Download:
pdf |
pdfForm RD 1924-13
(Rev. 12-98)
UNITED STATES DEPARTMENT OF AGRICULTURE
RURAL DEVELOPMENT
FORM APPROVED
OMB No. 0575-0042
ESTIMATE AND CERTIFICATE OF ACTUAL COST
This form is to be used by the contractor and borrower to estimate the cost of
construction and total PROJECT NUMBER (Borrower ID Number) development cost, or to
certify the actual cost of project construction and development.
BORROWER/OWNER-BUILDER
CONTRACTOR
NAME OF PROJECT
LOCATION
This certificate is made pursuant to existing regulations of the United States of America acting through the Rural Development in order to induce the Government to provide
or extend assistance. As part of that inducement, the following certifications are made:
Check and Complete Applicable Box:
A. ESTIMATE
I certify that the estimates of costs as set forth through line 44 in the ESTIMATED COST column are true and correct as computed by me
or
as given to me by the subcontractors or payees named, as general contractor or owner-builder for the development of the project described above, as determined from the plans and
specifications accepted, signed and dated by the Rural Development State Director of Rural Development or the State Directors's delegated representative, on
20
. As borrower or owner-builder for the development of the project described above, I certify that the estimates of cost as set forth from line 44 in the ESTIMATED COST
column are true and correct as computed by me or as given to me by the subcontractors or payees named. Subsequent to this estimate and prior to final payment, when directed by
Rural Development, I agree to furnish a certification of actual cost. The estimate and the final certification will be in accordance with Rural Development regulations requiring
estimates and certifications.
B. ACTUAL COST
I certify that the actual cost of labor, materials, and necessary services for the construction of the physical improvements in connection with the project described above, after
deduction of all rebates, adjustments, or discounts made or to be made to the undersigned borrower or general contractor, or any corporation, trust partnership, joint venture, or
other legal or business entity in which the undersigned borrower or general contractor, or any of their members, stockholders, officers, directors, beneficiaries, or partners hold any
interest, is as represented herein. The deduction of such rebates, adjustments, or discounts from actual hard costs will not be used to increase builder's profit over and above the
final estimated amount. I further certify that all soft costs associated with construction of the project as set forth on lines 45 through 57 are correct as represented herein.
According to the Paperwork Reduction Act of] 995, an agency may not conductor sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number The valid
OMB control number for this information collection is 0575-0042. The time required to complete this information collection is estimated to average 2 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Position 6
Form RD 1924-13 (Rev. 12-98)
% Diff.
Est. Actual
For Rural Development Use Only
Exceed
15%
Justification
Attached?
Page 2
Line
1
Div
.3
Concrete
2
4
Masonry
3
5
Metals
4
6
Rough Carpentry
5
6
Finish Carpentry
6
7
Waterproofinq
7
7
Insulation
8
7
Roofing
9
7
Sheet Metal
10
8
Doors
11
8
Windows
12
8
Glass
13
9
Drywall
14
9
Tile Work
15
9
Acoustical
16
9
Resilient Flooring
17
9
Painting and Decorating
18
10
Specialties
19
11
Special Equipment
20
11
Cabinets
21
11
Appliances
22
12
Blinds and Shades, Artwork
23
12
Carpets
24
13
Special Construction
25
14
Elevators
26
15
Plumbing and Hot Water
27
15
Heat and Ventilation
28
15
Air Conditioning
29
16
Electrical
30
2
Earth Work
31
2
On-Site Utilities
32
2
Roads and Walks
33
2
On-Site Improvements
34
2
Lawns and Planting
35
2
Unusual On-Site Conditions
36
2
Off-Site Development
37
Paid
Actual Cost
To Be Paid
Total
101
*
Miscellaneous (Labor and Materials)
38
39
Estimated
Cost
Trade Item
Name of Subcontractor
or Payee
Total Hard Costs
1
General Requirements
40
General Overhead
41
Other Fees Paid By Contractor
42
Total Costs
*
*
*
NOTE: (If additional space is required for these other items, append Rider thereto, with references and initial. When more than one subcontractor is performing a trade item, the attached work sheet must he completed giving the information indicated.) Form
* Breakdown on page 4.
RD 1924-13 (Rev. 12-98)
Page 3
CONTRACTOR'S AND BORROWER'S ESTIMATE AND CERTIFICATE OF ACTUAL COST
Line
43
44
45
46
47
48
49
50
51
52
53
54
55
Trade Item
Balance Brwt. Forward (line 42)
Builder's Profit
Estimated
Cost
Paid
Actual Cost
To Be Paid
Total
Name of Subcontractor
or Payee
Total Construction Cost
Architectural Fees
Survey and Engineering
Financing Costs Loan Fees
Interest During Construction
Closing Costs & Legal Fees
Land Cost or Value
Nonprofit O&M Capital
Tap and or Impact Fees
Tax Credit Fees
Environmental Fees
Market Study Cost
56
57
58
Total Development Cost
''Whoever, in any matter, with the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals or covers up by trick, scheme, or device a
material fact, or makes any false, fictitious or fraudulent statements or representations; or makes or uses any false writing or statement or entry, shall be fined under this title or
imprisoned not more than five years, or both.''
WARNING: Section 1001 of Title 18, United States Code provides: Furthermore, submission of false information relating to the content of this Estimate and Certificate
of Actual Cost will subject the submitter to any and all administrative remedies available to USDA. Such remedies may include suspension and debarment from
participating in any Rural Development or other Federal program.
Form RD 1924-13 (Rev. 12-98)
Page 4
ITEMIZED BREAKDOWN - ESTIMATED COSTS
CONTRACTOR'S GENERAL REQUIREMENTS
CONTRACTOR'S GENERAL OVERHEAD
OTHER FEES - PAID BY CONTRACTOR
(Job Overhead)
ITEM
TOTAL
ITEM
TOTAL
ITEM
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL (Line 39)
TOTAL (Line 40)
$
TOTAL (Line 41)
$
$
ITEMIZED BREAKDOWN - ACTUAL COST
CONTRACTOR'S GENERAL REQUIREMENTS
CONTRACTOR'S GENERAL OVERHEAD
OTHER FEEDS - PAID BY CONTRACTOR
(Job Overhead)
ITEM
TOTAL
ITEM
TOTAL
ITEM
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
TOTAL (Line 39)
$
TOTAL (Line 40)
$
TOTAL (Line 41)
$
Form RD 1924-13 (Rev. 12-98)
Page 5
The undersigned hereby certifies that: (check as appropriate)
There has not been and is not now any identity of interest between or among the borrower and/or general contractor on the one hand and any subcontractor, material supplier,
equipment lessor, or payee on the other (including any of their members, officers, directors, beneficiaries, or partners).
Attached to and made part of this certificate is a signed statement fully describing any rebates, adjustments, discounts, or any other devices which may have or have had the effect
of reducing cost, and all amounts shown above as "to be paid in cash" will be so paid within forty-five (45) days.
ESTIMATES:
Date
Date
Lines I through 44 (Name of Contractor)
Lines 44 through 58 (Name of Mortgagor)
By:
By:
(Signature)
Title:
(Signature)
Title:
ACTUAL
Date
Date
Lines I through 44 (Name of Contractor)
Lines 44 through 58 (Name of Mortgagor)
By:
By:
(Signature)
Title:
(Signature)
Title:
Form RD 1924-13 (Rev. 12-98)
File Type | application/pdf |
File Title | Estimate And Certification Of Actual Cost |
Subject | RD 1924-13 |
File Modified | 2017-10-23 |
File Created | 2002-06-15 |