30 CFR Part 250, Subpart G, Well Operations and Equipment.

ICR 202201-1014-001

OMB: 1014-0028

Federal Form Document

Forms and Documents
IC Document Collections
IC ID
Document
Title
Status
234340
Modified
234339
Modified
234338
Modified
234337
Modified
234336
Modified
234335
Modified
234334
Modified
234333
Modified
234332
Modified
234331
Modified
234330
Modified
234329
Modified
234328
Modified
234327
Modified
234326
Modified
234325
Modified
234324
Modified
234323
Modified
234322
Modified
234321
Modified
234320
Modified
234319
Modified
234318
Modified
234317
Modified
234316
Modified
234315
Modified
234314
Modified
234313
Modified
234312
Modified
234311
Modified
234310
Modified
234309
Modified
234308
Modified
234307
Modified
234306
Modified
234305
Modified
234304
Modified
234303
Modified
234302
Modified
234301
Modified
234300
Modified
234299
Modified
234298
Modified
234297
Modified
234296
Modified
234295
Modified
234294
Modified
234293
Modified
234292
Modified
234291
Modified
234290
Modified
234289
Modified
234288
Modified
234287
Modified
234286
Modified
234285
Modified
234284
Modified
234283
Modified
234282
Modified
234281
Modified
234280
Modified
234279
Modified
234278
Modified
234277
Modified
234276
Modified
234275
Modified
234274
Modified
234273
Modified
234272
Modified
234271 Modified
234270
Modified
234269
Modified
234268
Modified
234267
Modified
ICR Details
1014-0028 202201-1014-001
Received in OIRA 201908-1014-001
DOI/BSEE 1014-0028 - Sub G '23
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Revision of a currently approved collection   No
Regular 09/16/2022
  Requested Previously Approved
36 Months From Approved 01/31/2023
150,081 43,408
350,615 160,842
6,732,500 867,500

The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.

US Code: 31 USC 9701 Name of Law: Independent Offices Appropriations Act
   US Code: 30 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
   US Code: 43 USC 1334 Name of Law: Outer Continental Shelf (OCS) Lands Act
  
None

Not associated with rulemaking

  87 FR 3121 01/20/2022
87 FR 56975 09/16/2022
No

74
IC Title Form No. Form Name
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.711(b), (c) - Daily Drill Report
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report BSEE-0144 RIG MOVEMENT NOTIFICATION REPORT
250.712(a), (b), (f) - Updated Rig Movement Form
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.715 - GPS for MODUs - Install
250.715 - GPS for MODUs - Monthly tracking fee
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - tracking/locator data
250.720(a) - Interrupting Operations
250.720(a)(3) - Resuming Operations
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Evaluation results report
250.722 - Successful pressure test
250.722(b)(3) - Pressure test after repairs
250.723(d) - Request exceptions prior to moving rig
250.724 - Transmit RTM data onshore
250.724(c) - Develop and implement a RTM plan
250.730(a)(4) - Schematic drawings
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(2) - Extension Request
250.730(c)(3) - Submit report re design change/modified procedures
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(a) - Submit ITP verification
250.732(c) - Verification that an ITP conducted detailed reviews
250.732(d) - Documentation that demonstrates compliance
250.734(a)(7) - Acoustic control system
250.734(a)(7) - Additional information / acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(a)(4) (d)(10) - Quarterly reports
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(d)(12) - Make available upon request.
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.737(d)(5) - Alternating testing schedule
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.738(i) - ITP report - fit for service
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.738; 746(e) - DM Approval
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Put well in safe condition
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - problems, issues, leaks
250.739 - meet/exceed API Standard 53
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
250.740; 741; 724(b) - Drilling records
250.740; 741; 724(b) - Retain data for 2 years after completion
250.742 - Core analyses
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Well logging operations
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 150,081 43,408 0 0 106,673 0
Annual Time Burden (Hours) 350,615 160,842 0 0 189,773 0
Annual Cost Burden (Dollars) 6,732,500 867,500 0 0 5,865,000 0
No
No
The current OMB inventory for this collection is 160,842 burden hours. In this submission, we are requesting 350,615 burden hours. This represents an adjustment increase of +189,773 and is due to changes in the number of submissions BSEE received. The OMB current non-hour cost burden is $867,500. In this submission, we are requesting $6,732,500 non-hour cost burden. This represents an adjustment increase of +$5,865,000 and is due to the increase in submittals in § 250.732(a).

$23,929,451
No
    No
    No
No
No
No
No
Nicole Mason 703 787-1605 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/16/2022


© 2024 OMB.report | Privacy Policy