In accordance
with 5 CFR 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
08/31/2021
36 Months From Approved
08/31/2018
103
0
103
850
0
850
238,000
0
238,000
The New Source Performance Standards
(NSPS) for Glass Manufacturing Plants (40 CFR Part 60, Subpart CC)
were proposed on June 15, 1979, promulgated on October 7, 1980, and
amended on both October 19, 1984 and October 17, 2000. These
regulations apply to both existing and new glass melting furnaces
located at glass manufacturing plants. New facilities include those
that commenced construction, modification, or reconstruction after
the date of proposal. Owners and operators of affected facilities
are required to comply with reporting and recordkeeping
requirements for the General Provisions (40 CFR Part 60, Subpart
A), as well as the specific requirements at 40 CFR Part 60, Subpart
CC. This includes submitting initial notifications, performance
tests and periodic reports and results, and maintaining records of
the occurrence and duration of any startup, shutdown, or
malfunction in the operation of an affected facility, or any period
during which the monitoring system is inoperative. These reports
are used by EPA to determine compliance with these
standards.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.