The affected entities are subject to
the General Provisions of the NSPS at 40 CFR part 60, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 60, subpart E. Owners or operators of the affected facilities
must submit initial notification, performance tests, and periodic
reports and results. Owners or operators are also required to
maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports, at a minimum, are required semiannually.
There is an adjustment increase
in the total estimated labor hours. This increase is not due to any
program changes. The change occurred due to this ICR assuming all
existing respondents must re-familiarize themselves with the
regulatory requirements each year.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.