Overview

# Respondents
# Responses
Respondent Burden
Agency Burden
Capital & O&M


Sheet 1: # Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents





(E=A+B+C-D)
1 1 15 0 0 16
2 1 16 0 0 17
3 1 17 0 0 18
Average 1 16 0 0 17
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.

Sheet 2: # Responses

Total Annual Responses

(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D

ERG Notes:
Initial notification 1 1 0 1

Application for construction/reconstruction 1 1 0 1

Notification of performance test 1 1 0 1

Notification of compliance status 1 1 0 1

Initial compliance report





Loop slitter sources 0 1 0 0

Flame lamination sources 1 1 0 1

Subsequent compliance reports





Loop slitter sources 0 1 0 0

Flame lamination sources 17 2 0 34

SSM report 17 10 0 170




Total 209
-prev renewal: 173 responses, 90 hrs/response. Net increase due to industry growth.



hrs/response: 90.4


Sheet 3: Respondent Burden

Table 1: Annual Respondent Burden and Cost – NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR Part 63, Subpart MMMMM) (Renewal)








Source Type No.




Labor Rates: $103.97 $129.93 $51.79

Existing 16
Burden item A B C D E F G H
New 1
Person-hours
per occurrence
Annual occurrences
per respondent
Person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours per
year (CxD)
Management hours per year (Ex0.05) Clerical hours
per year
(Ex0.10)
Annual cost
($) b

ERG Notes: 17
1. Familiarization with rule requirements 4 1 4 1 4 0.2 0.4 462.58


2. Gather information 4 1 4 17 68 3.4 6.8 7,863.89


3. Reports










a. Initial notification 2 1 2 1 2 0.1 0.2 231.29


b. Application for construction/reconstruction 2 1 2 1 2 0.1 0.2 231.29


c. Notification of performance test 2 1 2 1 2 0.1 0.2 231.29


d. Notification of compliance status 20 1 20 1 20 1 2 2,312.91


e. Initial compliance report










i. Flame lamination facilities 8 1 8 1 8 0.4 0.8 925.16


ii. Loop slitter facilities 8 1 8 0 0 0 0 0


f. Annual compliance report c 2 1 2 0 0 0 0 0


g. Semiannual compliance report 4 2 8 17 136 6.8 13.6 15,727.79


h. SSM report d 2 10 20 17 340 17 34 39,319.47


Reporting Subtotal



669 67,306


3. Recordkeeping requirements










a. Plan activities 10 1 10 1 10 0.5 1 1,156.46


b. Implement activities for flame lamination










i. Record SSM 1 100 100 17 1,700 85 170 196,597.35


ii. Conduct performance test e 50 1 50 1 50 2.5 5 5,782.28


iii. Record CPMS measurements 2 300 600 17 10,200 510 1,020 1,179,584.1


iv. CPMS calibration and maintenance f 4 50 200 17 3,400 170 340 393,194.7


c. Implement activities for loop slitters










i. Record adhesives used and suppliers 1 1 1 0 0 0 0 0


ii. Conduct Method 311 test 4 1 4 0 0 0 0 0


d. Develop record system










i. SSM plan 40 1 40 1 40 2 4 4,625.82


ii. CPMS maintenance plan 20 1 20 1 20 1 2 2,312.91


e. Time to train personnel










i. CPMS acquisition and installation 20 1 20 1 20 1 2 2,312.91


ii. CPMS inspection and monitoring 4 1 4 1 4 0.2 0.4 462.58


f. Store, file, and maintain all records g 1 12 12 17 204 10.2 20.4 23,591.68


g. Retrieve records/reports h 1 12 12 17 204 10.2 20.4 23,591.68


Recordkeeping Subtotal



18,229 1,833,212


TOTAL ANNUAL BURDEN AND COST (ROUNDED)



18,900 1,900,000
Prev renewal: 15,601 hrs and $1,494,882. Net increase due to industry growth.
TOTAL ANNUAL CAPITAL AND O&M COST (SEE SECTION 6(b)(iii))






29,500


GRAND TOTAL (LABOR, CAPITAL, AND O&M)






1,930,000


CPMS - Continuous Parameter Monitoring System










SSM - Startup, Malfunction, or Startup






















Assumptions:










a EPA estimates an average of 16 existing sources will be subject to the standard. One additional new source (flame lamination) will become subject to the rule over the three-year period of this ICR.


b This ICR uses the following labor rates: $103.97 (technical), $129.93 (managerial), and $51.79 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c Applies to loop slitter adhseive facilities only.


d EPA assumes each respondent will submit SSM reports ten times per year.


e EPA assumes this activity also includes writing the site-specific test plan.


f EPA assumes each respondent will implement CPMS calibration and maintenance activities 50 times per year.


g EPA assumes each respondent will file and maintain records on a monthly basis.


h EPA assumes each respondent will retrieve records/reports 12 times per year.



Sheet 4: Agency Burden

Table 2: Average Annual EPA Burden and Cost – NESHAP for Flexible Polyurethane Foam Fabrication (40 CFR Part 63, Subpart MMMMM) (Renewal)
























Labor Rates: $46.67 $62.90 $25.25


Burden item A B C D E F G H

EPA
person-hours
per occurrence
Annual occurrences
per respondent
EPA
person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours
per year
(CxD)
Management
hours per year
(Ex0.05)
Clerical hours
per year
(Ex0.10)
Annual cost
($) b

ERG Notes:
Review initial notification 4 1 4 1 4 0.2 0.4 209.36

Review application for construction/reconstruction 4 1 4 1 4 0.2 0.4 209.36

Review notification of performance test 4 1 4 1 4 0.2 0.4 209.36

Review notification of compliance status 20 1 20 1 20 1 2 1,046.8

Review initial compliance report









Flame lamination facilities 20 1 20 1 20 1 2 1,046.8

Loop slitter facilities 2 1 2 0 0 0 0 0

Review annual compliance report c 1 1 1 0 0 0 0 0

Review semiannual compliance report 15 2 30 17 510 25.5 51 26,693.4

Review SSM report 8 10 80 17 1,360 68 136 71,182.4

TOTAL ANNUAL BURDEN AND COST (ROUNDED) 2,210 101,000
Prev renewal: 1,831 hrs and $82,501. Net increase due to industry growth.











Assumptions:









a EPA estimates an average of 16 existing sources will be subject to the standard. One additional new source (flame lamination) will become subject to the rule over the three-year period of this ICR.

b This ICR uses the following labor rates: $46.67 (technical), $62.90 (managerial), and $25.25 (clerical). These rates are from the Office of Personnel Management (OPM), 2014 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.

c Applies to loop slitter adhesive facilities only.


Sheet 5: Capital & O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A) (B) (C) (D) (E) (F) (G)
Requirement Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) b Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M, (E X F) ERG Notes
Differential pressure, pH, liquid flow rate, data recorder $997 1 $997 $1,674 17 $28,458
Total

$997

$28,500 Prev renewal: Cap/Startup = $997; O&M = $1,674