Table 1: Annual Respondent Burden and Cost – NSPS for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC) (Renewal) | |||||||||||
108.28 | 144.33 | 53.34 | |||||||||
Burden item | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||
Person hours per occurrence | No. of occurrences per respondent per year | Person hours per respondent per year (C=AxB) | Respondents per year a | Technical person- hours per year (E=CxD) | Management person hours per year (F=Ex0.05) |
Clerical person hours per year (G=Ex0.1) |
Total Cost per year b | ||||
1. Applications | N/A | ||||||||||
2. Survey and Studies | N/A | ||||||||||
3. Reporting Requirements | |||||||||||
A. Familiarization with rule requirements c | 1 | 1 | 1 | 41 | 41 | 2.05 | 4.1 | $4,954.05 | |||
B. Required Activities | |||||||||||
Initial performance test d | 160 | 1 | 160 | 0 | 0 | 0 | 0 | $0 | |||
Repeat of performance test e | 160 | 0.2 | 32 | 0 | 0 | 0 | 0 | $0 | |||
C. Create Information | See 3B | ||||||||||
D. Gather existing information | See 3B | ||||||||||
E. Write report | |||||||||||
Notification of construction/ reconstruction or modification | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of actual startup f | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of demonstration of CMS | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of physical or operation change g | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Notification of initial performance test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
Performance test report | See 3B | ||||||||||
Demonstration of CMS | See 3B | ||||||||||
Request for alternative CMS | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
Routine maintenance report h | 2 | 1 | 2 | 21 | 42 | 2.1 | 4.2 | $5,074.88 | |||
Semiannual report | 8 | 2 | 16 | 41 | 656 | 32.8 | 65.6 | $79,264.81 | |||
Subtotal for Reporting Requirements | 850 | $89,294 | |||||||||
4. Recordkeeping requirements | |||||||||||
A. Familiarization with rule requirements | See 3A | ||||||||||
B. Plan activities | See 3B | ||||||||||
C. Implement activities | See 3B | ||||||||||
D. Develop record system | N/A | ||||||||||
E. Time to enter information | See 3E | ||||||||||
F. Train personnel | N/A | ||||||||||
G. Audits | N/A | ||||||||||
Subtotal for Recordkeeping Requirements | 0 | $0 | responses | hr/response | |||||||
TOTAL LABOR BURDEN AND COST (rounded) i | 850 | $89,300 | 103 | 8.25242718446602 | |||||||
TOTAL CAPITAL AND O&M COST (rounded) i | $238,000 | ||||||||||
GRAND TOTAL (rounded) i | $327,000 | ||||||||||
Assumptions: | |||||||||||
a We have assumed that the number of existing respondents is 41, and that no additional new sources will become subject to the rule over the three-year period of this ICR. | |||||||||||
b This ICR uses the following labor rates: $144.33 per hour for Executive, Administrative, and Managerial labor; $108.28 per hour for Technical labor, and $53.34 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2016, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. | |||||||||||
c We have assumed that it will take one hour for all existing respondents to familiarize with regulatory requirements. | |||||||||||
d We have assumed that it will take 160 hours to complete a performance test. | |||||||||||
e We have assumed that 20 percent will fail the performance tests. | |||||||||||
f We have assumed that it will take two hours to write notification of actual startup report. | |||||||||||
g We have assumed that it will take two hours to write notification report of physical or operation change. | |||||||||||
h We have assumed that 50 percent of respondents will submit routine maintenance reports. | |||||||||||
i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NSPS for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC) (Renewal) | ||||||||
48.08 | 64.8 | 26.02 | ||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) |
EPA person-hours per occurrence | No. of occurrences per plant per year | EPA person hours per plant per year (C=AxB) |
Plants per year a | Technical person-hours per year (E=CxD) |
Management person-hours per year (F=Ex0.05) | Clerical person-hours per year (G=Ex0.1) | Cost, $ b | |
Initial performance tests | ||||||||
New or modified facility c | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 |
Repeat performance test | ||||||||
New or modified facility c, d | 40 | 0.2 | 8 | 0 | 0 | 0 | 0 | $0 |
Report review | ||||||||
New or Modified Facility | ||||||||
Modification of construction/ reconstruction or modification e | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 |
Notification of actual startup f | 0.5 | 1 | 0.5 | 0 | 0 | 0 | 0 | $0 |
Notification of demonstration of CMS f | 0.5 | 1 | 0.5 | 0 | 0 | 0 | 0 | $0 |
Notification of physical or operational change f | 0.5 | 1 | 0.5 | 0 | 0 | 0 | 0 | $0 |
Notification of initial performance test f | 0.5 | 1.2 | 0.6 | 0 | 0 | 0 | 0 | $0 |
Review of performance test results g | 8 | 1.2 | 9.6 | 0 | 0 | 0 | 0 | $0 |
Review demonstration of CMS | See "Review of performance test results" | |||||||
Review request for alternative CMS | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 |
Review of routine maintenance report h | 2 | 1 | 2 | 21 | 42 | 2.1 | 4.2 | $2,264.72 |
Review of semiannual reports | 4 | 2 | 8 | 41 | 328 | 16.4 | 32.8 | $17,686.42 |
TOTAL LABOR BURDEN AND COST (rounded) i | 426 | $20,000 | ||||||
Assumptions: | ||||||||
a We have assumed that the average number of existing respondents is 41, and that no additional new sources will become subject to the rule over the three-year period of this ICR. | ||||||||
b This cost is based on the following hourly labor rates times a 1.6 benefits multiplication factor to account for government overhead expenses: $64.80 for Managerial, $48.08 for Technical, and $26.02 for Clerical. These rates are from the Office of Personnel Management (OPM) “2017 General Schedule” which excludes locality rates of pay. | ||||||||
c We have assumed that it will take 40 hours to participate with the performance tests. | ||||||||
d We have assumed that 20 percent of respondents will repeat performance tests because of failure. | ||||||||
e We have assumed that it will take two hours to review construction report. | ||||||||
f It will take each respondent 0.5 hours to review actual startup report, CMS report, physical or operational change report, and initial performance test report. | ||||||||
g We have assumed that it will take eight hours to review performance test results. | ||||||||
h We have assumed that 50 percent of respondents will submit routine maintenance reports. | ||||||||
i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |