OSHA Challenge - Construction Track |
Stage I Tracking Form |
|
|
|
|
|
|
|
|
Participant Name |
|
Administrator Name |
|
Report Period |
[Enter Participant Name] |
|
[Enter Administrator Name] |
|
Time Period |
[Enter Time Period] |
|
|
Year |
[Enter Year] |
|
|
|
|
|
|
|
|
Stage I -- Management Leadership and Worker Involvement |
1. Management Commitment - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Safety and Health Vision Statement. Develop, issue, and communicate a Safety and |
No Action Taken |
No Action Taken |
Health Vision Statement (i.e., defining where the company wants to be). This Vision statement should |
address the company’s desire to participate in OSHA Challenge. This process may include involving permanent |
workers in the development of these documents. |
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Safety and Health Policy Statement. Develop, issue, and communicate a Safety and Health |
No Action Taken |
No Action Taken |
Policy Statement (i.e., what the site commits to doing). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Leadership. Company establishes a policy requiring managers to participate and demonstrate |
|
|
|
|
No Action Taken |
No Action Taken |
leadership in safety and health management system activities. Managers set an example and behaviors that |
|
|
|
|
demonstrate a commitment to safety and health, such as attending training, participating in planning |
|
|
|
|
meetings, wearing PPE, encouraging workers to report hazards, injuries |
and illnesses, enforcing the “if it’s not safe, we’re not doing it” principle, and performing other safety |
|
|
|
|
and health-related actions that are required of workers. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Adequate resources and safety and health integration. Develop a safety and health budget for the |
No Action Taken |
No Action Taken |
present and for the future, including a plan for covering typical safety and health expenditures, |
as well as unusual or emergency expenditures such as requirements for prompt correction of |
uncontrolled hazards Commit and ensure utilization of adequate resources to achieve this for OSHA |
Challenge. Take management action to begin integrating safety and health into other aspects of |
planning, such as planning for new equipment, processes, building materials, etc. Company |
establishes a policy/requirement that safety and health will be integrated into the overall |
|
|
|
|
planning and budgeting processes. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Safety and health goals and objectives. Establish, document, and communicate to workers |
|
|
|
|
No Action Taken |
No Action Taken |
the annual safety and health goals and objectives that are clear, attainable, measurable, and relevant to |
|
|
|
|
bringing about a safe and healthy work environment, as well as the policies and procedures that will help |
|
|
|
|
achieve these goals and objectives. Goals should be based on outcome of baseline and trend analysis. |
|
|
|
|
Establish a policy/requirement that subcontractors will develop their goals and objectives supportive |
|
|
|
|
of the company goals in an equivalent manner. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Clear lines of communication with workers and worker access. Take action to establish clear |
|
|
|
|
No Action Taken |
No Action Taken |
lines of communication with all workers and ensure that they have reasonable access to top |
|
|
|
|
management with regard to safety and health issues Address issues of worker language barriers by |
|
|
|
|
providing safety and health information in languages spoken and understood by workers. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Clear responsibilities, authority, and accountability for safety and health. Clarify the safety |
|
|
|
|
|
|
|
and health responsibilities of each company worker and contractor working on the site/project: |
|
|
|
a. Identify who will be responsible for achieving safety and health goals and objectives. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Identify specific persons to be accountable for meeting safety and health goals, including, |
|
|
|
|
No Action Taken |
No Action Taken |
at a minimum, managers, supervisors, and specific safety and health staff; assign adequate |
|
|
|
|
authority, as appropriate to their level of responsibility; and explain their accountability and |
|
|
|
|
authority to all workers. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Develop a safety and health accountability plan to hold managers, supervisors, and non-supervisory |
|
|
|
|
No Action Taken |
No Action Taken |
workers accountable for meeting their responsibilities through a documented performance |
|
|
|
|
standards and appraisal system. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
d. Establish a policy/requirement that subcontractors will adopt the company process for accountability |
|
|
|
|
No Action Taken |
No Action Taken |
plans and defining responsibilities or establish equivalent processes. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
8. Disciplinary plan. Establish a company policy/requirement for all workers that disciplinary action |
|
|
|
|
No Action Taken |
No Action Taken |
will be taken against any worker who does not comply with company rules, regulations, etc. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
9. Annual Self-Evaluation. No Action Required |
|
|
|
2. Worker Involvement - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Worker Safety and Health Perception Survey. Evaluate the current safety and health practices |
|
|
|
|
No Action Taken |
No Action Taken |
at the total site and establish a baseline in the following areas for each of the following categories of |
|
|
|
|
personnel – managers, supervisors, and non-supervisory workers: |
a. Levels of involvement in the safety and health management system |
|
|
|
b. Values regarding the importance of worker safety and health |
|
|
|
c. Perceptions of the effectiveness of the total company’s safety and health management system |
|
|
|
|
|
|
|
d. Perceptions of how well the culture encourages and supports reporting |
|
|
|
on hazards, accidents, and injuries |
|
|
|
e. Levels of compliance with rules or unwritten safety and health standards |
|
|
|
f. Perceptions regarding their roles, responsibilities, and accountability in ensuring safety |
|
|
|
|
|
|
|
and health on the total project/site |
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Safety and Health Perception Survey Action Plan. Develop an action plan to address the |
|
|
|
|
No Action Taken |
No Action Taken |
findings from the survey and begin implementation of the plan. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Worker notification. Notify company and subcontractor workers as follows: |
|
|
|
a. Inform managers, supervisors, non-supervisory workers of their rights under the Occupational |
|
|
|
|
No Action Taken |
No Action Taken |
Safety and Health (OSH) Act. Take steps to encourage them to freely exercise their rights, especially that |
|
|
|
|
of freely reporting hazards in the workplace. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Inform all workers, including new hires, of the company’s participation in OSHA Challenge. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Meaningful worker involvement. Develop a plan, including an implementation schedule, for |
|
|
|
|
No Action Taken |
No Action Taken |
how to bring about the meaningful involvement of all managers, supervisors, and |
non-supervisory workers through participation in various safety and health related activities. |
|
|
|
|
Specifically, for this OSHA Challenge: |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
a. Consistent with applicable labor laws, initiate the establishment of a few key teams |
|
|
|
|
No Action Taken |
No Action Taken |
(e.g., a safety and health planning team) representing different sectors of the site's staff, to bring about |
|
|
|
|
meaningful change. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Begin to involve some workers in safety and health activities such as accident investigations. |
|
|
|
|
No Action Taken |
No Action Taken |
Note: ensure that proper training is provided before workers conduct such activities. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Subcontract Worker Coverage - Actions Required |
Participant Status |
Administrator Status |
1. Subcontractor oversight and management system. Develop, document, and begin implementing the |
|
|
|
|
|
|
|
following basic elements of an oversight and management system covering subcontractors: |
|
|
|
|
|
|
|
a. Equal safety and health protection. Develop and begin implementing a plan for how to provide |
|
|
|
|
No Action Taken |
No Action Taken |
subcontractor workers with safety and health protection equal in quality to that provided to |
|
|
|
|
company workers. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Adherence to safety and health rules. Inform all subcontractors and their workers that they |
|
|
|
|
No Action Taken |
No Action Taken |
are required to adhere to all of the company’s safety and health rules, regardless of their status or the |
|
|
|
|
length of time they perform work on the site/project. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Hazards in subcontractor work areas. Establish a requirement that subcontractors provide |
|
|
|
|
No Action Taken |
No Action Taken |
timely identification, correction, and tracking of uncontrolled hazards in their work areas. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Subcontractor Selection Criteria. Establish and begin implementing a policy/requirement defining |
|
|
|
|
No Action Taken |
No Action Taken |
the company’s subcontractor selection criteria that includes as a minimum, review of the previous three |
|
|
|
|
years of injury and illness records, and review of written safety and health management systems. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Removal Policy. No action required |
|
|
Stage I -- Worksite Analysis |
1. Baseline Safety and Industrial Hygiene Hazard Analysis - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Conduct a baseline safety and industrial hygiene hazard analysis to establish initial levels of company |
|
|
|
|
No Action Taken |
No Action Taken |
and subcontractor worker exposure ( baselines) for comparison to future levels, so |
