Information Collection Request

FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014

ICR 202102-1902-001 · OMB 1902-0274 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
30-day notice (published).pdf Supplementary Document Uploaded 2021-02-25 Repair queued
60-day notice (published).pdf Supplementary Document Uploaded 2021-02-25 Repair queued
FERC-725U 30-day notice (Issued).docx Supplementary Document Uploaded 2021-02-25 Repair queued
FERC-725U 60-day notice(issued).docx Supplementary Document Uploaded 2021-02-25 Repair queued
FERC-725U supporting statement-Final.docx Supporting Statement A Uploaded 2021-02-26 Repair queued
CIP-014-2.pdf Supplementary Document Uploaded 2021-02-12 Missing upstream
16 USC 824 (o).pdf Supplementary Document Uploaded 2021-02-12 Repair queued
18 CFR 40.pdf Supplementary Document Uploaded 2021-02-12 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
212410 Reliability Standard CIP-014-2 Unchanged
ICR Details
1902-0274 202102-1902-001
Received in OIRA 201710-1902-010
FERC FERC-725U
FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014
Extension without change of a currently approved collection   No
Regular 02/26/2021
  Requested Previously Approved
36 Months From Approved 04/30/2021
336 336
10,991 10,991
0 0

The Reliability Standard CIP-014-2 requires Transmission Owners and Transmission Operators to identify and protect Transmission stations and Transmission substations, and their associated primary control centers, that if rendered inoperable or damaged as a result of a physical attack could result in widespread instability, uncontrolled separation, or cascading within an Interconnection. In terms of information collection requirements, there are two main types of PRA activities: 1) Create or maintain documentation showing performance of a certain task; and 2) Develop a physical security plan.

US Code: 16 USC 824o Name of Law: Federal Power Act
  
None

Not associated with rulemaking

  85 FR 80778 12/14/2020
86 FR 11277 02/24/2021
No

1
IC Title Form No. Form Name
Reliability Standard CIP-014-2

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 336 336 0 0 0 0
Annual Time Burden (Hours) 10,991 10,991 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$6,475
No
    No
    No
No
No
No
No
David O'Conner 202 502-6695

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/26/2021