According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a |
|
|
|
|
|
|
|
|
|
|
|
|
|
valid OMB control number. The valid OMB control number for this information collection is 0572-0025. The time required to complete this information collection is estimated to average |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the |
|
|
|
|
|
|
|
|
|
|
|
|
|
collection of information. |
|
|
|
|
|
|
|
|
|
|
|
|
|
UNITED STATES DEPARTMENT OF AGRICULTURE |
BORROWER DESIGNATION |
|
|
|
|
|
RURAL UTILITIES SERVICE |
|
|
|
|
|
|
|
|
|
REVIEW RATING SUMMARY |
DATE PREPARED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ratings on form are: |
|
|
0: Unsatisfactory -- No Records |
|
|
2: Acceptable, but Should be Improved -- See Attached Recommendations |
|
|
|
|
|
|
|
NA: Not Applicable |
|
|
1: Corrective Action Needed |
|
|
3: Satisfactory -- No Additional Action Required at this Time |
|
|
|
|
|
|
|
PART I. TRANSMISSION and DISTRIBUTION FACILITIES |
1. Substations (Transmission and Distribution) |
|
|
|
|
|
(Rating) |
4. Distribution - Underground Cable |
|
|
|
|
|
(Rating) |
a. Safety, Clearance, Code Compliance |
|
|
|
|
|
|
a. Grounding and Corrosion Control |
|
|
|
|
|
|
b. Physical Conditions: Structure, Major Equipment, Appearance |
|
|
|
|
|
|
b. Surface Grading, Appearance |
|
|
|
|
|
|
c. Inspection Records - Each Substation |
|
|
|
|
|
|
c. Riser Pole: Hazards, Guying, Condition |
|
|
|
|
|
|
d. Oil Spill Prevention |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Distribution Line Equipment: Conditions and Records |
|
|
|
|
|
|
2. Transmission Lines |
|
|
|
|
|
|
a. Voltage Regulators |
|
|
|
|
|
|
a. Right-of-Way: Clearing, Erosion, Appearance, Intrusions |
|
|
|
|
|
|
b. Sectionalizing Equipment |
|
|
|
|
|
|
b. Physical Condition: Structure, Conductor, Guying |
|
|
|
|
|
|
c. Distribution Transformers |
|
|
|
|
|
|
c. Inspection Program and Records |
|
|
|
|
|
|
d. Pad Mounted Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Safety: Locking, Dead Front, Barriers |
|
|
|
|
|
3. Distribution Lines - Overhead |
|
|
|
|
|
|
|
Appearance: Settlement, Condition |
|
|
|
|
|
a. Inspection Program and Records |
|
|
|
|
|
|
|
Other |
|
|
|
|
|
b. Compliance with Safety Codes: |
|
|
|
Clearances |
|
|
e. Kilowatt-hour and Demand Meter |
|
|
|
|
|
|
|
|
|
|
Foreign Structures |
|
|
Reading and Testing |
|
|
|
|
|
|
|
|
|
|
Attachments |
|
|
|
|
|
|
|
|
|
c. Observed Physical Condition from Field Checking: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Right-of-Way |
|
|
|
|
|
|
|
|
|
|
|
|
|
Other |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PART II. OPERATIONS and MAINTENANCE |
|
6. Line Maintenance and Work Order Procedures |
|
|
|
|
|
(Rating) |
8. Power Quality |
|
|
|
|
|
(Rating) |
a. Work Planning & Scheduling |
|
|
|
|
|
|
a. General Freedom from Complaints |
|
|
|
|
|
|
b. Work Backlogs: |
|
|
Right-of-Way Maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
Poles |
|
|
|
9. Loading and Load Balance |
|
|
|
|
|
|
|
|
|
Retirement of Idle Services |
|
|
|
a. Distribution Transformer Loading |
|
|
|
|
|
|
|
|
|
Other |
|
