NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR part 63, subpart MMMMM) (Renewal)

ICR 201508-2060-007

OMB: 2060-0516

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2015-09-10
Supporting Statement A
2015-08-28
IC Document Collections
ICR Details
2060-0516 201508-2060-007
Historical Active 201206-2060-008
EPA/OAR 2027.06
NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR part 63, subpart MMMMM) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/14/2016
Retrieve Notice of Action (NOA) 09/16/2015
  Inventory as of this Action Requested Previously Approved
03/31/2019 36 Months From Approved 03/31/2016
209 0 173
18,900 0 15,601
29,500 0 2,671

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the General Provisions specified at 40 CFR part 63, subpart MMMMM. Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

US Code: 44 USC 3501 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  79 FR 30117 05/27/2014
80 FR 55355 09/15/2015
No

1
IC Title Form No. Form Name
NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR Part 63, Subpart MMMMM)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 209 173 0 0 36 0
Annual Time Burden (Hours) 18,900 15,601 0 0 3,299 0
Annual Cost Burden (Dollars) 29,500 2,671 0 0 26,829 0
No
No
There is an increase in the total estimated respondent burden as currently identified in the OMB Inventory of Approved Burdens. This burden increase is due to adjustments EPA has made to account for industry growth that has occurred since the ICR was last approved. There is an increase in the total annual O&M cost as compared to the previous ICR. The previous ICR's estimate only reflected those costs associated with new sources. The resulting omission of O&M costs also incurred by existing sources resulted in a significant underestimation of the total cost; therefore, EPA has both reconciled the noted discrepancy and increased the total annual O&M cost accordingly.

$101,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/16/2015