NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL) (Renewal)

ICR 202205-2060-006

OMB: 2060-0520

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2022-05-12
Supporting Statement A
2022-05-12
ICR Details
2060-0520 202205-2060-006
Received in OIRA 201903-2060-031
EPA/OAR 2029.09
NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL) (Renewal)
Revision of a currently approved collection   No
Regular 05/23/2022
  Requested Previously Approved
36 Months From Approved 05/31/2022
18 17
4,000 3,970
84,900 20,000

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Asphalt Processing and Asphalt Roofing Manufacturing apply to both existing facilities and new facilities that manufacture asphalt roofing products or oxidized asphalt that are major sources of hazardous air pollutants (HAPs) or are collocated at major sources. New facilities include those that commenced construction or reconstruction after the date of the original proposal (November 21, 2001). In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. This information is being collected to assure compliance with 40 CFR Part 63, Subpart LLLLL.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  86 FR 19256 04/13/2021
87 FR 29310 05/13/2022
No

1
IC Title Form No. Form Name
NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 18 17 0 3 -2 0
Annual Time Burden (Hours) 4,000 3,970 0 69 -39 0
Annual Cost Burden (Dollars) 84,900 20,000 0 88,400 -23,500 0
Yes
Miscellaneous Actions
No
There is an increase in burden from the most-recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. This ICR merges the burdens from EPA ICR Number 2029.08 and EPA ICR No. 2598.02 (OMB No. 2060-0724), and from the ICR that the RTR amendments finalized on March 12, 2020 at 85 FR 14526. The prior RTR amendments revised the rule to add periodic testing requirements which increased burden, and resulted in an increase in periodic testing costs and an increase in operation and maintenance (O&M) costs for control devices. The regulations are not anticipated to change over the next three years. The growth rate for this industry is very low or non-existent. There are no changes in the capital/startup costs as no new sources have been constructed.

$8,730
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/23/2022