|
|
b. Load Control Apparatus |
|
|
|
|
|
|
7. Service Interruptions |
|
|
|
|
|
|
c. Substation and Feeder Loading |
|
|
|
|
|
|
a. Average Annual Minutes/Consumer by Cause (Complete for each of the previous 5 years) |
|
|
|
|
|
|
|
|
|
|
|
|
|
PREVIOUS |
POWER |
MAJOR |
PLANNED |
ALL |
TOTAL |
|
10. Maps and Plant Records |
|
|
|
|
|
|
5 YEARS |
SUPPLIER |
EVENT |
|
OTHER |
|
|
a. Operating Maps: Accurate and Up-to-Date |
|
|
|
|
|
|
(Year) |
a. |
b. |
c. |
d. |
e. |
(Rating) |
b. Circuit Diagrams |
|
|
|
|
|
|
|
|
|
|
|
0.00 |
|
c. Staking Sheets |
|
|
|
|
|
|
|
|
|
|
|
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0.00 |
|
|
|
|
|
|
|
|
b. Emergency Restoration Plan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PART III. ENGINEERING |
|
11. System Load Conditions and Losses |
|
|
|
|
|
(Rating) |
13. Load Studies and Planning |
|
|
|
|
|
(Rating) |
a. Annual System Losses |
|
|
|
% |
|
|
a. Long Range Engineering Plan |
|
|
|
|
|
|
b. Annual Load Factor |
|
|
|
% |
|
|
b. Construction Work Plan |
|
|
|
|
|
|
c. Power Factor at Monthly Peak |
|
|
|
% |
|
|
c. Sectionalizing Study |
|
|
|
|
|
|
d. Ratios of Individual Substation Annual Peak kW to kVA |
|
|
|
|
|
|
d. Load Data for Engineering Studies |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. Load Forecasting Data |
|
|
|
|
|
|
12. Voltage Conditions |
|
|
|
|
|
|
|
|
|
|
|
|
|
a. Voltage Surveys |
|
|
|
|
|
|
|
|
|
|
|
|
|
b. Substation Transformer Output Voltage Spread |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RUS Form 300 (Rev. 3-09) |
|
|
|
|
|
|
|
|
|
|
PAGE 1 OF 2 PAGES |
|
|
STATUS OF O&M ACTIVITIES |
ATTACHMENT TO RUS FORM 300 |
(OPTIONAL FORM - NOT REQUIRED) |
SYSTEM DESIGNATION |
|
Date Long Range System Engineering Plan Approved |
|
|
Date Annual Work Plan Approved |
|
Date of Last Load and Voltage Survey |
|
STATISTICS |
YEAR |
____ |
____ |
____ |
____ |
____ |
Miles of Distribution Line |
|
|
|
|
|
Miles of Transmission Line |
|
|
|
|
|
Number of Substations |
|
|
|
|
|
Sum of Substation Peak Demands (kW) |
|
|
|
|
|
Average Number of Consumers |
|
|
|
|
|
Plant Investment ($ x 1,000) |
|
|
|
|
|
Operation Expense ($ x 1,000) |
|
|
|
|
|
Maintenance Expense ($ x 1,000) |
|
|
|
|
|
ROW CLEARING |
Units on System |
|
|
|
|
|
Units Recleared |
|
|
|
|
|
Regrowth Cycle (Years) |
|
|
|
|
|
POLES |
Number on System |
|
|
|
|
|
Number Inspected |
|
|
|
|
|
Number Condemned |
|
|
|
|
|
Number Replaced |
|
|
|
|
|
OIL CIRCUIT RECLOSERS |
Number on System |
|
|
|
|
|
Number Serviced |
|
|
|
|
|
LINE REGULATORS |
Number on System |
|
|
|
|
|
Number Serviced |
|
|
|
|
|
METERS |
Number on System |
|
|
|
|
|
Number Serviced |
|
|
|
|
|
PATROL AND MAINTENANCE |
Miles of Distribution Patrolled |
|
|
|
|
|
Miles Distribution Maintained |
|
|
|
|
|
Miles of Transmission Patrolled |
|
|
|
|
|
Miles of Transmission Maintained |
|
|
|
|
|
Number of Substations Serviced |
|
|
|
|
|
AVERAGE MINUTES OUTAGE PER CONSUMER |
Power Supply |
|
|
|
|
|
Major Event |
|
|
|
|
|
All Other |
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RUS Form 300 Attachment (Rev. 3-09) |
|
|