that changes can be recognized. This study should include a review of previous accidents, injuries, and |
|
|
|
|
illnesses; complaints of workplace hazards; previous studies, etc. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Ensure that the baseline survey accomplishes the following: |
No Action Taken |
No Action Taken |
a. Identifies and documents common safety hazards on the project/site and how they are controlled. |
|
|
|
|
|
|
|
b. Identifies and documents common health hazards on the project/site and determine if further |
|
|
|
|
|
|
|
sampling is needed. |
|
|
|
c. Identifies and documents safety and health hazards that need further study. |
|
|
|
d. Adequately covers the entire worksite and indicates who conducted the survey and when it was completed. |
|
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Repeat the baseline survey only if warranted by significant changes (e.g., changes in processes, |
|
|
|
|
No Action Taken |
No Action Taken |
equipment, hazard controls, etc.). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Hazard Analysis of Routine Jobs, Tasks, and Processes - Required Actions |
Participant Status |
Administrator Status |
1. Review and ensure that programs developed and/or implemented are in compliance with local, state, |
|
|
|
|
No Action Taken |
No Action Taken |
and Federal safety and health regulations based on routine tasks performed. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Begin to formalize a system to ensure workers are properly trained in the procedures implemented. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Hazard Analysis of Significant Change - Required Actions |
Participant Status |
Administrator Status |
1. Company has established and has begun implementing a policy/requirement to identify and document |
|
|
|
|
No Action Taken |
No Action Taken |
safety and health hazards of significant changes, new processes, and significant changes in design or |
|
|
|
|
engineering plans, materials, equipment, and facilities to identify uncontrolled hazards prior to the activity |
|
|
|
|
or use and recommend adequate hazard controls. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Establish a policy/requirement that subcontractors will adopt the company process for hazard analysis |
|
|
|
|
No Action Taken |
No Action Taken |
of significant changes, participate in company hazard analysis activities, or establish equivalent processes. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Pre-Use Analysis - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. If the company is considering new equipment, chemicals, facilities, or significantly different operations or |
|
|
|
|
No Action Taken |
No Action Taken |
procedures, conduct a pre-use analysis to review the potential safety and health impact on the workers. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Develop and begin implementing a plan for how to integrate this practice into the procurement/design |
|
|
|
|
No Action Taken |
No Action Taken |
phase to maximize the opportunity for proactive hazard control. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Take proactive steps to ensure pre-use analysis continues to be integrated into the procurement/ |
|
|
|
|
No Action Taken |
No Action Taken |
design phases. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Establish a policy/requirement that subcontractors adopt the company process for pre-use analysis, |
|
|
|
|
No Action Taken |
No Action Taken |
participate in company activities, or establish equivalent processes. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Industrial Hygiene Program - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. No action required. |
|
|
|
6. Routine Self-Inspections - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Establish a routine self-inspection program and perform safety and health inspections on a regular basis. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Train company workers in the recognition and avoidance of hazards in their work environment and |
|
|
|
|
No Action Taken |
No Action Taken |
begin having them routinely inspect their work areas, materials, and equipment on a regular basis. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Accident Investigations - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Company establishes a documented policy/requirement on reporting and investigating accidents. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Company investigates accidents and maintains written reports of the investigations. Investigations should |
|
|
|
|
No Action Taken |
No Action Taken |
follow the following guidelines: |
a. Identify all contributing factors. |
|
|
|
b. Document the entire sequence of relevant events. |
|
|
|
c. Recommend actions to prevent recurrence. |
|
|
|
d. Assign timeframes and responsibility for implementing recommended controls. |
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Establish a policy/requirement that subcontractors adopt the company process for accident |
|
|
|
|
No Action Taken |
No Action Taken |
investigation, or establish equivalent processes. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
8. Hazard Reporting System for workers - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Use data collected on accident incident reports (e.g., Employers First Report of Injury), insurance |
|
|
|
|
No Action Taken |
No Action Taken |
loss runs, etc. to determine the areas that should be concentrated on. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Share information and seek supervisor and worker input for a suggested plan of action for |
|
|
|
|
No Action Taken |
No Action Taken |
developing a hazard reporting system, using model programs (e.g., from insurance carriers, |
|
|
|
|
peer groups, OSHA Challenge Coordinator) for guidance. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
9. Trend Analysis - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Conduct a trend analysis of previous three complete calendar years’ injury and illness history, based |
|
|
|
|
No Action Taken |
No Action Taken |
on a thorough review of OSHA 300 logs, workers' compensation claim forms, and accident reports. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Begin developing a plan for conducting an analysis of other safety and health-related information |
|
|
|
|
No Action Taken |
No Action Taken |
(e.g., hazards identified during inspections, worker reports of hazards, accidents, near-misses, etc.) |
|
|
|
|
for the purpose of establishing or detecting trends, planning, and setting goals. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage I -- Hazard Prevention and Control |
1. Certified Professional Resources - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Ensure that outside sources are available if needed to conduct baseline hazard analysis, and that they |
|
|
|
|
No Action Taken |
No Action Taken |
are certified, competent, and qualified to perform baselines pertinent to the work activity involved. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Hazard Elimination and Control Methods - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Company establishes and implements a system that prioritizes hazards identified in this stage based on |
|
|
|
|
No Action Taken |
No Action Taken |
the potential seriousness of injury, illness, property loss, frequency of exposure, and long- term effects. |
|
|
|
|
Establish an action plan for correction. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Identify options and select the most appropriate option or combination of options for hazard elimination |
|
|
|
|
No Action Taken |
No Action Taken |
and control methods, including engineering controls, administrative controls, work practices, and |
|
|
|
|
PPE. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Take steps to ensure that the selected controls are appropriate to the project/site’s hazard(s); understood and |
|
|
|
|
No Action Taken |
No Action Taken |
followed by all affected parties; equitably enforced through the disciplinary system; written, implemented, |
|
|
|
|
and updated as needed; used by workers; and incorporated into training, positive reinforcement, |
|
|
|
|
and correction programs. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Require subcontractors to adopt company hazard elimination and control system or implement |
|
|
|
|
No Action Taken |
No Action Taken |
an equivalent system. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Hazard Control Programs - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Conduct an inventory of existing hazard control programs required by OSHA standards |
|
|
|
|
No Action Taken |
No Action Taken |
(e.g., PPE, Hazard Communication, Respiratory Protection, Lockout/Tagout, Confined Space |
|
|
|
|
Entry, Process Safety Management, or Bloodborne Pathogens). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Review existing programs to identify what is missing or unsatisfactory. |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Develop missing programs and modify existing programs, as needed, to meet all OSHA guidelines, |
|
|
|
|
No Action Taken |
No Action Taken |
including training requirements. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Develop and distribute to workers appropriate company safety and health rules, requirements, |
|
|
|
|
No Action Taken |
No Action Taken |
procedures, manuals, etc., necessary to define and communicate company hazard control programs. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Require subcontractors to adopt and implement company hazard control programs or establish |
|
|
|
|
No Action Taken |
No Action Taken |
equivalent programs. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Occupational Health Care Program - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Records Review. Conduct a thorough review of injury/illness records (see above) and ensure |
|
|
|
|
No Action Taken |
No Action Taken |
they are in order. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Licensed health care professionals. Provide workers access to licensed health care professionals |
|
|
|
|
No Action Taken |
No Action Taken |
who can provide onsite or offsite services and emergency services. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Subcontractor Health Care. Require subcontractors to provide access to health care services, as |
