Plan Approval and Records for
Electrical Engineering Regulations Title 46 CFR Subchapter J.
Extension without change of a currently approved collection
No
Regular
04/23/2021
Requested
Previously Approved
36 Months From Approved
04/30/2021
6,536
6,524
6,536
6,524
0
0
The information is needed to ensure
compliance with our rules on electrical engineering for the design
and construction of U.S.-flag commercial vessels. Respondents are
owners, operators, shipyards, designers, and manufacturers of
vessels.
US Code:
46
USC 3306 Name of Law: Shipping / Regulations
US Code: 46
USC 3703 Name of Law: Shipping / Frequency of Inspection
The change in burden is an
ADJUSTMENT due to a change (i.e., increase) in the estimated annual
number of plans submitted to the MSC. There is no proposed change
to the reporting or recordkeeping requirements of this collection.
The reporting and recordkeeping requirements—and the methodology
for calculating burden—remain unchanged.
$3,751,664
No
Yes
No
No
No
No
No
David Du Pont 202
267-0971
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.