Information Collection Request

Application for Permit to Modify(APM) and supporting documentation

ICR 202208-1014-006 · OMB 1014-0026 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
1014-0026 30-day FRN 6-16-23 [88 FR 39470] 7-17-23.pdf Supplementary Document Uploaded 2023-06-16 Repair queued
1014-0026 60-day FRN published 8-4-22 [87 FR 47791] exp. 10-3-22.pdf Supplementary Document Uploaded 2023-06-07 Repair queued
30 CFR Part 250 (up to date as of 6-05-2023).pdf Supplementary Document Uploaded 2023-06-07 Repair queued
1014-0026-SS-APMs 2023.docx Supporting Statement A Uploaded 2023-06-07 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
241711 250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE Modified
234264 250.750(a)(4) - Operations w/out down-hole check valves Modified
225532 250.1743(a) - Signed Certification Modified
225531 250.1723(b) - Request Removal Modified
225529 250.1722(a), (d) - Approval Modified
225528 250.1721; 1704(g) - Application to Temp. Abandon Modified
225526 250.1712; 1704(g) - Permanently Plugging - Descriptions Modified
225525 250.1712; 1704(g) - Permanently Plugging - Certification Modified
225523 250.1704(g) - Final Well Schematic Modified
225522 250.1704 - Well Abandonment Modified
225521 250.1622(c)(2) - Well Tests Results (Sulfur) Modified
225520 250.1622(a), (b) - Approval for Operations (Sulfur) Modified
225517 250.1619(b) - Suspension/Temporary Prohibition (Sulfur) Modified
225516 250.1618(a), (b), (c) - Changes to Plans (Sulfur) Modified
225515 250.804(a) - SSSVs Modified
225513 250.801(h) - Safety Device Modified
225512 250.738(n) - Pipe/Variable Bore Rams Modified
225511 250.738(m) - BAVO report Modified
225510 250.737(d)(12) - Autoshear/Deadman event Modified
225509 250.737(d)(4) - Initial Subsea BOP Modified
225508 250.737(d)(3) - Stump Test Modified
225507 250.737(d)(2) - Initial Test Modified
225506 250.733 - Annulus Monitoring Plan Modified
225505 250.731 - BOP System Modified
225503 250.721(g) - Successful Negative Pressure Test Modified
225496 250.720(b) - Displace Kill Weight Fluid Modified
225495 250.713 - MODU Modified
225494 250.702 - Identify Departures Modified
225493 250.701 - Proposed Alternate Procedures Modified
225492 250.619(f) - Production Packer Setting Depth Modified
225490 250.613(d) - Work as Performed Modified
225489 250.613(c) - New Zone Modified
225488 250.613(a), (b) - Other than Normal Workover Modified
225487 250.526(a) - Corrective Action Modified
225486 250.518(f) - Production Packer Setting Depth Modified
225485 250.513 - Well-Completion Operations Modified
225484 250.471(c) - SCCE Modified
225483 250.300(b)(1), (2) - Petroleum-based substance Modified
225481 Subparts D, E, F, G, H, P, Q - Revised APM Application Modified
225480 Subparts D, E, F, G, H, P, Q - APM Application Other-Screen Shots Modified
ICR Details
StatusReceived in OIRA
Agency/SubagencyDOI/BSEE
OMB Control No1014-0026
Type of Information CollectionExtension without change of a currently approved collection
Previous ICR Reference No201911-1014-005
Agency Tracking No1014-0026 APMs Ext '23
Date Submitted to OIRA1969-12-31
Requested Expiration Date1969-12-31