|
|
|
|
No Action Taken |
No Action Taken |
required, based on results of the baseline safety and health analysis including physician and |
|
|
|
|
emergency medical care. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Preventative Maintenance of Equipment - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Conduct an inventory of equipment that requires preventive maintenance and develop a preventive |
|
|
|
|
No Action Taken |
No Action Taken |
maintenance schedule. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Require subcontractors to adopt and implement the company preventive maintenance process, |
|
|
|
|
No Action Taken |
No Action Taken |
participate in the company if necessary, or establish an equivalent system. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Tracking of Hazard Correction - Actions Required |
|
|
|
|
Participant Status |
Administrator Status |
1. Develop and begin using a documented system to record hazards identified in this stage through the |
|
|
|
|
No Action Taken |
No Action Taken |
baseline study, trend analysis, and accident investigations. The system must document priority, assign |
|
|
|
|
responsibility for correction, establish timeframes for correction, and follow up to ensure total abatement. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Require subcontractors to adopt and implement the company tracking system or establish an |
|
|
|
|
No Action Taken |
No Action Taken |
equivalent system. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Emergency Preparedness and Response - Required Actions |
|
|
|
|
Participant Status |
Administrator Status |
1. Establish and communicate company written procedures to company and subcontractor workers for |
|
|
|
|
No Action Taken |
No Action Taken |
responding during all shifts to all types of emergencies (fire, chemical spill, accident, terrorist threat, |
|
|
|
|
natural disaster, etc.). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Conduct at least one evacuation drill and assess how well the procedures worked. |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Make available and explain to all workers emergency procedures and services, including |
|
|
|
|
No Action Taken |
No Action Taken |
provisions for physician care and emergency medical care, ambulances, emergency |
|
|
|
|
medical technicians, emergency clinics, or hospital emergency rooms, available for all shifts |
|
|
|
|
within a reasonable time and distance. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Conduct at least one training class on first aid and CPR so that there is at least one trained worker |
|
|
|
|
No Action Taken |
No Action Taken |
for each shift . |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Require subcontractors to adopt the company emergency procedures or equivalent procedures, and |
|
|
|
|
No Action Taken |
No Action Taken |
participate in company emergency drills and activities listed above. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage I -- Safety and Health Training |
|
1. Safety and Health Training - Required Actions |
Participant Status |
Administrator Status |
1. Provide training to managers, supervisors, non-supervisory workers following the general |
|
|
|
|
|
|
|
guidelines below: |
|
|
|
a. Ensure OSHA required training is performed, documented, and up-to-date. |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Document attendance. |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Ensure that training is conducted by persons who have specific subject matter knowledge or expertise. |
|
|
|
|
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
d. Use findings of the various worksite analysis activities (e.g., baseline study, hazard analysis of |
|
|
|
|
No Action Taken |
No Action Taken |
routine jobs, tasks, and processes, etc.) to develop training that is relevant to the company (e.g., training |
|
|
|
|
on safe job procedures; modifying workstations, equipment, or materials; incorporating findings in future |
|
|
|
|
planning efforts, etc.). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. At a minimum, provide the following types of training to current or new managers, supervisors, and |
|
|
|
|
|
|
non-supervisory workers: |
|
a. Their rights under the OSH Act |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. OSHA Challenge |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Hazards in the workplace; how to recognize hazardous conditions; signs and symptoms of |
|
|
|
|
No Action Taken |
No Action Taken |
workplace-related illnesses; protective measures; safe work procedures |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
d. What is required PPE, why it is required, its limitations, how to use it, and how to maintain it |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
e. Specific responsibilities for each type of emergency |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
f. Emergency evacuation procedures |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. At a minimum, provide the following types of training to managers and supervisors: |
|
a. Specific safety and health responsibilities and how to carry them out effectively |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Methods for changing workplace safety and health attitudes and practices |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Requirements for OSHA Challenge Stage I |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. At a minimum, provide the following types of training to subcontractor workers: |
|
|
a. Their rights under the OSH Act |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. OSHA Challenge |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Hazards in the workplace |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
d. What is required PPE, why it is required, its limitations, how to use it, and how to maintain it |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
e. Specific responsibilities for each type of emergency |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
f. Emergency evacuation procedures |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage I -- Documentation |
1. Minimum Required Documentation |
Participant Status |
Administrator Status |
1. Vision and policy statements |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. The most recent annual safety and health goals and objectives |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Accountability plan |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Budget documents showing allocated resources for Safety and Health |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Disciplinary Plan |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Contract selection requirements |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Accurate and up to date records of injury and illness for the previous three calendar years including: |
|
|
|
|
|
|
|
• OSHA 300 logs |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
• Insurance claim forms |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
• Accident reports |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
8. Baseline hazard analysis results, including IH reports |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
9. Written hazard control programs |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
10. Accident investigation forms and reports |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
11. Written contractor policies for this stage |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
12. Safety and Health Perception Survey form |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
13. Results of Safety and Health Perception Survey and plan for addressing changes |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
14. Trend analysis results |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
15. Accident Investigation procedure |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
16. Hazard correction action plan |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
17. Hazard correction tracking system |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
18. Preventive maintenance inventory |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
19. Written emergency procedures |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
20. Training records |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OSHA Challenge - Construction Track |
|
|
Stage II Tracking Form |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Participant Name |
|
Administrator Name |
|
Report Period |
|
|
[Enter Participant Name] |
|
[Enter Administrator Name] |
|
Time Period |
[Enter Time Period] |
|
|
|
|
Year |
[Enter Year] |
|
|
|
|
|
|
|
|
|
|
|
|
Stage II -- Management Leadership and worker Involvement |
|
|
1. Management Commitment - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Safety and Health Mission and Policy Statements. Continue to communicate the company’s |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Safety and Health Vision and Policy Statements to Company and subcontractor workers. Incorporate |
|
|
|
|
|
|
appropriate information about the Safety and Health Vision and Policy Statement into the company’s |
|
|
|
|
|
|
orientation training for new workers and subcontractors. Include the company’s vision and policy in |
|
|
|
|
|
|
contract bid documents. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Leadership. Company managers continue setting an example through behaviors that demonstrate |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
total commitment to safety and health. Ensure increased participation by top executives and managers in |
|
|
|
|
|
|
safety and health related activities, including examples of activities established in Stage I. Require |
|
|
|
|
|
|
subcontractors to begin implementing a policy/requirement on leadership and participation or follow |
|
|
|
|
|
|
established policies and requirements of the subcontractor. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Adequate resources and safety and health integration. Continue committing and ensuring the |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
utilization of adequate resources to support safety and health activities and programs |
|
|
|
|
|
|
