NRC Form 327, Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report, and NUREG/BR-009, Instructions and Guidance for Completing Physical Inventory

ICR 201312-3150-001

OMB: 3150-0139

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2013-12-19
ICR Details
3150-0139 201312-3150-001
Historical Active 201009-3150-003
NRC
NRC Form 327, Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report, and NUREG/BR-009, Instructions and Guidance for Completing Physical Inventory
Extension without change of a currently approved collection   No
Regular
Approved with change 03/06/2014
Retrieve Notice of Action (NOA) 12/26/2013
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2017 36 Months From Approved 03/31/2014
35 0 31
140 0 124
0 0 0

NRC Form 327 is submitted by fuel facility licensees to account for special nuclear material. The data is used by NRC to assess licensee material control and accounting programs and to confirm the absence of (or detect the occurrence of) SNM through theft or diversion. NUREG/BR-006 provides specific guidance and instructions for completing the form in accordance with the requirements appropriate for a particular licensee.

PL: Pub.L. 83 - 703 68 STAT 919 Name of Law: Atomic Energy Act
  
None

Not associated with rulemaking

  78 FR 47009 08/02/2013
78 FR 70353 11/25/2013
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 35 31 0 0 4 0
Annual Time Burden (Hours) 140 124 0 0 16 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
The burden increased by 16 hours, from 124 hours (31 reports x 4 hours per report) to 140 hours (35 reports x 4 hours per report). This increase is due to the realization that 12 reports provided by the enrichment (for natural uranium, depleted uranium and low-enriched uranium) and fuel fabrication plants (for natural uranium and depleted uranium) had not been identified and accounted for during the last extension. In addition, three plants (one enrichment plant and two fuel fabrication plants) are shut down and 8 reports attributed to them are no longer provided. The NRC no longer prepares NUREG-0430 "Licensed Fuel Facility Status Report" and thus the cost to the Federal Government has been adjusted accordingly.

$19,180
No
No
No
No
No
Uncollected
Thomas Pham 301 492-3125 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/26/2013


© 2024 OMB.report | Privacy Policy