The affected entities are subject to
the General Provisions of the NESHAP for Metal Can Manufacturing
Surface Coating at 40 CFR part 63, subpart A, and any changes, or
additions, to the Provisions specified at 40 CFR part 63, subpart
KKKK. Owners or operators of the affected facilities must submit a
one-time-only report of any physical or operational changes,
initial performance tests, and periodic reports and results. Owners
or operators are also required to maintain records of the
occurrence and duration of any startup, shutdown, or malfunction in
the operation of an affected facility, or any period during which
the monitoring system is inoperative. Reports are required
semiannually at a minimum.
There is a decrease in the
total estimated respondent burden and cost, as currently identified
in the OMB Inventory of Approved Burdens. These decreases are due
to fewer sources being subject to the standard, and are not due to
any program changes. Based on information from the Can
Manufacturers Institute, five existing sources currently are
subject to the standard. To account for industry consolidation that
has occurred since the most recent ICR was approved, we have
adjusted the number of subject sources to reflect the Institute's
estimate.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.