $0 $0 0 a



5) Continuous parameter monitoring (including CEMS)

















a) Initial capital costs 0 $0 1 0 0 0 0 0 $0 $0 0 a,d




b) Annualized capital and O&M costs 11 $389 1 11 144 1,584 79 158 $103,559 $56,000 0 c,e


C. Create Information
Incl. in 3.B













D. Gather Information
Incl. in 3.E













E. Report Preparation
















1) Notification of initial performance test
2 $0 1 2 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 $0 1 2 0 0 0 0 $0 $0 0 b,j



3) Final Control Plan
20 $0 1 20 0 0 0 0 $0 $0 0




4) Initial Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0




5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f



6) Annual Compliance Report
40 $0 1 40 144 5,760 288 576 $376,578 $0 144



7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 7 56 3 6 $3,661 $0 7 g



8) Corrective action summary for operators that are off-site

















for more than 2 weeks 8 $0 2 16 7 112 6 11 $7,322 $0 14 g



9) Semiannual Deviation Report
24 $0 2 48 7 336 17 34 $21,967 $0 14 h

ReportingSubtotal







14,988 749 1,499 $979,886 $3,411,488 179


4. Recordkeeping Requirements









A. Read Instructions

Incl. in 3.A





B. Plan Activities

N/A




C. Implement Activities

N/A













D. Develop Record System

N/A













E. Record Information

















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0




2) Records of exceedances of the operating parameters
2 $0 1 2 7 14 1 1 $915 $0 0 g



3) Records of stack tests
2 $0 1 2 69 138 7 14 $9,022 $0 0




4) Records of persons who have reviewed operating procedures
2 $0 1 2 69 138 7 14 $9,022 $0 0




5) Records of persons who have completed operator training
2 $0 1 2 69 138 7 14 $9,022 $0 0




6) Records of persons who meet operator qualification criteria
2 $0 1 2 69 138 7 14 $9,022 $0 0




7) Records of monitoring device calibration
2 $0 1 2 69 138 7 14 $9,022 $0 0




8) Records of site-specific documentation
24 $0 1 24 69 1,656 83 166 $108,266 $0 0



F. Personnel Training

Incl. in 3.B











G. Time for Audits

N/A












Recordkeeping Subtotal







2360 118 236 $154,292 $0 0


TOTAL:







17,348 867 1,735 $1,134,178 $3,411,488 179












Total Hours Labor Non-Labor Total










Summary of Respondent Burden

19,950 $1,134,178 $3,411,488 $4,545,666










Initial Capital and Startup


$0











Annualized Capital/Start-up and O & M

$3,411,488






















FOOTNOTES
















a One-time only costs.















b Cost incurred by a facility regardless of the number of affected units at the plant.















c Annual cost. Annual costs are not incurred until the second year of operation.















d Based on the sum of the total capital costs for each monitoring system required for incinerators.















e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.















f Assumed that none of the facilities will petition for site-specific parameters.















g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.















h Assumed that 10 percent of the facilities would have an exceedance during the year.















i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.















j Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.
















Sheet 7: Table 2.C

Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines

for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Year 3, Multiple Hearth





(A)
(B) (C) (D) (E) (F) (G)


Footnotes





Respondent Non-Labor Number of Hours Number of Technical Management Clerical Total Total Total





Hours per Costs Occurrences Per Respondents Hours Hours Hours Labor Costs Non-Labor Responses





Occurrence Per Per Respondent Per Year Per Year Per Year Per Year Per Year Costs Per Year





(Technical Occurrence Respondent Per Year




Per Year


Burden Item hours)
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1)




1. Applications

N/A












2. Surveys and Studies

N/A












3. Reporting Requirements
















A. Read and Understand Rule Requirements
40 $0 1 40 0 0 0 0 $0 $0 0 a,b,i


B. Required Activities
















1) Initial stack test and report
40 $61,740 1 40 0 0 0 0 $0 $0 0 a



2) Annual stack test and test report
40 $23,302 1 40 144 5,760 288 576 $376,578 $3,355,488 0 c,j



3) Operator training and qualification

















a) Establish and teach operator qualification course 64 $0 1 64 0 0 0 0 $0 $0 0 a,b




b) Obtain operator qualification 72 $0 1 72 0 0 0 0 $0 $0 0 a,b




c) Annual refresher course 12 $0 1 12 69 828 41 83 $54,133 $0 0 c




d) Initial review of site-specific information Incl. in a.











