Information Collection Request

30 CFR Part 250, Subpart G, Well Operations and Equipment.

ICR 201908-1014-001 · OMB 1014-0028 · Active

Forms and Documents
DocumentTypeStatusAvailability
1014-0028 Published 30 Day Notice - 84 FR 65418.pdf Supplementary Document Uploaded 2019-11-27 Available
1014-0028 60-day published 7-23-19 [84 FR 35418] exp. 9-23-19.pdf Supplementary Document Uploaded 2019-10-01 Repair queued
eCFR - Subpart G.pdf Supplementary Document Uploaded 2019-10-01 Available
BSEE 1014-0028-SS-2019 SM nm clean.docx Supporting Statement A Uploaded 2020-01-31 Available
IC Document Collections
IC IDCollectionTypeStatusForm
234340 250.751 - BOP and coiled tubing tests Unchanged
234339 250.746(f) - Retain pressure tests, actuations, and inspections in daily report Unchanged
234338 250.746 - Casing and liner presser tests Unchanged
234337 250.745 - Varies records of operations Unchanged
234336 250.742 - Core analyses Unchanged
234335 250.742 - Velocity profiles and surveys Unchanged
234334 250.742 - Directional and vertical-well surveys Unchanged
234333 250.742 - Well logging operations Unchanged
234332 250.740; 741; 724(b) - Retain data for 2 years after completion Unchanged
234331 250.740; 741; 724(b) - Drilling records Unchanged
234330 250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info. Unchanged
234329 250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records Unchanged
234328 250.739(b) - ITP report documenting inspection Unchanged
234327 250.739 - meet/exceed API Standard 53 Unchanged
234326 250.738(o) - ITP report re failure of redundant control Unchanged
234325 250.738(m) - ITP report re-equipment design and suitability Unchanged
234324 250.738(k) - Latching up BOP stack/re-establishing power Unchanged
234323 250.738(g) - Demonstrate well-control procedures Unchanged
234322 250.738(f) - BOP configuration changes Unchanged
234321 250.738(i) - ITP report - fit for service Unchanged
234320 250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal Unchanged
234319 250.738; 746(e) - DM Approval - Well control demands above rating pressure Unchanged
234318 250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP Unchanged
234317 250.738; 746(e) - DM Approval - Put well in safe condition Unchanged
234316 250.738; 746(e) - DM Approval - problems, issues, leaks Unchanged
234315 250.738; 746(e) - DM Approval Unchanged
234314 250.737(e) - 72 hour advance notice of location of shearing ram tests Unchanged
234313 250.737(d)(12) - Make available upon request. Unchanged
234312 250.737(d)(12) - Document all autoshear, EDS, and deadman test results Unchanged
234311 250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion Unchanged
234310 250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing Unchanged
234309 250.737(d)(5) - Alternating testing schedule Unchanged
234308 250.737(c); 746(a), (b), (c), (d) - Record time, date, and results Unchanged
234307 250.737(a)(4) (d)(10) - Quarterly reports Unchanged
234306 250.737(a)(4) (d)(10) - 21-day BOP testing frequency Unchanged
234305 250.734(a)(9); 738(n) - Labeling Unchanged
234304 250.734(a)(7) - Additional information / acoustic control system Unchanged
234303 250.734(a)(7) - Acoustic control system Unchanged
234302 250.732(d) - Documentation that demonstrates compliance Unchanged
234301 250.732(c) - Verification that an ITP conducted detailed reviews Unchanged
234300 250.732(a) - Submit ITP verification Unchanged
234299 250.730(d)(1) - Alternate approval from using to API Spec. Q1 Unchanged
234298 250.730(c)(3) - Submit report re design change/modified procedures Unchanged
234297 250.730(c)(2) - Extension Request Unchanged
234296 250.730(c)(2) - Analysis report re equipment failure Unchanged
234295 250.730(c)(1) - Written notice of equipment failure Unchanged
234294 250.730(a)(4) - Schematic drawings Unchanged
234293 250.724(c) - Develop and implement a RTM plan Unchanged
234292 250.724 - Transmit RTM data onshore Unchanged
234291 250.723(d) - Request exceptions prior to moving rig Unchanged
234290 250.722(b)(3) - Pressure test after repairs Unchanged
234289 250.722 - Successful pressure test Unchanged
234288 250.722 - Evaluation results report Unchanged
234287 250.721(g)(6) - failed negative pressure test Unchanged
234286 250.721(g)(5) - Test Results Unchanged
234285 250.721(d), (f), (g) - plans to re-cement, repair, etc. Unchanged
234284 250.720(d) - Intervention Operations Unchanged
234283 250.720(a)(3) - Resuming Operations Unchanged
234282 250.720(a) - Interrupting Operations Unchanged
234281 250.715 - GPS for MODUs - Rent GPS Unchanged
234280 250.715 - GPS for MODUs - Monthly tracking fee Unchanged
234279 250.715 - GPS for MODUs - Install Unchanged
234278 250.715 - GPS for MODUs - tracking/locator data Unchanged
234277 250.714 - Dropped Objects Plan Unchanged
234276 250.713(a), (b) - Foundation Requirements Unchanged
234275 250.713(a), (b) - Fitness Requirements Unchanged
234274 250.712(d) - Construction Repairs/Mods to MODU/Rig Unchanged
234273 250.712(c), (e) - Warm or Cold Stacked Unchanged
234272 250.712(a), (b), (f) - Updated Rig Movement Form Unchanged
234271 250.712(a), (b), (f) - Rig Movement Notification Report Other-eWell Screen Shot Unchanged
234270 250.712(a), (b), (f) - Notify BSEE of Rig Movements Unchanged
234269 250.711(b), (c) - Daily Drill Report Unchanged
234268 250.710(b); 738(p) - Well-Control Drill Plan Unchanged
234267 250.710(a) - Safety Meetings Unchanged
ICR Details
1014-0028 201908-1014-001
Active 201905-1014-009
DOI/BSEE 1014-0028 - Sub G '20
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Extension without change of a currently approved collection   No
Regular
Approved with change 01/31/2020
Retrieve Notice of Action (NOA) 11/27/2019
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
01/31/2023 36 Months From Approved 01/31/2020
43,408 0 43,408
160,842 0 160,842
867,500 0 867,500

