Information Collection Request

30 CFR Part 250, Subpart G, Well Operations and Equipment.

ICR 202201-1014-001 · OMB 1014-0028 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
1014-0028 30-day FRN published [87 FR 56975] exp. 10-17-22.pdf Supplementary Document Uploaded 2022-09-16 Repair queued
1014-0028 60-day FRN published 1-20-22 [87 FR 3121] exp. 3-21-22.pdf Supplementary Document Uploaded 2022-09-01 Repair queued
eCFR __ 30 CFR Part 250 Subpart G -- Well Operations and Equipment.pdf Supplementary Document Uploaded 2022-09-01 Repair queued
1014-0028-SS-2023.docx Supporting Statement A Uploaded 2022-09-01 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
234340 250.751 - BOP and coiled tubing tests Modified
234339 250.746(f) - Retain pressure tests, actuations, and inspections in daily report Modified
234338 250.746 - Casing and liner presser tests Modified
234337 250.745 - Varies records of operations Modified
234336 250.742 - Core analyses Modified
234335 250.742 - Velocity profiles and surveys Modified
234334 250.742 - Directional and vertical-well surveys Modified
234333 250.742 - Well logging operations Modified
234332 250.740; 741; 724(b) - Retain data for 2 years after completion Modified
234331 250.740; 741; 724(b) - Drilling records Modified
234330 250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info. Modified
234329 250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records Modified
234328 250.739(b) - ITP report documenting inspection Modified
234327 250.739 - meet/exceed API Standard 53 Modified
234326 250.738(o) - ITP report re failure of redundant control Modified
234325 250.738(m) - ITP report re-equipment design and suitability Modified
234324 250.738(k) - Latching up BOP stack/re-establishing power Modified
234323 250.738(g) - Demonstrate well-control procedures Modified
234322 250.738(f) - BOP configuration changes Modified
234321 250.738(i) - ITP report - fit for service Modified
234320 250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal Modified
234319 250.738; 746(e) - DM Approval - Well control demands above rating pressure Modified
234318 250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP Modified
234317 250.738; 746(e) - DM Approval - Put well in safe condition Modified
234316 250.738; 746(e) - DM Approval - problems, issues, leaks Modified
234315 250.738; 746(e) - DM Approval Modified
234314 250.737(e) - 72 hour advance notice of location of shearing ram tests Modified
234313 250.737(d)(12) - Make available upon request. Modified
234312 250.737(d)(12) - Document all autoshear, EDS, and deadman test results Modified
234311 250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion Modified
234310 250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing Modified
234309 250.737(d)(5) - Alternating testing schedule Modified
234308 250.737(c); 746(a), (b), (c), (d) - Record time, date, and results Modified
234307 250.737(a)(4) (d)(10) - Quarterly reports Modified
234306 250.737(a)(4) (d)(10) - 21-day BOP testing frequency Modified
234305 250.734(a)(9); 738(n) - Labeling Modified
234304 250.734(a)(7) - Additional information / acoustic control system Modified
234303 250.734(a)(7) - Acoustic control system Modified
234302 250.732(d) - Documentation that demonstrates compliance Modified
234301 250.732(c) - Verification that an ITP conducted detailed reviews Modified
234300 250.732(a) - Submit ITP verification Modified
234299 250.730(d)(1) - Alternate approval from using to API Spec. Q1 Modified
234298 250.730(c)(3) - Submit report re design change/modified procedures Modified
234297 250.730(c)(2) - Extension Request Modified
234296 250.730(c)(2) - Analysis report re equipment failure Modified
234295 250.730(c)(1) - Written notice of equipment failure Modified
234294 250.730(a)(4) - Schematic drawings Modified
234293 250.724(c) - Develop and implement a RTM plan Modified
234292 250.724 - Transmit RTM data onshore Modified
234291 250.723(d) - Request exceptions prior to moving rig Modified
234290 250.722(b)(3) - Pressure test after repairs Modified
234289 250.722 - Successful pressure test Modified
234288 250.722 - Evaluation results report Modified
234287 250.721(g)(6) - failed negative pressure test Modified
234286 250.721(g)(5) - Test Results Modified
234285 250.721(d), (f), (g) - plans to re-cement, repair, etc. Modified
234284 250.720(d) - Intervention Operations Modified
234283 250.720(a)(3) - Resuming Operations Modified
234282 250.720(a) - Interrupting Operations Modified
234281 250.715 - GPS for MODUs - Rent GPS Modified
234280 250.715 - GPS for MODUs - Monthly tracking fee Modified
234279 250.715 - GPS for MODUs - Install Modified
234278 250.715 - GPS for MODUs - tracking/locator data Modified
234277 250.714 - Dropped Objects Plan Modified
234276 250.713(a), (b) - Foundation Requirements Modified
234275 250.713(a), (b) - Fitness Requirements Modified
234274 250.712(d) - Construction Repairs/Mods to MODU/Rig Modified
234273 250.712(c), (e) - Warm or Cold Stacked Modified
234272 250.712(a), (b), (f) - Updated Rig Movement Form Modified
234271 250.712(a), (b), (f) - Rig Movement Notification Report Other-eWell Screenshots Modified
234270 250.712(a), (b), (f) - Notify BSEE of Rig Movements Modified
234269 250.711(b), (c) - Daily Drill Report Modified
234268 250.710(b); 738(p) - Well-Control Drill Plan Modified
234267 250.710(a) - Safety Meetings Modified
ICR Details
1014-0028 202201-1014-001
Received in OIRA 201908-1014-001
DOI/BSEE 1014-0028 - Sub G '23
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Revision of a currently approved collection   No
Regular 09/16/2022
  Requested Previously Approved
36 Months From Approved 01/31/2023
150,081 43,408
350,615 160,842
6,732,500 867,500

