NSPS for Secondary Brass/Bronze Production, Primary Copper/Zinc/Lead Smelters, Primary Aluminum Reduction Plants and Ferroalloy Production Facilities (40 CFR part 60, subparts M,P,Q,R,S, Z) (Renewal)

ICR 201309-2060-011

OMB: 2060-0110

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2013-09-11
ICR Details
2060-0110 201309-2060-011
Historical Active 201007-2060-001
EPA/OAR 1604.10
NSPS for Secondary Brass/Bronze Production, Primary Copper/Zinc/Lead Smelters, Primary Aluminum Reduction Plants and Ferroalloy Production Facilities (40 CFR part 60, subparts M,P,Q,R,S, Z) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 11/14/2013
Retrieve Notice of Action (NOA) 09/19/2013
  Inventory as of this Action Requested Previously Approved
11/30/2016 36 Months From Approved 11/30/2013
83 0 49
4,961 0 4,923
127,100 0 131,600

The affected entities are subject to the General Provisions of the NSPS at 40 CFR part 60, subpart A and any changes, or additions to the Provisions specified at 40 CFR part 60, subparts M, P, Q, R, S and Z. Owners or operators of the affected facilities must make an initial notification, performance tests, periodic reports, and maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports are required semiannually at a minimum.

None
None

Not associated with rulemaking

  78 FR 33409 06/04/2013
78 FR 57630 09/19/2013
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 83 49 0 0 34 0
Annual Time Burden (Hours) 4,961 4,923 0 0 38 0
Annual Cost Burden (Dollars) 127,100 131,600 0 0 -4,500 0
No
No
There is an adjustment increase in the respondent burden from the most recently approved ICR. This increase is not due to any program changes. The increase is due to a correction in respondent burden activity associated with NSPS Subpart S. The previous ICR did not include the time required to prepare semiannual reports for the respondents. This correction results in an increase in respondent burden hours, costs, and the total number of responses. There is also an increase in the respondent labor costs due to an update in labor rates. Further, there is an overall decrease in O&M costs due to an update in the number of sources. In this ICR, we estimate that two ferroalloy facilities are subject to Subpart Z and one primary lead facility is subject to subpart R; however, the affected sintering unit and blast furnace at this primary lead facility will be shutdown and will no longer have burden associated with the standard.

$10,779
No
No
No
No
No
Uncollected
Learia Williams 202 564-4113 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/19/2013