e) Annual review of site-specific information 8 $0 1 8 69 552 28 55 $36,089 $0 0 c



4) Establish operating parameters (maximum and minimum)
40 $0 1 40 0 0 0 0 $0 $0 0 a



5) Continuous parameter monitoring (including CEMS)

















a) Initial capital costs 0 $0 1 0 0 0 0 0 $0 $0 0 a,d




b) Annualized capital and O&M costs 11 $389 1 11 144 1,584 79 158 $103,559 $56,000 0 c,e


C. Create Information
Incl. in 3.B













D. Gather Information
Incl. in 3.E













E. Report Preparation
















1) Notification of initial performance test
2 $0 1 2 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 $0 1 2 0 0 0 0 $0 $0 0 b,j



3) Final Control Plan
20 $0 1 20 0 0 0 0 $0 $0 0




4) Initial Compliance Report
40 $0 1 40 0 0 0 0 $0 $0 0




5) Report for site-specific parameter petition
14 $0 1 14 0 0 0 0 $0 $0 0 a,f



6) Annual Compliance Report
40 $0 1 40 144 5,760 288 576 $376,578 $0 144



7) Status report for operators that are off-site for more than 2 weeks 8 $0 1 8 7 56 3 6 $3,661 $0 7 g



8) Corrective action summary for operators that are off-site

















for more than 2 weeks 8 $0 2 16 7 112 6 11 $7,322 $0 14 g



9) Semiannual Deviation Report
24 $0 2 48 7 336 17 34 $21,967 $0 14 h

ReportingSubtotal







14,988 749 1,499 $979,886 $3,411,488 179


4. Recordkeeping Requirements









A. Read Instructions

Incl. in 3.A





B. Plan Activities

N/A




C. Implement Activities

N/A













D. Develop Record System

N/A













E. Record Information

















1) Records of operating parameters
2 $0 52 104 0 0 0 0 $0 $0 0




2) Records of exceedances of the operating parameters
2 $0 1 2 7 14 1 1 $915 $0 0 g



3) Records of stack tests
2 $0 1 2 69 138 7 14 $9,022 $0 0




4) Records of persons who have reviewed operating procedures
2 $0 1 2 69 138 7 14 $9,022 $0 0




5) Records of persons who have completed operator training
2 $0 1 2 69 138 7 14 $9,022 $0 0




6) Records of persons who meet operator qualification criteria
2 $0 1 2 69 138 7 14 $9,022 $0 0




7) Records of monitoring device calibration
2 $0 1 2 69 138 7 14 $9,022 $0 0




8) Records of site-specific documentation
24 $0 1 24 69 1,656 83 166 $108,266 $0 0



F. Personnel Training

Incl. in 3.B











G. Time for Audits

N/A












Recordkeeping Subtotal







2360 118 236 $154,292 $0 0


TOTAL:







17,348 867 1,735 $1,134,178 $3,411,488 179












Total Hours Labor Non-Labor Total










Summary of Respondent Burden

19,950 $1,134,178 $3,411,488 $4,545,666










Initial Capital and Startup


$0











Annualized Capital/Start-up and O & M

$3,411,488






















FOOTNOTES
















a One-time only costs.















b Cost incurred by a facility regardless of the number of affected units at the plant.















c Annual cost. Annual costs are not incurred until the second year of operation.















d Based on the sum of the total capital costs for each monitoring system required for incinerators.















e Based on the sum of the annualized capital costs for each monitoring system required for incinerators.















f Assumed that none of the facilities will petition for site-specific parameters.















g Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.















h Assumed that 10 percent of the facilities would have an exceedance during the year.















i Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.















j Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements.
















Sheet 8: Table 2.D (MH Summary)

Table 2.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - Multiple Hearth

Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor (Annualized Capital/Startup and O&M) Costs Total Costs

1 34,982 1,749 3,498 40,229 $2,287,055 $8,953,460 $11,240,515

2 17,348 867 1,735 19,950 $1,134,178 $3,411,488 $4,545,666

3 17,348 867 1,735 19,950 $1,134,178 $3,411,488 $4,545,666

Total 69,678 3,484 6,968 80,130 $4,555,412 $15,776,436 $20,331,848

Average 23,226 1,161 2,323 26,710 $1,518,471 $5,258,812 $6,777,283
















































































































Sheet 9: Table 3 (Summary)

Table 3 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements of the Emissions Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM - All Subcategories


Year Technical Hours Management Hours Clerical Hours Total Labor Hours Labor Costs Non-Labor (Annualized Capital/Startup and O&M) Costs Total Costs


