OMB control number

30 CFR Part 250, Subpart G, Well Operations and Equipment.

OMB 1014-0028 · DOI/BSEE.

OMB 1014-0028

The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.

The latest form for 30 CFR Part 250, Subpart G, Well Operations and Equipment. expires 2027-05-31 and is listed under ICR 202201-1014-001.

Latest Forms, Documents, and Supporting Material

Latest forms, documents, and information collections
DocumentType
1014-0028 30-day FRN published [87 FR 56975] exp. 10-17-22.pdf Supplementary Document
1014-0028 60-day FRN published 1-20-22 [87 FR 3121] exp. 3-21-22.pdf Supplementary Document
eCFR __ 30 CFR Part 250 Subpart G -- Well Operations and Equipment.pdf Supplementary Document
1014-0028-SS-2023.docxSupporting Statement A
250.751 - BOP and coiled tubing tests Information collection
250.746(f) - Retain pressure tests, actuations, and inspections in daily report Information collection
250.746 - Casing and liner presser tests Information collection
250.745 - Varies records of operations Information collection
250.742 - Core analyses Information collection
250.742 - Velocity profiles and surveys Information collection
250.742 - Directional and vertical-well surveys Information collection
250.742 - Well logging operations Information collection
250.740; 741; 724(b) - Retain data for 2 years after completion Information collection
250.740; 741; 724(b) - Drilling records Information collection
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info. Information collection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records Information collection
250.739(b) - ITP report documenting inspection Information collection
250.739 - meet/exceed API Standard 53 Information collection
250.738(o) - ITP report re failure of redundant control Information collection
250.738(m) - ITP report re-equipment design and suitability Information collection
250.738(k) - Latching up BOP stack/re-establishing power Information collection
250.738(g) - Demonstrate well-control procedures Information collection
250.738(f) - BOP configuration changes Information collection
250.738(i) - ITP report - fit for service Information collection
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal Information collection
250.738; 746(e) - DM Approval - Well control demands above rating pressure Information collection
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP Information collection
250.738; 746(e) - DM Approval - Put well in safe condition Information collection
250.738; 746(e) - DM Approval - problems, issues, leaks Information collection
250.738; 746(e) - DM Approval Information collection
250.737(e) - 72 hour advance notice of location of shearing ram tests Information collection
250.737(d)(12) - Make available upon request. Information collection
250.737(d)(12) - Document all autoshear, EDS, and deadman test results Information collection
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion Information collection
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing Information collection
250.737(d)(5) - Alternating testing schedule Information collection
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results Information collection
250.737(a)(4) (d)(10) - Quarterly reports Information collection
250.737(a)(4) (d)(10) - 21-day BOP testing frequency Information collection
250.734(a)(9); 738(n) - Labeling Information collection
250.734(a)(7) - Additional information / acoustic control system Information collection
250.734(a)(7) - Acoustic control system Information collection
250.732(d) - Documentation that demonstrates compliance Information collection
250.732(c) - Verification that an ITP conducted detailed reviews Information collection
250.732(a) - Submit ITP verification Information collection
250.730(d)(1) - Alternate approval from using to API Spec. Q1 Information collection
250.730(c)(3) - Submit report re design change/modified procedures Information collection
250.730(c)(2) - Extension Request Information collection
250.730(c)(2) - Analysis report re equipment failure Information collection
250.730(c)(1) - Written notice of equipment failure Information collection
250.730(a)(4) - Schematic drawings Information collection
250.724(c) - Develop and implement a RTM plan Information collection
250.724 - Transmit RTM data onshore Information collection
250.723(d) - Request exceptions prior to moving rig Information collection
250.722(b)(3) - Pressure test after repairs Information collection
250.722 - Successful pressure test Information collection
250.722 - Evaluation results report Information collection
250.721(g)(6) - failed negative pressure test Information collection
250.721(g)(5) - Test Results Information collection
250.721(d), (f), (g) - plans to re-cement, repair, etc. Information collection
250.720(d) - Intervention Operations Information collection
250.720(a)(3) - Resuming Operations Information collection
250.720(a) - Interrupting Operations Information collection
250.715 - GPS for MODUs - Rent GPS Information collection
250.715 - GPS for MODUs - Monthly tracking fee Information collection
250.715 - GPS for MODUs - Install Information collection
250.715 - GPS for MODUs - tracking/locator data Information collection
250.714 - Dropped Objects Plan Information collection
250.713(a), (b) - Foundation Requirements Information collection
250.713(a), (b) - Fitness Requirements Information collection
250.712(d) - Construction Repairs/Mods to MODU/Rig Information collection
250.712(c), (e) - Warm or Cold Stacked Information collection
250.712(a), (b), (f) - Updated Rig Movement Form Information collection
250.712(a), (b), (f) - Rig Movement Notification Report Other-eWell Screenshots
250.712(a), (b), (f) - Notify BSEE of Rig Movements Information collection
250.711(b), (c) - Daily Drill Report Information collection
250.710(b); 738(p) - Well-Control Drill Plan Information collection
250.710(a) - Safety Meetings Information collection

All Historical Document Collections

Historical document collections
ReferenceFilingReceivedConcludedAction
202201-1014-001 Revision of a currently approved collection 2022-09-16 Approved with change
201908-1014-001 Extension without change of a currently approved collection 2019-11-27 Approved with change
201905-1014-009 Revision of a currently approved collection 2019-05-03 Approved without change
201811-1014-001 Revision of a currently approved collection 2018-12-13 Comment filed on proposed rule and continue
201607-1014-001 Revision of a currently approved collection 2016-07-28 Approved without change
201510-1014-001 New collection (Request for a new OMB Control Number) 2016-04-08 Preapproved
201301-1014-002 New collection (Request for a new OMB Control Number) 2015-04-17 Comment filed on proposed rule

OMB Details

250.710(a) - Safety Meetings

Federal Enterprise Architecture: Energy - Energy Production