NSPS for Glass Manufacturing Plants (40 CFR Part, 60 Subpart CC) (Renewal)

ICR 202107-2060-004

OMB: 2060-0054

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2021-07-01
Supporting Statement A
2021-07-01
IC Document Collections
ICR Details
2060-0054 202107-2060-004
Received in OIRA 201803-2060-003
EPA/OAR 1131.13
NSPS for Glass Manufacturing Plants (40 CFR Part, 60 Subpart CC) (Renewal)
Extension without change of a currently approved collection   No
Regular 07/01/2021
  Requested Previously Approved
36 Months From Approved 08/31/2021
103 103
850 850
238,000 238,000

The New Source Performance Standards (NSPS) for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC) were proposed on June 15, 1979, promulgated on October 7, 1980, and amended on both October 19, 1984 and October 17, 2000. These regulations apply to both existing and new glass melting furnaces located at glass manufacturing plants. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. Owners and operators of affected facilities are required to comply with reporting and recordkeeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as the specific requirements at 40 CFR Part 60, Subpart CC. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with these standards.

US Code: 42 USC 7601 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  85 FR 28003 05/12/2020
86 FR 35086 07/01/2021
No

1
IC Title Form No. Form Name
NSPS for Glass Manufacturing Plants (40 CFR Part 60 Subpart CC) (Renewal)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 103 103 0 0 0 0
Annual Time Burden (Hours) 850 850 0 0 0 0
Annual Cost Burden (Dollars) 238,000 238,000 0 0 0 0
No
No

$21,000
No
    No
    No
No
No
No
No
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/01/2021


© 2024 OMB.report | Privacy Policy