including of certified safety and health and licensed health care professionals. Improve the integration |
|
|
|
|
|
|
of safety and health into other planning and budgeting processes. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Safety and health goals and objectives. Review progress towards achievement of the company |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
safety and health goals and objectives, as well as the policies and procedures to meet them; revise and |
|
|
|
|
|
|
communicate new annual goals and objectives, as appropriate. Require that subcontractors develop |
|
|
|
|
|
|
goals and objectives that are consistent with and supportive of the Company’s overall goals related to |
|
|
|
|
|
|
OSHA Challenge participation. Selected subcontractors begin implementing requirement. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
5. Clear lines of communication with workers and worker access. Continue to take |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
necessary action to clarify lines of communication with Company and subcontractor workers and ensure |
|
|
|
|
|
|
access to senior management regarding safety and health issues. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
6. Clear responsibilities, authority, and accountability for safety and health. Continue |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
clarifying safety and health expectations for company and subcontractor workers on the site. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
a. Begin implementing the accountability plan for Company managers, supervisors, and safety and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
health staff; incorporate performance, responsibilities, and standards for safety and health, as well as the |
|
|
|
|
|
|
consequences for meeting or failing to meet expectations. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
b. Communicate management expectations regarding everyone’s safety and health responsibilities. |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
c. Support the authority of designated staff members who are accountable for safety and health goals. |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
d. Communicate which Company personnel are responsible for achieving safety and health goals and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
objectives, with no unassigned areas, so that each worker and contract worker understands his/her |
|
|
|
|
|
|
responsibility for safety and health. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
e. Monitor the performance of all Company managers, supervisors, and specific safety and health staff |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
members; giving them specific and timely feedback on performance; requiring corrective action plans if |
|
|
|
|
|
|
needed; conducting performance appraisals; providing commensurate rewards and recognition for good |
|
|
|
|
|
|
performance; and implementing consequences for poor performance. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
f. Require that subcontractors adopt and begin implementing the Company accountability planning process |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
or establish an equivalent process. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
7. Disciplinary plan. Develop and begin implementing a disciplinary plan (policy, procedures, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
consequences), with an implementation schedule. Ensure equitable enforcement among all |
|
|
|
|
|
|
non-supervisory workers, as well across levels (e.g., management staff should not get better treatment |
|
|
|
|
|
|
than non-supervisory workers). Demonstrate that workers will be held accountable for non-compliance |
|
|
|
|
|
|
with rules and requirements. Require that subcontractors adopt and begin implementing the company |
|
|
|
|
|
|
procedure or establish equivalent processes. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
8. Annual self-evaluation of safety and health management system. Develop a written company |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
procedure defining how annual self evaluations and other evaluations will be performed, including the |
|
|
|
|
|
|
requirement for written narrative reports. Require that subcontractors adopt the company procedure or |
|
|
|
|
|
|
establish an equivalent process. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Worker Involvement - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Safety and Health Perceptions Survey. Review and respond to the findings and conclusions of |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
the Safety and Health Perceptions Survey conducted in Stage I. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Safety and Health Perceptions Survey Change Plan. Implement the company’s Safety and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Health Perception Survey Change Plan developed in Stage I. Require subcontractors to develop an action |
|
|
|
|
|
|
plan that addresses findings related to them. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Worker notification. Notify new Company managers, supervisors, and non-supervisory |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
workers of their rights under the OSH Act, of the company’s participation in OSHA Challenge, |
|
|
|
|
|
|
and any other pertinent information. Incorporate this information into the company's orientation for |
|
|
new workers and subcontractors. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Worker involvement. Implement the company worker involvement plan, developed in Stage I, |
|
|
|
|
|
|
|
|
|
such as: |
|
|
|
|
|
a. The formation of new and/or greater participation in safety and health teams to meet the company’s |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
needs at this Stage of OSHA Challenge. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
b. Increase worker participation as part of safety and health teams that conduct accident/ |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
near-miss investigations, self-inspections, and job hazard analyses. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
c. Require subcontractors to adopt and begin implementing the company worker involvement plan, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
participate in activities per contract and/or agreement, or establish equivalent plans. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Subcontract Worker Coverage - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Subcontractor oversight and management program. Company improves and fully implements the |
|
|
|
|
|
|
|
|
|
following basic elements of an oversight and management system covering subcontractors: |
|
|
|
|
|
|
|
|
|
a. Equal safety and health protection. Work with subcontractors to improve and continue |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
implementing the subcontractor program begun in Stage I to the point that provides protections |
|
|
|
|
|
|
equal to company programs. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
b. Adherence to safety and health rules. Improve process for requiring subcontract workers who |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
work onsite whether regular or temporary to adhere to all of the company’s safety and health rules, |
|
|
|
|
|
|
regardless of their status or the length of time they perform work onsite. The process must include |
|
|
|
|
|
|
advising subcontractor workers that disciplinary action will be taken against workers that do not |
|
|
|
|
|
|
follow company rules and requirements. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
c. Subcontractor selection and oversight. Implement a policy and process for addressing |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
safety and health performance of potential bidders, including the review of written safety and health plan |
|
|
|
|
|
|
and injury and illness rates, in subcontractor selection and oversight. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
d. Hazards in subcontractor work areas. Ensure subcontractors improve and formalize their own |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
processes for the timely identification, correction, and tracking of uncontrolled hazards in their work |
|
|
|
|
|
|
areas and operations. |
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
e. Removal of subcontractor for violations. Company establishes and implements a penalty policy |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
and process for safety or health violations in subcontractor work areas including removal and/or |
|
|
|
|
|
|
financial penalties. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
Stage II -- Worksite Analysis |
|
|
1. Baseline Safety and Industrial Hygiene Hazard Analysis - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company requires as a contract requirement that subcontractors must perform a baseline safety and IH |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
hazard analysis for the work they are contracted and assigned to perform. Subcontractors begin performing |
|
|
|
|
|
|
the required baseline safety and IH hazard analyses. (See IH Required Actions below) |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Hazard Analysis of Routine Jobs, Tasks, and Processes - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Identify and document safety and health hazards of routine jobs, tasks, and processes and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
recommend adequate hazard controls by conducting task-based or system/process hazard analyses |
|
|
|
|
|
|
when the routine jobs, tasks, and processes have had injuries/illnesses associated with them or have: |
|
|
|
|
|
|
experienced significant incidents or near-misses; are perceived as high-hazard tasks, i.e., they could |
|
|
|
|
|
|
result in a catastrophic explosion, electrocution, or chemical overexposure; or are required by a regulation |
|
|
|
|
|
|
or standard. Identify the steps of the task or procedure being analyzed, the hazard controls currently |
|
|
|
|
|
|
in place, recommendations for needed additional hazard controls, dates conducted, and |
|
|
|
|
|
|
the responsible parties. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Update the hazard analysis as appropriate, such as when the environment, procedures, or equipment |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
