QID 000610 Pear Processing Report - WA

Fruit, Nuts, and Specialty Crops

0039 - Pear Processing Report - WA 09

Fruit, Nuts, and Specialty Crops

OMB: 0535-0039

Document [doc]
Download: doc | pdf

Project 134 QID 000610

OMB No. 0535-0039: Approval Expires 01/31/2010

PEAR PROCESSING REPORT

2008 CROP

NATIONAL

AGRICULTURAL STATISTICS

SERVICE



Washington Field Office

P.O. Box 609

1111 Washington St SE

Olympia, WA 98504

Phone 800-435-5883, Fax 800-265-6275

[email protected]




This annual survey is used to estimate pear tonnage processed in Washington and prices received by growers. Please report the total quantity actually processed at this plant. If you have not completed processing of the 2008 crop, please provide the quantity processed to date. If you processed pears grown in other states, report the quantities separately for each state. Response to this survey is voluntary and not required by law. Individual reports are kept confidential.


Thank you for your cooperation.










PLEASE MAIL BY: June 29, 2009


THIS REPORT SHOULD INCLUDE PEARS PROCESSED ONLY IN YOUR WASHINGTON PLANT(S)

WASHINGTON GROWN PEARS - 2008 CROP

Processing

Utilization

BARTLETT PEARS

OTHER PEARS

Quantity

Used

-Tons-

Average Price

Per Ton 1/

-Dollars-

Quantity

Used

-Tons-

Average Price

Per Ton 1/

-Dollars-

Canned





Dried





Frozen





Juice or Concentrate





Other Uses (___________)





Culls Dumped





Total Received





1/ Please report price paid at processing plant door.


FRUIT GROWN IN OTHER STATES AND PROCESSED IN

YOUR WASHINGTON PLANT(S) – 2008 CROP

State

Where

Grown

USE

BARTLETT PEARS

OTHER PEARS

Quantity

Used

-Tons-

Average Price

Per Ton 1/

-Dollars-

Quantity

Used

-Tons-

Average Price

Per Ton 1/

-Dollars-

























1/ Please report price paid at processing plant door.


Report by:______________________________________Phone:__________________Date:___________



In order to avoid duplication, please report pears processed only in your Washington plants. If you had pears

custom processed by other processors, please indicate the firm and amount on the back side of this questionnaire.



According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0535-0039. The time required to complete this information collection is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information

2


File Typeapplication/msword
File TitleOMB No
AuthorQuentin C. Coleman
Last Modified ByDavid Hancock
File Modified2010-01-08
File Created2009-09-21

© 2024 OMB.report | Privacy Policy