Plan Approval and Records for Electrical Engineering Regulations Title 46 CFR Subchapter J.
Extension without change of a currently approved collection
No
Regular
04/23/2021
table that charts list comparision
Requested
Previously Approved
36 Months From Approved
04/30/2021
6,536
6,524
6,536
6,524
0
0
The information is needed to ensure compliance with our rules on electrical engineering for the design and construction of U.S.-flag commercial vessels. Respondents are owners, operators, shipyards, designers, and manufacturers of vessels.
US Code:
46 USC 3306
Name of Law: Shipping / Regulations
US Code:
46 USC 3703
Name of Law: Shipping / Frequency of Inspection
The change in burden is an ADJUSTMENT due to a change (i.e., increase) in the estimated annual number of plans submitted to the MSC. There is no proposed change to the reporting or recordkeeping requirements of this collection. The reporting and recordkeeping requirementsâand the methodology for calculating burdenâremain unchanged.
$3,751,664
No
Yes
No
No
No
No
No
David Du Pont 202 267-0971
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.