Information Collection Request

Application for Permit to Modify(APM) and supporting documentation

ICR 201905-1014-008 · OMB 1014-0026 · Historical Active

Forms and Documents

Forms and supporting documents for this ICR
DocumentTypeStatusAvailability
0026-SS-WCR-APMs.docx Supporting Statement A Uploaded 2019-05-03 Available
1014-AA39 Published PR [83 FR 22128] exp. 7-10-18.pdf Supplementary Document Uploaded 2018-12-03 Available

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
234264 250.750(a)(4) - Operations w/out down-hole check valves Unchanged
225532 250.1743(a) - Signed Certification Unchanged
225531 250.1723(b) - Request Removal Unchanged
225530 250.1722(a), (d) - Report Removed
225529 250.1722(a), (d) - Approval Unchanged
225528 250.1721; 1704(g) - Application to Temp. Abandon Unchanged
225526 250.1712; 1704(g) - Permanently Plugging - Descriptions Unchanged
225525 250.1712; 1704(g) - Permanently Plugging - Certification Unchanged
225524 250.1706(a)(4) - Downhole Check Valves Removed
225523 250.1704(g) - Final Well Schematic Unchanged
225522 250.1704 - Well Abandonment Unchanged
225521 250.1622(c)(2) - Well Tests Results (Sulfur) Unchanged
225520 250.1622(a), (b) - Approval for Operations (Sulfur) Unchanged
225517 250.1619(b) - Suspension/Temporary Prohibition (Sulfur) Unchanged
225516 250.1618(a), (b), (c) - Changes to Plans (Sulfur) Unchanged
225515 250.804(a) - SSSVs Unchanged
225513 250.801(h) - Safety Device Unchanged
225512 250.738(n) - Pipe/Variable Bore Rams Unchanged
225511 250.738(m) - BAVO report Unchanged
225510 250.737(d)(12) - Autoshear/Deadman event Unchanged
225509 250.737(d)(4) - Initial Subsea BOP Unchanged
225508 250.737(d)(3) - Stump Test Unchanged
225507 250.737(d)(2) - Initial Test Unchanged
225506 250.733 - Annulus Monitoring Plan Unchanged
225505 250.731 - BOP System Unchanged
225504 250.724(b) - Real-Time Monitoring Plan Removed
225503 250.721(g) - Successful Negative Pressure Test Unchanged
225496 250.720(b) - Displace Kill Weight Fluid Unchanged
225495 250.713 - MODU Unchanged
225494 250.702 - Identify Departures Unchanged
225493 250.701 - Proposed Alternate Procedures Unchanged
225492 250.619(f) - Production Packer Setting Depth Unchanged
225491 250.616(a)(4) - Downhole Check Valves Removed
225490 250.613(d) - Work as Performed Unchanged
225489 250.613(c) - New Zone Unchanged
225488 250.613(a), (b) - Other than Normal Workover Unchanged
225487 250.526(a) - Corrective Action Unchanged
225486 250.518(f) - Production Packer Setting Depth Unchanged
225485 250.513 - Well-Completion Operations Unchanged
225484 250.471(c) - SCCE Unchanged
225483 250.300(b)(1), (2) - Petroleum-based substance Unchanged
225481 Subparts D, E, F, G, H, P, Q - Revised APM Application Unchanged
225480 Subparts D, E, F, G, H, P, Q - APM Application Other-Screen Shots Unchanged

ICR Details

Reginfo record details
table that charts list comparision
  Inventory as of this Action Requested Previously Approved
07/31/2020 36 Months From Approved 07/31/2020
12,252 0 12,333
17,353 0 17,386
6,446,500 0 308,500





Reginfo record details
39
table that charts list of burden
IC Title Form No. Form Name
250.1619(b) - Suspension/Temporary Prohibition (Sulfur)
Subparts D, E, F, G, H, P, Q - APM Application BSEE-0124 Application for Permit to Modify
250.300(b)(1), (2) - Petroleum-based substance
250.518(f) - Production Packer Setting Depth
250.613(a), (b) - Other than Normal Workover
250.471(c) - SCCE
250.513 - Well-Completion Operations
250.701 - Proposed Alternate Procedures
250.737(d)(2) - Initial Test
250.702 - Identify Departures
250.737(d)(3) - Stump Test
250.737(d)(4) - Initial Subsea BOP
250.738(m) - BAVO report
250.804(a) - SSSVs
250.526(a) - Corrective Action
250.737(d)(12) - Autoshear/Deadman event
250.750(a)(4) - Operations w/out down-hole check valves
250.738(n) - Pipe/Variable Bore Rams
250.1721; 1704(g) - Application to Temp. Abandon
250.1704 - Well Abandonment
250.1723(b) - Request Removal
250.1704(g) - Final Well Schematic
250.801(h) - Safety Device
250.1712; 1704(g) - Permanently Plugging - Certification
250.1618(a), (b), (c) - Changes to Plans (Sulfur)
250.1622(a), (b) - Approval for Operations (Sulfur)
250.1622(c)(2) - Well Tests Results (Sulfur)
250.1712; 1704(g) - Permanently Plugging - Descriptions
250.1722(a), (d) - Approval
250.724(b) - Real-Time Monitoring Plan
250.1743(a) - Signed Certification
250.721(g) - Successful Negative Pressure Test
250.731 - BOP System
250.733 - Annulus Monitoring Plan
Subparts D, E, F, G, H, P, Q - Revised APM Application
250.619(f) - Production Packer Setting Depth
250.613(c) - New Zone
250.613(d) - Work as Performed
250.713 - MODU
250.720(b) - Displace Kill Weight Fluid
250.1706(a)(4) - Downhole Check Valves
250.1722(a), (d) - Report
250.616(a)(4) - Downhole Check Valves

table that charts list of burden
  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 12,252 12,333 0 -19 -62 0
Annual Time Burden (Hours) 17,353 17,386 0 277 -310 0
Annual Cost Burden (Dollars) 6,446,500 308,500 0 6,138,000 0 0


Reginfo record details
  No