The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.

US Code: 43 USC 1334 Name of Law: Outer Continental Shelf (OCS) Lands Act
   US Code: 31 USC 9701 Name of Law: Independent Offices Appropriations Act
   US Code: 30 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
  
None

Not associated with rulemaking

  84 FR 35418 07/23/2019
84 FR 65418 11/27/2019
No

74
IC Title Form No. Form Name
250.740; 741; 724(b) - Retain data for 2 years after completion
250.712(a), (b), (f) - Updated Rig Movement Form
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.740; 741; 724(b) - Drilling records
250.742 - Well logging operations
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Core analyses
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.720(a)(3) - Resuming Operations
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Successful pressure test
250.723(d) - Request exceptions prior to moving rig
250.734(a)(7) - Acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - Quarterly reports
250.737(d)(12) - Make available upon request.
250.738; 746(e) - DM Approval - Put well in safe condition
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738(i) - ITP report - fit for service
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.739 - meet/exceed API Standard 53
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
250.715 - GPS for MODUs - tracking/locator data
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.711(b), (c) - Daily Drill Report
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.724 - Transmit RTM data onshore
250.730(a)(4) - Schematic drawings
250.732(d) - Documentation that demonstrates compliance
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(3) - Submit report re design change/modified procedures
250.732(a) - Submit ITP verification
250.737(d)(5) - Alternating testing schedule
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.738; 746(e) - DM Approval - problems, issues, leaks
250.715 - GPS for MODUs - Install
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.724(c) - Develop and implement a RTM plan
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Extension Request
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(c) - Verification that an ITP conducted detailed reviews
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.738; 746(e) - DM Approval
250.722 - Evaluation results report
250.722(b)(3) - Pressure test after repairs
250.734(a)(7) - Additional information / acoustic control system
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - Monthly tracking fee
250.720(a) - Interrupting Operations
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report BSEE-0144 Rig Movement Notification Report

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 43,408 43,408 0 0 0 0
Annual Time Burden (Hours) 160,842 160,842 0 0 0 0
Annual Cost Burden (Dollars) 867,500 867,500 0 0 0 0
No
No

$10,374,352
No
    No
    No
No
No
No
Uncollected
Nicole Mason 703 787-1605 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/27/2019