Information Collection Request

Application for Permit to Modify(APM) and supporting documentation

ICR 202607-1014-001 · OMB 1014-0026 · Received in OIRA

Forms and Documents

Forms and supporting documents for this ICR
DocumentTypeStatusAvailability
Form BSEE Form-0124 Application for Permit to Modify (APM) Form and Instruction Modified Available
1014-0026-SS-APMs.9.22.26.docx Supporting Statement A Uploaded 2026-09-22 Available
2026-19291.pdf Supplementary Document Uploaded 2026-09-22 Available
30 CFR Part 250 Subpart Q (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
30 CFR Part 250 Subpart H (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
30 CFR Part 250 Subpart G (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
30 CFR Part 250 Subpart F (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
30 CFR Part 250 Subpart E (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
30 CFR Part 250 Subpart D (up to date as of 8-03-2026).pdf Supplementary Document Uploaded 2026-08-05 Available
2025-23572.pdf Supplementary Document Uploaded 2026-08-05 Available
BSEE-2025-0266-0002 (1).html Public Comments Uploaded 2026-07-23 Available

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
281778 250.1704(h)-Submit with a final well schematic, description, nature and quantities of material used New
281777 250.828(b)-Well must not be open to flow SSSV is inoperable New
281776 250.817(a)-remove a wireline subsurface safety device New
281775 250.813-May submit an APM for approval to equip a dry tree well New
281738 250.732(b) and (c) - Submit independent third party qualifications to BSEE with the associated permit application. New
241711 250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE Removed
234264 250.750(a) - Operations w/out down-hole check valves Modified
225532 250.1743(a) - Signed Certification Modified
225531 250.1723(b) - Request Removal Modified
225529 250.1722(a) - Approval Modified
225528 250.1721; 1704(h) - Application to Temp. Abandon Modified
225526 250.1712; 1704(h) - Permanently Plugging - Descriptions Modified
225525 250.1712; 1704(h) - Permanently Plugging - Certification Modified
225523 250.1704(g) - Final Well Schematic Removed
225522 250.1704 - Well Abandonment Modified
225521 250.1622(c)(2) - Well Tests Results (Sulfur) Removed
225520 250.1622(a), (b) - Approval for Operations (Sulfur) Removed
225517 250.1619(b) - Suspension/Temporary Prohibition (Sulfur) Removed
225516 250.1618(a), (b), (c) - Changes to Plans (Sulfur) Removed
225515 250.804(a) - SSSVs Removed
225513 250.801(h) - Safety Device Removed
225512 250.738(n) - Pipe/Variable Bore Rams Modified
225511 250.738(m) - BAVO report Modified
225510 250.737(d)(12) - Autoshear/Deadman event Modified
225509 250.737(d)(4) - Initial Subsea BOP Modified
225508 250.737(d)(3) - Stump Test Modified
225507 250.737(d)(2) - Initial Test Modified
225506 250.733 - Annulus Monitoring Plan Modified
225505 250.731 - BOP System Modified
225503 250.721(g) - Successful Negative Pressure Test Modified
225496 250.720(b) - Displace Kill Weight Fluid Modified
225495 250.713 - MODU Modified
225494 250.702 - Identify Departures Modified
225493 250.701 - Proposed Alternate Procedures Modified
225492 250.619(f) - Production Packer Setting Depth Modified
225490 250.613(d) - Work as Performed Modified
225489 250.613(c) - New Zone Modified
225488 250.613(a), (b) - Other than Normal Workover Modified
225487 250.526(a) - Corrective Action Modified
225486 250.518(f) - Production Packer Setting Depth Modified
225485 250.513 - Well-Completion Operations Modified
225484 250.471(c) - SCCE Removed
225483 250.300(b)(1), (2) - Petroleum-based substance Removed
225481 Subparts D, E, F, G, H, P, Q - Revised APM Application Modified
225480 Subparts D, E, F, G, H, P, Q - APM Application Form and Instruction ModifiedApplication for Permit to Modify (APM)
225480 Subparts D, E, F, G, H, P, Q - APM Application Other-Screen Shots Modified

ICR Details

Reginfo record details
table that charts list comparision
  Requested Previously Approved
36 Months From Approved 09/30/2026
12,391 11,322
31,472 16,431
5,483,295 6,387,110





Reginfo record details
35
table that charts list of burden
IC Title Form No. Form Name
250.1618(a), (b), (c) - Changes to Plans (Sulfur)
250.1619(b) - Suspension/Temporary Prohibition (Sulfur)
250.1622(a), (b) - Approval for Operations (Sulfur)
250.1622(c)(2) - Well Tests Results (Sulfur)
250.1704 - Well Abandonment
250.1704(g) - Final Well Schematic
250.1704(h)-Submit with a final well schematic, description, nature and quantities of material used
250.1712; 1704(h) - Permanently Plugging - Certification
250.1712; 1704(h) - Permanently Plugging - Descriptions
250.1721; 1704(h) - Application to Temp. Abandon
250.1722(a) - Approval
250.1723(b) - Request Removal
250.1743(a) - Signed Certification
250.300(b)(1), (2) - Petroleum-based substance
250.471(c) - SCCE
250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE
250.513 - Well-Completion Operations
250.518(f) - Production Packer Setting Depth
250.526(a) - Corrective Action
250.613(a), (b) - Other than Normal Workover
250.613(c) - New Zone
250.613(d) - Work as Performed
250.619(f) - Production Packer Setting Depth
250.701 - Proposed Alternate Procedures
250.702 - Identify Departures
250.713 - MODU
250.720(b) - Displace Kill Weight Fluid
250.721(g) - Successful Negative Pressure Test
250.731 - BOP System
250.732(b) and (c) - Submit independent third party qualifications to BSEE with the associated permit application.
250.733 - Annulus Monitoring Plan
250.737(d)(12) - Autoshear/Deadman event
250.737(d)(2) - Initial Test
250.737(d)(3) - Stump Test
250.737(d)(4) - Initial Subsea BOP
250.738(m) - BAVO report
250.738(n) - Pipe/Variable Bore Rams
250.750(a) - Operations w/out down-hole check valves
250.801(h) - Safety Device
250.804(a) - SSSVs
250.813-May submit an APM for approval to equip a dry tree well
250.817(a)-remove a wireline subsurface safety device
250.828(b)-Well must not be open to flow SSSV is inoperable
Subparts D, E, F, G, H, P, Q - APM Application BSEE Form-0124
Subparts D, E, F, G, H, P, Q - Revised APM Application

table that charts list of burden
  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 12,391 11,322 0 1 1,068 0
Annual Time Burden (Hours) 31,472 16,431 0 0 15,041 0
Annual Cost Burden (Dollars) 5,483,295 6,387,110 0 0 -903,815 0


Reginfo record details
  No