Supporting Statement A
2015-09-16
Supplementary Document
2015-09-16
Supplementary Document
2015-09-16
Supplementary Document
2015-05-28
Supplementary Document
2015-05-28
Supplementary Document
2015-05-28
Supplementary Document
2015-05-28
IC Document Collections
ICR Details
2130-0611 201509-2130-007
Historical Active 201505-2130-002
DOT/FRA
FRA Emergency Order No. 31, Notice No. 1
Revision of a currently approved collection   No
Regular
Approved without change 12/21/2015
Retrieve Notice of Action (NOA) 10/30/2015
  Inventory as of this Action Requested Previously Approved
12/31/2018 36 Months From Approved 12/31/2015
195 0 195
287 0 242
13,213 0 10,416

FRA has determined that public safety compels issuance of this Emergency Order requiring the National Railroad Passenger Corporation (Amtrak) take actions to control passenger train speed at certain locations on main line track in the Northeast Rail Corridor (NEC) (as defined by 49 U.S.C. 24905(c)(1)(A)). Amtrak must immediately implement code changes to its Automatic Train Control (ATC) System to enforce the passenger train speed limit ahead of the curve at Frankford Junction in Philadelphia, PA where a fatal accident occurred on May 12, 2015, and must also develop a written action plan and post speed signs along the NEC to maintain rail safety. Amtrak must notify FRA upon completion of the installation of those signs.

US Code: 49 USC 20103 Name of Law: Federal Railroad Safety Act of 1970
  
None

Not associated with rulemaking

  80 FR 35712 06/22/2015
80 FR 55711 09/16/2015
No

1
IC Title Form No. Form Name
FRA Emergency Order No. 31, Notice No. 1

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 195 195 0 0 0 0
Annual Time Burden (Hours) 287 242 0 0 45 0
Annual Cost Burden (Dollars) 13,213 10,416 0 0 2,797 0
No
No
This submission is a request for an extension with change and regular Clearance for this information collection previously approved under Emergency Processing procedures. FRA is requesting a total burden of 287 hours and 195 responses. There is one (1) adjustment at this time. The table provided in the answer to question number 15 of the attached Supporitng Justification shows this change in estimate. Total adjustment(s) shown in the provided table increased the burden by 45 hours. There is no change in the number of responses. The current OMB inventory shows a total burden of 242 hours and a total of 195 responses for this information collection, while the present submission exhibits a total burden of 287 hours and 195 responses. Hence, there is an increase in burden of 45 hours, but no change in the number of responses. The cost to respondents has increased by $2,797. The increase in cost is due to an adjustment. Specifically, under Item number 5 of the Emergency Order pertaining to the installation of NEC wayside signs, FRA revised the amount of time that it would take to install these signs from 15.4839 minutes to 30 minutes. This increase in time estimate raised the cost for sign installation from $2,976 to $5,773. Hence, the increase in cost amounts to $2,797.

$0
No
No
No
No
No
Uncollected
David Blackmore 312 835-3903 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/30/2015


© 2024 OMB.report | Privacy Policy