Schedule
of Amounts for Contract Payments
U.S.
Department of Housing
OMB
Approval No. 2577-0157
(Exp.
1/31/2017)
and
Urban Development
Office
of Public and Indian Housing
No
progress payments shall be made to the contractor unless a schedule
of amounts for contract payments in accordance with the construction
contract is received.
Public
reporting burden for this collection of information is estimated to
average 1 hour per response, including the time for reviewing
instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the
collection of information. This agency may not conduct or sponsor,
and a person is not required to respond to, a collection of
information unless that collecton displays a valid OMB control
number.
Construction
practices and HUD administrative requirements establish the need
that HAs maintain certain records or submit certain documents in
conjunction with the oversight of the award of construction
contracts for the construction of new low-income housing
developments or modernization of existing developments. These forms
are used by HAs to provide information on the construction progress
schedule and schedule of amounts for contract payments. Responses to
the collection of information are required to obtain a benefit or to
retain a benefit. The information requested does not lend itself to
confidentiality.
Project
Name and Location
Project
Number
Name,
Address, and Zip Code of Contractor
Nature
of Contract
Contract
Number
Item
No.
Description
of Item
Quantity
Unit
of
Measure
Unit
Price
in
Place
Amount
of
Sub-Item
Amount
of
Principal
Item
(7)
(1)
(2)
(3)
(4)
(5)
(6)
Total
Amount of Contract or Carried Forward
$
To
the best of my knowledge, all the information stated herein, as well
as any information provided in the accompaniment herewith, is true
and accurate. Warning:
HUD
will prosecute false claims and statements. Conviction may result in
criminal and/or civil penalties. (18 U.S.C. 1001, 1010, 1012; 31
U.S.C. 3729, 3802)
Signature
of authorized represenative
Date
signed (mm/dd/yyyy)
Previous
editions are obsolete
Page
1 of
form
HUD-51000
(1/2014
Approved
for Contractor by
Title
Date
(mm/dd/yyyy)
Approved
for Architect by
Title
Date
(mm/dd/yyyy)
Approved
for Owner by
Title
Date
(mm/dd/yyyy)
Instructions
for Preparation of form HUD-51000
d.
Column
4. Enter
the appropriate unit of measure for each sub-
1.
A separate breakdown is required for each project and prime contract
instructions for preparation are given below.
item
of work opposite the quantities described in column 3, such as “sq.
ft.,” “
cu.
yd.,” “tons,” “lb.,” “lumber per
M/BM,” “brickwork
a.
Heading.
Enter
all identifying information required for both
per
M,” etc., applicable to the particular sub-item. Items shown
on “lump sum” or equivalent basis will be paid for only
on completion of the whole item and not on a percentage of
completion basis.
forms.
b.
Columns
1 and 2. In
column 1, enter the item numbers starting
with
No. 1, and in column 2 enter each principal division of work
incorporated in the contract work.
e.
Column
5. Enter
the unit price, in place, of each sub-item of
(1)
Master
List. The
Master list contains the basic items into
work.
which
any construction contract may be subdivided for the purpose of
preparing the Construction Progress Schedule and the Periodical
Estimates for Partial Payments. Only those items shall be selected
which apply to the particular contract. To ensure uniformity, no
change shall be made in the item numbers. Generally, about 25 to 40
major items appear in a contract.
f.
Column
6. Enter
the amount of each sub-item obtained by
multiplying
the quantities in column 3 by the corresponding unit prices in
column 5.
g.
Column
7. Enter
the amount of principal item only, obtained by
adding
the amounts of all sub-items of each principal division of work
listed in column 6. Continue with the breakdown on form HUD-51000.
(2)
Items
Subdivided. In
the Contractor's breakdown, against
h.
The “Schedule of Amounts for Contract Payments” shall be
which
all periodical estimates will be checked prior to pay-ment, each
major item must be subdivided into sub-items pertinent to the
project involved and in agreement with the Contractor's intended
basis for requesting monthly payments.
signed
and dated in the space provided at the bottom of each sheet of the
form by the individual who prepared the breakdown for the
Contractor.
c.
Column
3. Enter
the total quantity for each sub-item of each principal division of
work listed in the breakdown.
2.
The minimum number of copies required for each submission for
approval
is an original and two copies. When approved, one fully approved
copy will be returned to the Contractor.
Master
List of Items
Item
No. Division of Work
Item
No. Division of Work
Item
No. Division of Work
231
Bond
20
Rough
Carpentry
Site
Improvements
General
Conditions \1
21
Metal
Bucks
44
Retaining
Walls
Demolition
& Clearing
22
Caulking
45
Storm
Sewers
23
Weatherstripping
46
Sanitary
Sewers
Structures
24
Lath
& Plastering-Drywall
47
Water
Distribution System Gas Distribution System Electrical Distribution
System Street & Yard Lighting Fire & Police Alarm System
Fire Protection System Street Work Yard
Work (Other) (Other)
1111111111
General
Excavation
25
Stucco
48
Footing
Excavation
26
Finish
Carpentry
49
Backfill
27
Finish
Hardware
50
Foundation
Piles & Caissons Concrete Foundations Concrete Superstructures
28
Glass
& Glazing
51
29
Metal
Doors
52
30
Metal
Base & Trim
53
2301
Reinforcing
Steel
31
Toilet
Partitions
54
Waterproofing
& Dampproofing Spandrel Waterproofing Structural Steel Masonry
32
Floors
55
33
Painting
& Decorating
56
34
Screens
35
Plumbing
Equipment
Stonework
36
Heating
57
Shades
& Drapery Rods
Miscellaneous
& Ornamental Metal
37
Ventilating
System
58
Ranges
Metal
Windows
38
Electrical
59
Refrigerators
Roofing
39
Elevators
60
Kitchen
Cabinets & Work Tables Laundry Equipment (Other)
Sheet
Metal
40
Elevator
Enclosures—Metal Incinerators—Masonry & Parts
(Other) (Other)
61
41
62
42
43
63
Punch
List \2
64
Lawns
& Planting
1
General Conditions should be 3% to 5% of contract amount.
2
Punch List should be approximately 1/2 of 1% or $30 per dwelling
unit, whichever is greater.
Previous
editions are obsolete
form
HUD-51000
(1/2014
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Modified | 0000-00-00 |
File Created | 2021-01-24 |