The affected entities are subject to the General Provisions of the NESHAP for Metal Can Manufacturing Surface Coating at 40 CFR part 63, subpart A, and any changes, or additions, to the Provisions specified at 40 CFR part 63, subpart KKKK. Owners or operators of the affected facilities must submit a one-time-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports are required semiannually at a minimum.
The latest form for NESHAP for Metal Can Manufacturing Surface Coating (40 CFR part 63, subpart KKKK) (Final Rule) expires 2021-01-31 and can be found here.
Document Name |
---|
Supplementary Document |
Supporting Statement A |
Revision of a currently approved collection | 2020-02-25 | ||
Comment filed on proposed rule and continue |
Revision of a currently approved collection | 2019-12-31 | |
Approved without change |
Extension without change of a currently approved collection | 2016-11-17 | |
Approved with change |
Extension without change of a currently approved collection | 2013-09-27 | |
Approved without change |
Extension without change of a currently approved collection | 2010-05-27 | |
Approved without change |
Extension without change of a currently approved collection | 2007-05-16 | |
Approved with change |
New collection (Request for a new OMB Control Number) | 2003-08-27 |