NESHAP for Area Sources: Polyvinyl Chloride and Copolymer Production, Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals--Zinc, Cadmium, and Beryllium (Renewal)

ICR 201303-2060-003

OMB: 2060-0596

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2013-03-05
ICR Details
2060-0596 201303-2060-003
Historical Active 201001-2060-009
EPA/OAR 2240.04
NESHAP for Area Sources: Polyvinyl Chloride and Copolymer Production, Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals--Zinc, Cadmium, and Beryllium (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 04/15/2013
Retrieve Notice of Action (NOA) 03/13/2013
  Inventory as of this Action Requested Previously Approved
04/30/2016 36 Months From Approved 05/31/2013
4 0 4
46 0 46
0 0 0

This information collection request (ICR) covers the information collection requirements for area sources at primary copper smelting, secondary copper smelting, and primary zinc production (part of the primary nonferrous source category). Information collection requirements for polyvinyl chloride and primary beryllium production area source categories are included in other ICR previously approved by OMB. Potential respondents include three existing primary copper smelter and two existing primary zinc production facilities; there are no existing secondary copper smelters. The emissions control and compliance provisions for existing primary copper smelting and primary zinc production area sources are the same as the current Title V permit requirements. The owner or operator would also be required to submit initial notifications according to requirements in the General Provisions (40 CFR Part 63, Subpart A). The owner or operator of a new area source would be required to comply with all requirements of the Provisions. No burden estimates are provided for new primary copper smelters, secondary copper smelters, or primary zinc production area sources because no new facilities are expected during the next 3 years.

None
None

Not associated with rulemaking

  77 FR 63813 10/17/2012
78 FR 15947 03/13/2013
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 4 4 0 0 0 0
Annual Time Burden (Hours) 46 46 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$622
No
No
No
No
No
Uncollected
Learia Williams 202 564-4113 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/13/2013


© 2024 OMB.report | Privacy Policy