The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.

US Code: 31 USC 9701 Name of Law: Independent Offices Appropriations Act
   US Code: 30 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
   US Code: 43 USC 1334 Name of Law: Outer Continental Shelf (OCS) Lands Act
  
None

Not associated with rulemaking

  87 FR 3121 01/20/2022
87 FR 56975 09/16/2022
No

74
IC Title Form No. Form Name
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.711(b), (c) - Daily Drill Report
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report BSEE-0144 RIG MOVEMENT NOTIFICATION REPORT
250.712(a), (b), (f) - Updated Rig Movement Form
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.715 - GPS for MODUs - Install
250.715 - GPS for MODUs - Monthly tracking fee
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - tracking/locator data
250.720(a) - Interrupting Operations
250.720(a)(3) - Resuming Operations
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Evaluation results report
250.722 - Successful pressure test
250.722(b)(3) - Pressure test after repairs
250.723(d) - Request exceptions prior to moving rig
250.724 - Transmit RTM data onshore
250.724(c) - Develop and implement a RTM plan
250.730(a)(4) - Schematic drawings
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(2) - Extension Request
250.730(c)(3) - Submit report re design change/modified procedures
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(a) - Submit ITP verification
250.732(c) - Verification that an ITP conducted detailed reviews
250.732(d) - Documentation that demonstrates compliance
250.734(a)(7) - Acoustic control system
250.734(a)(7) - Additional information / acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(a)(4) (d)(10) - Quarterly reports
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(d)(12) - Make available upon request.
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.737(d)(5) - Alternating testing schedule
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.738(i) - ITP report - fit for service
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.738; 746(e) - DM Approval
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Put well in safe condition
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - problems, issues, leaks
250.739 - meet/exceed API Standard 53
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
250.740; 741; 724(b) - Drilling records
250.740; 741; 724(b) - Retain data for 2 years after completion
250.742 - Core analyses
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Well logging operations
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 150,081 43,408 0 0 106,673 0
Annual Time Burden (Hours) 350,615 160,842 0 0 189,773 0
Annual Cost Burden (Dollars) 6,732,500 867,500 0 0 5,865,000 0
No
No
The current OMB inventory for this collection is 160,842 burden hours. In this submission, we are requesting 350,615 burden hours. This represents an adjustment increase of +189,773 and is due to changes in the number of submissions BSEE received. The OMB current non-hour cost burden is $867,500. In this submission, we are requesting $6,732,500 non-hour cost burden. This represents an adjustment increase of +$5,865,000 and is due to the increase in submittals in § 250.732(a).

$23,929,451
No
    No
    No
No
No
No
No
Nicole Mason 703 787-1605 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/16/2022