Information Collection Request

Application for Permit to Modify(APM) and supporting documentation

ICR 201911-1014-005 · OMB 1014-0026 · Active

Forms and Documents

Forms and supporting documents for this ICR
DocumentTypeStatusAvailability
1014-0026 30-day published 7-7-2020 [85 FR 40676] exp. 8-6-2020.pdf Supplementary Document Uploaded 2020-07-07 Available
1014-0026 30-day published 2-18-20 [85 FR 8890] exp. 4-20-2020.pdf Supplementary Document Uploaded 2020-05-07 Available
eCFR — Code of Federal Regulations.pdf Supplementary Document Uploaded 2020-05-07 Available
1014-0026-SS-APMs 2020 OMB review clean.docx Supporting Statement A Uploaded 2020-10-26 Available

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
241711 250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE New
234264 250.750(a)(4) - Operations w/out down-hole check valves Modified
225532 250.1743(a) - Signed Certification Unchanged
225531 250.1723(b) - Request Removal Unchanged
225529 250.1722(a), (d) - Approval Modified
225528 250.1721; 1704(g) - Application to Temp. Abandon Modified
225526 250.1712; 1704(g) - Permanently Plugging - Descriptions Modified
225525 250.1712; 1704(g) - Permanently Plugging - Certification Modified
225523 250.1704(g) - Final Well Schematic Modified
225522 250.1704 - Well Abandonment Modified
225521 250.1622(c)(2) - Well Tests Results (Sulfur) Modified
225520 250.1622(a), (b) - Approval for Operations (Sulfur) Modified
225517 250.1619(b) - Suspension/Temporary Prohibition (Sulfur) Modified
225516 250.1618(a), (b), (c) - Changes to Plans (Sulfur) Modified
225515 250.804(a) - SSSVs Modified
225513 250.801(h) - Safety Device Modified
225512 250.738(n) - Pipe/Variable Bore Rams Modified
225511 250.738(m) - BAVO report Modified
225510 250.737(d)(12) - Autoshear/Deadman event Modified
225509 250.737(d)(4) - Initial Subsea BOP Modified
225508 250.737(d)(3) - Stump Test Modified
225507 250.737(d)(2) - Initial Test Modified
225506 250.733 - Annulus Monitoring Plan Modified
225505 250.731 - BOP System Modified
225503 250.721(g) - Successful Negative Pressure Test Modified
225496 250.720(b) - Displace Kill Weight Fluid Modified
225495 250.713 - MODU Modified
225494 250.702 - Identify Departures Modified
225493 250.701 - Proposed Alternate Procedures Modified
225492 250.619(f) - Production Packer Setting Depth Modified
225490 250.613(d) - Work as Performed Modified
225489 250.613(c) - New Zone Modified
225488 250.613(a), (b) - Other than Normal Workover Modified
225487 250.526(a) - Corrective Action Modified
225486 250.518(f) - Production Packer Setting Depth Modified
225485 250.513 - Well-Completion Operations Modified
225484 250.471(c) - SCCE Modified
225483 250.300(b)(1), (2) - Petroleum-based substance Modified
225481 Subparts D, E, F, G, H, P, Q - Revised APM Application Modified
225480 Subparts D, E, F, G, H, P, Q - APM Application Other-eWell Screenshots Modified

ICR Details

Reginfo record details
table that charts list comparision
  Inventory as of this Action Requested Previously Approved
10/31/2023 36 Months From Approved 10/31/2020
12,202 0 12,252
17,311 0 17,353
6,451,500 0 6,446,500





Reginfo record details
40
table that charts list of burden
IC Title Form No. Form Name
250.738(n) - Pipe/Variable Bore Rams
250.1721; 1704(g) - Application to Temp. Abandon
250.1723(b) - Request Removal
250.801(h) - Safety Device
250.300(b)(1), (2) - Petroleum-based substance
250.518(f) - Production Packer Setting Depth
250.613(a), (b) - Other than Normal Workover
250.471(c) - SCCE
250.513 - Well-Completion Operations
250.1622(c)(2) - Well Tests Results (Sulfur)
250.1704 - Well Abandonment
250.1704(g) - Final Well Schematic
250.1712; 1704(g) - Permanently Plugging - Certification
250.1712; 1704(g) - Permanently Plugging - Descriptions
250.1722(a), (d) - Approval
250.1743(a) - Signed Certification
250.721(g) - Successful Negative Pressure Test
250.731 - BOP System
250.1618(a), (b), (c) - Changes to Plans (Sulfur)
250.733 - Annulus Monitoring Plan
250.1622(a), (b) - Approval for Operations (Sulfur)
Subparts D, E, F, G, H, P, Q - Revised APM Application
250.702 - Identify Departures
250.1619(b) - Suspension/Temporary Prohibition (Sulfur)
Subparts D, E, F, G, H, P, Q - APM Application BSEE-0124 Applications for Permit to Modify
250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE
250.619(f) - Production Packer Setting Depth
250.613(c) - New Zone
250.613(d) - Work as Performed
250.713 - MODU
250.720(b) - Displace Kill Weight Fluid
250.750(a)(4) - Operations w/out down-hole check valves
250.701 - Proposed Alternate Procedures
250.737(d)(2) - Initial Test
250.804(a) - SSSVs
250.526(a) - Corrective Action
250.737(d)(12) - Autoshear/Deadman event
250.737(d)(3) - Stump Test
250.737(d)(4) - Initial Subsea BOP
250.738(m) - BAVO report

table that charts list of burden
  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 12,202 12,252 0 2 -52 0
Annual Time Burden (Hours) 17,311 17,353 0 10 -52 0
Annual Cost Burden (Dollars) 6,451,500 6,446,500 0 0 5,000 0


Reginfo record details
  No