change or when errors are found that invalidate the most recent hazard analysis. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Require subcontractors to adopt and begin implementing the company hazard analysis of routine system |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
or establish equivalent plans. Subcontractors begin performing effective hazard analysis of routine work. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Hazard Analysis of Significant Changes - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company continues identifying and documenting safety and health hazards of significant changes, including |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
but not limited to: non-routine tasks (e.g., performed less than once per year) and new processes, materials, |
|
|
|
|
|
|
equipment, and facilities. Company identifies uncontrolled hazards prior to the activity or use and recommends |
|
|
|
|
|
|
adequate hazard control measures. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Subcontractors implement policy and begin identifying and documenting safety and health hazards of |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
significant changes in the work they are contracted to perform, including but not limited to non-routine tasks. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Pre-Use Analysis - Outcomes Achieved - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company is continuing to consider new equipment, chemicals, facilities, or significantly different operations |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
or procedures, conduct a pre-use analysis to review the potential safety and health impacts on workers. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Subcontractors begin to perform pre-use analysis for work they are contracted to perform. |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
5. Industrial Hygiene (IH) Program - Required Actions |
Participant Status |
Administrator Status |
|
|
1. The site develops a written IH Program to establish procedures and methods for identifying, analyzing, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
and controlling health hazards to prevent occupational disease. The written program must address |
|
|
|
|
|
|
sampling issues, including sampling methods, performed by whom, compared to what, required documentation, |
|
|
|
|
|
|
and how communicated to workers. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company begins implementing the IH Program by doing the following: |
|
|
|
|
|
a. Follow up on the results of the baseline study conducted in Stage I. |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
b. Establish and implement sampling frequencies – a schedule for sampling identified hazards |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
– and conduct additional sampling as needed, based on findings of the baseline hazard analysis, |
|
|
|
|
|
|
review of chemicals, worker reports of hazards, previous exposures, and reports of illnesses. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
c. Begin implementing appropriate controls for hazards identified in Stages I and II. |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company requires subcontractors to adopt and implement the company IH program for the work they |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
are contracted to perform or establish an equivalent program. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors establish and begin implementing IH program activities discussed above, follow up on |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
baseline IH study results, if appropriate, and perform more in-depth analyses to determine actual |
|
|
|
|
|
|
worker exposures. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
6. Routine Self-Inspections - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company develops a documented system for routinely scheduled self-inspections of the workplace, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
including a tool or checklist, the inspection schedule, the members of the regular self-inspection teams to |
|
|
|
|
|
|
be created, recording of findings, responsibility for abatement, and tracking of identified hazards for |
|
|
|
|
|
|
timely correction. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Start self-inspections, at a minimum, by competent persons and cover the entire site at least weekly. |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company requires subcontractors to adopt and implement the company routine inspection program or |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
establish an equivalent program. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors have adopted an equivalent documented routine self-inspection system program and have |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
begun performing routine inspections of work areas and the activities they are contracted to perform. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
7. Hazard Reporting System for workers - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company develops and begins implementing a hazard-reporting system, which may be anonymous, that |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
allows workers to use specific tools to inform management staff without fear of reprisal, about |
|
|
|
|
|
|
potential hazardous conditions, accidents, and near-misses. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Determine and communicate to workers how they will receive feedback on actions taken regarding |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
the hazards they report. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company requires subcontractors to adopt and implement the company worker hazard reporting system |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
or establish an equivalent system. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors begin to implement an equivalent worker hazard reporting system for work areas and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
the activities hey are contracted to perform. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
8. Investigation of Accidents and Near-Misses - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company and subcontractors continue investigating accidents, following the guidelines established in Stage I. |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company and subcontractors expand their accident investigation procedures to include near-misses |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
and begin investigating near-misses, following the same guidelines established in Stage I for |
|
|
|
|
|
|
investigating accidents. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company and subcontractors continue making findings and corrective actions available to workers |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
on request (although actual investigation records need not be provided). |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
9. Trend Analysis - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Conduct a trend analysis of the other safety and health-related information not yet studied |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
(e.g., hazards identified during inspections, worker reports of hazards, accidents, and |
|
|
|
|
|
|
near-misses, etc.) for the purpose of establishing or detecting trends, planning, and setting goals. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Conduct another trend analysis of injury and illness history if a year has gone by since the |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
initial trend analysis. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company requires subcontractors to adopt and implement the company systems for trend analysis or |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
establish an equivalent system. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
Stage II -- Hazard Prevention and Control |
|
|
1. Certified Professional Resources - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company ensures adequate resources such as certified safety and health professionals, licensed |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
health care professionals, and other experts as needed, based on the risks at the site. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Subcontractors ensure the availability to certified safety and health professionals and licensed |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
health care professionals as needed. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Hazard Elimination and Control Methods - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company prioritizes hazards identified in this stage based on seriousness and frequency of injury or illness |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
or property loss, frequency of exposure, and long- term effects. Establish an action plan for correction. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company identifies options and selects the most appropriate option or combination of options for |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
hazard elimination and control methods, including engineering controls (including protective safety devices), |
|
|
|
|
|
|
administrative controls, work practices, and PPE. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company takes steps to ensure that the selected controls are: appropriate to the site’s hazard(s); |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
understood and followed by all affected parties; equitably enforced through the disciplinary system; written, |
|
|
|
|
|
|
implemented, and updated as needed; used by workers; and incorporated into training, positive |
|
|
|
|
|
|
reinforcement, and correction programs. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors adopt equivalent hazard control methods and have begun implementing the controls listed |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
above in the work it has been contracted to perform. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Hazard Control Programs - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company continues implementing hazard control programs required by OSHA standards. Modify and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