1 51,868 2,593 5,187 59,648 $3,391,029 $12,701,960 $16,092,989


2 25,392 1,270 2,539 29,201 $1,660,079 $4,732,368 $6,392,447


3 25,392 1,270 2,539 29,201 $1,660,079 $4,732,368 $6,392,447


Total 102,652 5,133 10,265 118,050 $6,711,187 $22,166,696 $28,877,883


Average 34,217 1,711 3,422 39,350 $2,237,062 $7,388,899 $9,625,961
























































































































































































































































































































































Sheet 10: Table 4

Table 4 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units -
Subpart MMMM - Year 1





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year
1. Applications


not applicable
2. Read and Understand Rule Requirements


60 a 40 2400 120 240 $124,374
3. Required Activities










A. Observe stack tests 41 b 48 1958 98 196 $101,489

B. Excess emissions -- Enforcement Activities

12
24 288 14 29 $14,925

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review initial notifications
204
20 4080 204 408 $211,435


2) Review initial compliance report
204
40 8160 408 816 $422,871


3) Review annual compliance report
0
8 0 0 0 $0


4) Review semi-annual excess emission and parameter exceedance report 24
16 384 19 38 $19,900


5) Review status reports and corrective action summary for operators off-site 24
4 96 5 10 $4,975

F. Prepare annual summary report

1 c 200 200 10 20 $10,364
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =






$881 per trip $35,955

TOTAL





17566 878 1757 $946,288












FOOTNOTES










a Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents).
b Assumes EPA personnel attend 20 percent of the stack tests.









c Using four hours per state to write annual summary report.










Sheet 11: Table 5

Table 5 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units -
Subpart MMMM - Year 2





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year
1. Applications


not applicable
2. Read and Understand Rule Requirements


0
40 0 0 0 $0
3. Required Activities










A. Observe stack tests 41 b 48 1958 98 196 $101,489

B. Excess emissions -- Enforcement Activities

12
24 288 14 29 $14,925

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review initial notifications
0
20 0 0 0 $0


2) Review initial compliance report
0
40 0 0 0 $0


3) Review annual compliance report
204
8 1632 82 163 $84,574


4) Review semi-annual excess emission and parameter exceedance report 24
16 384 19 38 $19,900


5) Review status reports and corrective action summary for operators off-site 24
4 96 5 10 $4,975

F. Prepare annual summary report

1 c 200 200 10 20 $10,364
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =






$881 per trip $35,955

TOTAL





4558 228 456 $272,182












FOOTNOTES










a Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents).








b Assumes EPA personnel attend 20 percent of the stack tests.









c Using four hours per state to write annual summary report.










Sheet 12: Table 6

Table 6 - Annual Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units -
Subpart MMMM - Year 3





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 a 40 0 0 0 $0
3. Required Activities










A. Observe stack tests 41 b 48 1958 98 196 $101,489

B. Excess emissions -- Enforcement Activities

12
24 288 14 29 $14,925

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review initial notifications
0
20 0 0 0 $0


2) Review initial compliance report
0
40 0 0 0 $0


3) Review annual compliance report
204
8 1632 82 163 $84,574


4) Review semi-annual excess emission and parameter exceedance report 24
16 384 19 38 $19,900


5) Review status reports and corrective action summary for operators off-site 24
4 96 5 10 $4,975

F. Prepare annual summary report

1 c 200 200 10 20 $10,364
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =






$881 per trip $35,955

TOTAL





4558 228 456 $272,182












FOOTNOTES










a Number of occurences is the number of states where affected sources will exist and each EPA Region (50 states + 10 EPA regions = 60 respondents).









b Assumes EPA personnel attend 20 percent of the stack tests.









c Using four hours per state to write annual summary report.










Sheet 13: Table 7 (Summary)

Table 7 - Summary of Designated Administrator Burden and Cost of Recordkeeping and Reporting Requirements of the Emission Guidelines for Existing Stationary Sources: Sewage Sludge Incineration Units - Subpart MMMM

Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor Costs Total Costs

1 17,566 878 1,757 20,201 $946,288 $0 $946,288

2 4,558 228 456 5,242 $272,182 $0 $272,182

3 4,558 228 456 5,242 $272,182 $0 $272,182

Total 26,683 1,334 2,668 30,686 $1,490,652 $0 $1,490,652

Average 8,894 445 889 10,229 $496,884 $0 $496,884





































































































File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy