NWPA-830G Annex A to Appendix G

Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste

Annex A to Appendix G FINAL

Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste

OMB: 1901-0260

Document [docx]
Download: docx | pdf

U.S. Department of Energy

Energy Information Administration

Form NWPA-830G (Revised 03/12)

ANNEX A TO APPENDIX G

Standard Remittance Advice For Payment of Fees

OMB No: 1901-0260

(Expires: xx/xx/xxxx )

Burden: 5 Hours


Section 1. Identification Information: Please first read the

instructions on the back.

Section 2. Net Electricity Generated Calculation

1.1

Purchaser Information:


Item

Unit 1

Unit 2

Unit 3

Station Total 1


1.11 Name:____________________________________________

2.1 Unit ID Code:






1.12 Address:__________________________________________

2.2 Gross Thermal Energy Generated (MWh):






1.13 Attention: _________________________________________

2.3 Gross Electricity Generated (MWh):






1.14 City: _________________________

1.15 State: ________________________


1.16 Zip: ___________

2.4a Nuclear Station Use While At Least One

Nuclear Unit Is In Service 2 (MWh):






1.17 Utility ID Number: ____ ____


2.4b Pumped-Storage Hydro Offset 3 (MWh):





1.2

Contact Person:

1.21 Name: ___________________________________________

2.5 Nuclear Station Use While All Nuclear Units Are Out Of Service 2 (MWh):






1.22 Title: __________________________

1.23 Phone No.: ( )( - )

__________________

Ext:_______________

2.6 Net Electricity Generated (MWh)

(Item 2.3 minus (Item 2.4a plus Item 2.4b))





1.3

Station Name: ________________________________________

________________________________________

2.7 Footnote (if any):

1.4

1.5

Standard Contract Identification No: _____________________

Period Covered (MM/DD/YY):

1.51 From: ______ / ______ / ______ To: _____ / _____/ _____

1.52 Date of This Submission: ________ /________ / ________

1.53 Revision Number: ____ ____

1 For a nuclear station with more than one reactor and different ownerships for each reactor, a separate Annex A is

required.

2 Utilities unable to meter individual unit use shall report estimated unit use and shall explain in a footnote how the

unit data were estimated.

3 Complete this item only if DOE has approved a methodology for calculating such offsets.



Section 3. Total Energy Adjustment Factor

3.1

Data Sources: 1. EIA-861;

2. FERC Form No. 1; 3. Other (Specify in attachment)

3.2

Owner's Share Method:

Contractual Share; Prorata Share of Electricity; Fixed Entitlement Share

3.3

Weighted Energy Adjustment Factor

Calculation


Adjustment for Sales to

ultimate Consumer

(ASC)

Adjustment for

Sales for Resale

(ASR)



Weighted Energy

Adj. Factor

(WEAF)

Name of Nuclear

Station Owner(s)

Data

Source

Fraction of Sales

to ultimate Consumer

(FSC)

Sales to ultimate

Consumer Adj. Factor

(SCAF)

Fraction of Sales

for Resale

(FSR)

National average

Adjustment Factor

(NAF)

Owner's Energy

Adjustment Factor

(OEAF)

Owner's

Share

(OS)




<<-----------------------------------------------------------Round Data to 5 Decimal Places ---------------------------------------------------------------------->>

1.



( . x . ) + ( . x . ) = . x . = .

2.



( . x . ) + ( . x . ) = . x . = .

3.



( . x . ) + ( . x . ) = . x . = .

4.



( . x . ) + ( . x . ) = . x . = .

5.



( . x . ) + ( . x . ) = . x . = .

6.



( . x . ) + ( . x . ) = . x . = .

7.



( . x . ) + ( . x . ) = . x . = .

8.



( . x . ) + ( . x . ) = . x . = .

9.



( . x . ) + ( . x . ) = . x . = .

10.



( . x . ) + ( . x . ) = . x . = .

11.



( . x . ) + ( . x . ) = . x . = .

12.



( . x . ) + ( . x . ) = . x . = .

3.4


Total Energy Adjustment Factor (TEAF = WEAF) Round to 4 Decimal Places ------>

.



Section 4. Fee Calculation for Electricity Generated and Sold (Complete Items After 4.2 Only When Fee Rate Is Greater Than Zero)



Item

Unit 1

Unit 2

Unit 3

Station Total 1

4.1

Total Energy Adjustment Factor (Enter value from Item 3.4 above):





4.2

Electricity Generated and Sold (Items in 4.1 times Items in 2.6):





----

Current Fee Rate (enter current rate in dollars per magawatt-hour):






4.3

Current Fee Due (Whole Dollars): (Transfer Station Total to line 3.4 of Appendix G)





File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorUSCX
File Modified0000-00-00
File Created2021-01-24

© 2024 OMB.report | Privacy Policy