improve, as needed. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company continues training all workers on these programs, as needed. |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company establishes necessary hazard control programs in compliance with new OSHA standards, if any. |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors adopt and begin implementing equivalent hazard control programs in the work they |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
are contracted to perform. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Tracking of Hazard Correction - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Continue implementing and improving the documented system established in Stage I to record |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
hazards identified. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Record priority, responsibility for correction, timeframes for correction, and follow-up to ensure total |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
hazard abatement. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Subcontractors have begun implementing a hazard correction tracking system for hazards identified in |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
the baseline hazards analyses, trend analysis, and self inspection. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
5. Preventive Maintenance of Equipment - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company reviews the equipment inventory developed in Stage I. |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company establishes and begins following a preventive maintenance schedule to monitor and maintain |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
equipment so it can be replaced or repaired on a schedule according to manufacturers’ recommendations. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Subcontractors adopt equivalent preventive maintenance systems and begin implementation by |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
inventorying equipment and material needing preventive maintenance. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
6. Occupational Health Care Program - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Licensed health care professionals. Company provides workers access to licensed health care |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
professionals who can provide onsite or offsite services. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Health services, as needed. Company arranges for health services, such as pre-placement physicals, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
audiograms, and lung function tests for workers, as needed, based on the outcomes of the baseline |
|
|
|
|
|
|
safety and health analysis. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Subcontractors determine how to provide equivalent access to licensed health care, physician care, and |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
emergency services for their workers working on site. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Subcontractors and company (per agreements) begin providing occupational health care for |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
subcontractor workers. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
5. Information will be communicated to workers in writing and will be a part of the worker site |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
orientation program. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
7. Emergency Preparedness and Response - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company and subcontractors continue communicating the emergency procedures . |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Company and subcontractors improve emergency procedures and services, including provisions for |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
emergency medical care, emergency transportation, emergency clinics, or hospital emergency rooms. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Company and subcontractors establish an Emergency Response team including: persons trained in first aid |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
and CPR available on all shifts (or an alternative that is at least as effective). Increase the number of |
|
|
|
|
|
|
trained individuals from Stage I. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Company and subcontractors conduct at least one evacuation drill, assess how well the procedures |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
worked, and improve the emergency procedures, as needed. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
Stage II -- Safety and Health Training |
|
|
1. Safety and Health Training - Required Actions |
Participant Status |
Administrator Status |
|
|
1. Company and subcontractors continue to provide training to managers, supervisors, non-supervisory |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
workers, and subcontractors following the general guidelines established in Stage I. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. As needed, company and subcontractors continue to provide current or new managers, supervisors, |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
non-supervisory workers, subcontractors, and designated safety and health staff all the required training |
|
|
|
|
|
|
established in Stage I. |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. In addition to required training established in Stage I, at a minimum, company and subcontractors provide the |
|
|
|
|
|
|
|
|
|
following types of training to designated safety and health staff and others with assigned safety and health |
|
|
|
|
|
|
|
|
|
responsibilities to help them develop the knowledge and skills necessary to perform their assigned tasks. |
|
|
|
|
|
|
|
|
|
This includes the following: |
|
|
|
|
|
a. How to develop a disciplinary plan |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
b. How to develop a system and written procedures to annually evaluate the total site’s safety |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
and health management system |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
c. How to conduct hazard analyses of significant changes |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
d. How to conduct pre-use analyses |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
e. How to conduct IH sampling, if applicable |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
f. How to conduct an annual evaluation of the site’s safety and health management system |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. In addition to required training established in Stage I, at a minimum, subcontractors provide their workers |
|
|
|
|
No Action Taken |
No Action Taken |
|
|
with training on how to recognize hazardous conditions, signs and symptoms of workplace-related illnesses, |
|
|
|
|
|
|
protective measures, and safe work procedures for the work they are contracted to perform. |
|
|
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
Stage II -- Documentation |
|
|
1. Minimum Required Documentation |
Participant Status |
Administrator Status |
|
|
1. All documentation required in Stage I |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
2. Job Hazard Analysis forms and records |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
3. Routine self-inspection forms and records |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
4. Worker Hazard reporting forms |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
5. Minutes, charters, mission statements of safety and health teams |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
6. Subcontractor program documentation – updated to include additional policies established in this stage |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
7. Trend analysis procedure and reports |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
8. Written IH Program - and any sampling results since the baseline |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
9. Documentation showing implementation of hazard controls and their effectiveness |
No Action Taken |
No Action Taken |
|
|
(i.e.- ventilation studies, PPE purchases, machine guarding purchases) |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
10. Written Preventive Maintenance schedule and system |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
11. Emergency Procedures – updated since Stage I |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
12. Training matrix and records |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
13. Revised S&H Goals and Objectives |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
14. Annual self evaluation procedure |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
15. Policy on subcontractor removal |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
16. Subcontractor documentation |
|
|
|
|
|
§ Safety and Health Program |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
§ Inspection reports |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
§ Correction tracking reports |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
§ Accident reports |
No Action Taken |
No Action Taken |
|
|
Participant Goal: |
Date Completed: |
|
|
|
|
Participant Actions Taken: |
|
|
Administrator Narrative: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OSHA Challenge - Construction Track |
Stage III Tracking Form |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Participant Name |
|
Administrator Name |
|
Report Period |
[Enter Participant Name] |
|
[Enter Administrator Name] |
|
Time Period |
[Enter Time Period] |
|
|
Year |
[Enter Year] |
|
|
|
|
|
|
|
|
Stage III -- Management Leadership and worker Involvement |
1. Management Commitment - Required Actions |
Participant Status |
Administrator Status |
1. Safety and Health Mission and Policy Statements. Continue to communicate the |
No Action Taken |
No Action Taken |
company’s Safety and Health Vision and Policy Statements and take necessary steps to ensure all |
|
|
|
|
workers understand the statements. Ensure that appropriate information about the company’s |
|
|
|
|
Safety and Health Vision and Policy Statements becomes a routine part of the training for new workers. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Leadership by example. Management continues setting an example through behaviors that |
|
|
|
|
No Action Taken |
No Action Taken |
demonstrate total commitment to safety and health (see examples in Stage I). Ensure total involvement of |
|
|
|
|
all executives, managers, and supervisors in the safety and health related activities and programs. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Adequate resources and safety and health integration. Managers continue committing and |
|
|
|
|
No Action Taken |
No Action Taken |
ensuring the utilization of adequate resources to support safety and health activities and programs. |
|
|
|
|
Ensure that safety and health is routinely integrated into all planning processes at the site, for both |
|
|
|
|
company and subcontractors. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Safety and health goals and objectives. Company and subcontractors review, revise, and |
|
|
|
|
No Action Taken |
No Action Taken |
continue communicating, as appropriate to this Stage, the previous year’s safety and health goals and |
|
|
|
|
objectives, as well as the policies and procedures to meet them. Ensure that safety and health goals |
|
|
|
|
and objectives are routinely considered in planning for and implementing the various activities |
|
|
|
|
and programs. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Clear lines of communication with workers and worker access. Continue to take |
|
|
|
|
No Action Taken |
No Action Taken |
necessary action to clarify lines of communication with all workers and subcontractors and ensure |
|
|
|
|
reasonable access to senior management with regard to safety and health issues. Take proactive steps |
|
|
|
|
to encourage open dialogue between management staff and workers. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Clear responsibilities, authority, and accountability for safety and health. Company |
|
|
|
|
No Action Taken |
No Action Taken |
and subcontractors continue clarifying safety and health expectations for each worker working on the |
|
|
|
|
project/site. Ensure that all workers understand and accept their safety and health roles and |
|
|
|
|
responsibilities. Continue supporting the authority of designated staff members who are accountable |
|
|
|
|
for achieving safety and health goals and objectives. In addition: |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
a. Ensure that safety and health performance elements have been incorporated into the written |
|
|
|
|
No Action Taken |
No Action Taken |
job descriptions and performance plans of all workers, including managers, supervisors, |
|
|
|
|
and non-supervisory workers, as well as subcontractors. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Incorporate safety and health responsibilities into the job descriptions and performance plans |
|
|
|
|
No Action Taken |
No Action Taken |
of all non-supervisory workers and ensure that every individual’s safety and health |
|
|
|
|
performance is monitored and evaluated and that everyone receives feedback on |
|
|
|
|
their safety and health performance. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Develop and implement a system of rewards and recognition for exemplary safety |
|
|
|
|
No Action Taken |
No Action Taken |
and health performance. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Disciplinary plan. Improve and continue implementing the disciplinary plan, developed in Stage I |
|
|
|
|
No Action Taken |
No Action Taken |
ensuring equitable enforcement as required. Enforce the plan to ensure higher levels of compliance to |
|
|
|
|
achieve the desired outcomes. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
8. Annual self-evaluation of safety and health management system. Company and subcontractors |
|
|
|
|
No Action Taken |
No Action Taken |
implement systems and written procedures to annually evaluate the entire site’s safety and health mgt. |
|
|
|
|
systems. The evaluations may be conducted by company and/or subcontractor workers with managers, |
|
|
|
|
qualified corporate staff, or trained outsiders. The evaluations must: identify in a written narrative report |
|
|
|
|
the strengths and weaknesses of the safety and health management system; contain specific |
|
|
|
|
recommendations, timelines, and assignment of responsibilities for improvements; and document actions |
|
|
|
|
taken to satisfy the recommendations. The company must conduct at least one annual self-evaluation of |
|
|
|
|
its safety and health management system in this stage. The company must conduct additional |
|
|
|
|
self-evaluations each year they remain in OSHA Challenge. If applicable, a self-evaluation |
|
|
|
|
must be performed immediately prior to construction completion. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Worker Involvement - Required Actions |
Participant Status |
Administrator Status |
1. Follow-up Safety and Health Perception Survey. Company conducts a follow-up Safety and Health |
|
|
|
|
No Action Taken |
No Action Taken |
Perception Survey to identify further improvements. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Safety and Health Perception Survey Change Plan. Company continues implementing the Safety and |
|
|
|
|
No Action Taken |
No Action Taken |
Health Perception Survey Change Plan developed in Stage I. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Worker notification. Company continues notifying new managers, supervisors, and non-supervisory |
|
|
|
|
No Action Taken |
No Action Taken |
workers of their rights under the OSH Act and of the site’s participation in OSHA Challenge. All changes |
|
|
|
|
will be incorporated into the company’s orientation training for new workers and subcontractors. |
Take proactive steps to encourage all workers to freely excerise their rights, especially that of freely |
|
|
|
|
reporting hazards in the workplace. At least annually, reinforce policies regarding rights and |
|
|
|
|
responsibilities for all company and subcontractor workers working on the site or project. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Worker involvement. Take proactive steps to ensure full implementation of the site’s worker |
|
|
|
|
|
|
|
involvement plan developed in Stage I and refined in Stage II. Additionally for Stage III the company will: |
|
|
|
|
|
|
|
a. Ensure that all the safety health teams needed to achieve the required outcomes for |
|
|
|
|
No Action Taken |
No Action Taken |
Stage III are established and that there is broad and active worker participation in these teams. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Ensure that audits, accident/incident investigations, self-inspections, and job hazard analyses are |
|
|
|
|
No Action Taken |
No Action Taken |
routinely conducted by regular teams that have broad and active worker representation. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Take proactive steps for subcontractor worker participation. Encourage more active |
|
|
|
|
No Action Taken |
No Action Taken |
and open worker participation by all subcontractor workers and continue to develop programs to |
|
|
|
|
include more participation for subcontractor workers where appropriate. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Contract Worker Coverage - Required Actions |
Participant Status |
Administrator Status |
1. Adherence to rules. Ensure subcontractors and multi-tier subcontractors are aware of company |
|
|
|
|
No Action Taken |
No Action Taken |
safety and health rules and continue to enforce for safety and health violations. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Subcontractor selection and oversight. Continue to improve and implement subcontractor oversight |
|
|
|
|
No Action Taken |
No Action Taken |
program. Take proactive steps to ensure that subcontractors receive safety and health protection equal to |
|
|
|
|
that received by company workers; that they adhere to the company’s safety and health rules and are |
|
|
|
|
removed promptly for safety and health violations; that company management considers contractors’ safety |
|
|
|
|
and health management systems and performance in selecting subcontractors and overseeing their work. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Subcontractor hazard correction. Ensure that the subcontractors have the ability to identify, correct, |
|
|
|
|
No Action Taken |
No Action Taken |
and track uncontrolled hazards in work areas for which they are responsible. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Removal Policy. Ensure subcontractors and multi-tier subcontractors are aware of the penalty policies |
|
|
|
|
No Action Taken |
No Action Taken |
and possible their possible removal for serious safety and health violations that go uncorrected. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Safety and health management systems for subcontractors. Continue working with subcontractors and |
|
|
|
|
No Action Taken |
No Action Taken |
encourage and support the development and operation of their own effective safety and health |
|
|
|
|
management systems. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage III -- Worksite Analysis |
Worksite Analysis - Required Actions |
Participant Status |
Administrator Status |
1. Baseline survey. Company and subcontractors repeat the baseline survey only if necessitated by |
|
|
|
|
No Action Taken |
No Action Taken |
significant changes (e.g., changes in processes, equipment, hazard controls, etc.). |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Hazard analyses of routine jobs, tasks, and processes. Company and subcontractors continue |
|
|
|
|
No Action Taken |
No Action Taken |
conducting hazard analyses, following guidelines specified in Stage II, to identify, analyze, and control |
|
|
|
|
hazards at the site. Specifically, for this Stage: |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
a. Identify hazards of routine jobs, tasks, and processes and recommend adequate hazard controls |
|
|
|
|
No Action Taken |
No Action Taken |
by conducting task-based or system/process hazard analyses when the routine jobs, tasks, |
|
|
|
|
and processes have written procedures; have been recommended by other studies and |
|
|
|
|
analyses for more in-depth analysis; or are determined by the Challenge participant to warrant |
|
|
|
|
hazard analysis. Follow the guidelines established in Stage II. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Hazard analysis of significant changes. Company and subcontractors continue to identify and |
|
|
|
|
No Action Taken |
No Action Taken |
document safety and health hazards of significant changes, including but not limited to non-routine tasks |
|
|
|
|
(e.g., performed less than once a year) and new processes, materials, equipment, and facilities to identify |
|
|
|
|
uncontrolled hazards prior to the activity or use and recommend adequate hazard controls. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Pre-use analysis |
|
|
|
a. Company and subcontractors when considering new equipment, chemicals, facilities, or significantly |
|
|
|
|
No Action Taken |
No Action Taken |
different operations or procedures, continue to conduct a pre-use analysis (defined in Stage II) |
|
|
|
|
to review the potential safety and health impact on the workers at a level of detail appropriate |
|
|
|
|
considering the perceived risk and the number of people who may be affected. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Company develops and begins implementing a plan for how to integrate this practice into the |
|
|
|
|
No Action Taken |
No Action Taken |
procurement/design phase to maximize the opportunity for proactive hazard controls and requires |
|
|
|
|
that subcontractors adopt and implement the company or an equivalent plan. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Company and subcontractors take proactive steps to ensure that pre-use analysis continues to be |
|
|
|
|
No Action Taken |
No Action Taken |
integrated into the procurement/design phase. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Industrial hygiene program. Company and subcontractors continue implementing the IH programs to |
|
|
|
|
No Action Taken |
No Action Taken |
identify, analyze, and control health hazards to prevent occupational disease. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Routine self-inspections |
|
|
|
a. Company and subcontractors continue implementing the documented system for routinely |
|
|
|
|
No Action Taken |
No Action Taken |
scheduled self-inspections of the workplace developed in Stage II. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Company and subcontractors continue conducting self-inspections by designated safety and |
|
|
|
|
No Action Taken |
No Action Taken |
health staff, with the participation of other non-supervisory workers. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
c. Company and subcontractors take proactive steps to ensure that self-inspections are routinely |
|
|
|
|
No Action Taken |
No Action Taken |
conducted and the entire worksite is covered at least weekly. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Hazard-reporting system. Company and subcontractors continue implementing the hazard-reporting system |
|
|
|
|
No Action Taken |
No Action Taken |
and encourage more active reporting. Implement program improvements as needed. |
|
|
|
|
Ensure regular feedback to all workers on the status of hazards reported (e.g., through |
|
|
|
|
meetings, newsletters, e-mail messages, bulletin board postings, Intranet postings, etc.). |
|
|
|
|
Take proactive steps to encourage all workers to freely make suggestions and report hazardous |
|
|
|
|
conditions without fear of retaliation. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
8. Investigation of accidents and near-misses. Company and subcontractors continue investigating |
|
|
|
|
No Action Taken |
No Action Taken |
accidents and near-misses, as needed, following the guidelines specified in Stages I and II. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
9. Trend analysis. Company takes proactive steps to implement systems for trend analysis of company |
|
|
|
|
No Action Taken |
No Action Taken |
and subcontractor safety and health information and to ensure that the process takes place regularly (at least |
|
|
|
|
annually) as scheduled for all types of safety and health information and is used in setting future goals to |
|
|
|
|
address identified trends of accidents, injuries, and illnesses. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage III -- Hazard Prevention and Control |
Hazard Prevention and Control - Required Actions |
Participant Status |
Administrator Status |
1. Certified professional resources. Company and subcontractors continue to provide necessary resources |
|
|
|
|
No Action Taken |
No Action Taken |
such as appropriate use certified safety professionals (CSP), Certified Industrial Hygienists (CIH), and other |
|
|
|
|
professionals and experts as needed based on the risks at the site. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Hazard elimination and control methods. Company and subcontractors continue to proactively identify |
|
|
|
|
No Action Taken |
No Action Taken |
hazards through all means and select options or combinations of options to eliminate or control hazards |
|
|
|
|
using the most appropriate methods or combination of methods, i.e., engineering controls (including |
|
|
|
|
protective safety devices), administrative controls, work practices, and PPE. |
Correct all hazards identified in this and previous stages, including long-term abatement projects, |
|
|
|
|
before graduating from Stage III. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Hazard control programs. Company and subcontractors continue to maintain all hazard control programs |
|
|
|
|
No Action Taken |
No Action Taken |
required by an OSHA standard, complying with all rules, requirements, and guidelines, including an |
|
|
|
|
annual review and training if required. Take proactive steps to establish hazard control programs, if any, |
|
|
|
|
required by new OSHA standards and to modify or update existing programs, as needed. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Hazard correction tracking. Company and subcontractors continue to implement and improve the |
|
|
|
|
No Action Taken |
No Action Taken |
company’s documented hazard tracking system. Take proactive steps to improve the tracking system, |
|
|
|
|
ensure that it is fully implemented, and communicate with all workers throughout the process on the status |
|
|
|
|
of specific hazards identified until they are totally abated. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Preventive maintenance of equipment. Company and subcontractors continue to implement the |
|
|
|
|
No Action Taken |
No Action Taken |
preventive maintenance schedule on equipment to prevent any hazardous conditions. Take proactive steps |
|
|
|
|
to ensure that the company and subcontractors have an established, routinely-observed preventive |
|
|
|
|
maintenance schedule and that preventive maintenance is automatically part of future systems. |
|
|
|
|
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
6. Occupational health care program. Company and subcontractors take proactive steps to continue |
|
|
|
|
|
|
|
providing effective occupational health care programs, including: |
|
|
|
a. Provisions for access to or availability of certified health care professionals, needed |
|
|
|
|
No Action Taken |
No Action Taken |
health services, and emergency physician and medical care; improve the program based |
|
|
|
|
on all available safety and health information. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
b. Expand use of licensed health care providers to include site visits to help identify causes |
|
|
|
|
No Action Taken |
No Action Taken |
and symptoms of occupational injuries and illnesses. Ensure care provided is within the scope |
|
|
|
|
schedule of licensure and standard operating procedures. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
7. Emergency preparedness and response. Company and subcontractors continue to improve, communicate, |
|
|
|
|
No Action Taken |
No Action Taken |
and implement the written procedures for responding during all shifts to all types of emergencies. |
|
|
|
|
Review the results of previous drills and conduct and evaluate, at a minimum, an annual drill. Ensure that |
|
|
|
|
there is at least one fully operational emergency response team in every shift. Encourage use of AEDs, as |
|
|
|
|
appropriate, and training on their use. Take proactive steps to ensure full implementation and |
|
|
|
|
automatic tracking of the site’s emergency preparedness and response program and procedures. Establish |
|
|
|
|
a HAZMAT Team if necessary and consult with local fire department to ensure adequate coverage for |
|
|
|
|
fire, explosion, or chemical release. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage III -- Safety and Health Training |
Safety and Health Training - Required Actions |
Participant Status |
Administrator Status |
1. Company and subcontractors continue to provide training to all workers following the general |
|
|
|
|
No Action Taken |
No Action Taken |
guidelines specified in Stage I. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Company and subcontractors take proactive steps to improve and continue providing training on |
|
|
|
|
No Action Taken |
No Action Taken |
specific topics, as needed. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Company and subcontractors provide training for workers on how to recognize and control hazardous |
|
|
|
|
No Action Taken |
No Action Taken |
conditions and the signs and symptoms of workplace-related illnesses and injuries. |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
Stage III -- Documentation |
Documentation |
Participant Status |
Administrator Status |
1. All documentation from Stages I and II completed and updated |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
2. Hazard analysis form showing analysis of non-routine tasks or significant changes |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
3. Pre-use analysis forms and results |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
4. Annual self-evaluation of the company’s safety and health management program |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |
5. Follow up Safety and Health Perception Survey and results |
No Action Taken |
No Action Taken |
Participant Goal: |
Date Completed: |
|
|
Participant Actions Taken: |
Administrator Narrative: |