Form GSA 2437 GSA 2437 Findings of Fact For Contract Modification

Construction-Manager-as-Constructor Contracting; GSAR Section Affected: 552.236-72; GSA 2437

GSA2437-16a

Construction-Manager-as-Constructor Contracting; GSAR Section Affected: 552.236-72; GSA 2437

OMB: 3090-0308

Document [pdf]
Download: pdf | pdf
CONTRACT NUMBER

DELIVERY ORDER NUMBER

FINDINGS OF FACT FOR
CONTRACT MODIFICATION
(See instructions on reverse)

PROJECT NAME

LOCATION

C.E. NUMBER (or other control number)

CONTRACTOR

CONTRACT MODIFICATION NUMBER

1. REASON FOR CHANGE (Check) (See Clause 68, Changes.)
DESIGN DEFICIENCY

PROJECT ACCELERATION

A. REFER TO DRAWING NUMBER, DETAIL, ETC.

STOP WORK/TERMINATION (CLAUSES 86-91)
LIQUIDATION DAMAGES

B. REFER TO SPECIFICATION SECTION AND PARAGRAPHS

GOVERNMENT FURNISHED PROPERTY, ETC. (CLAUSE 42)
TIME EXTENSION FOR EXCUSABLE DELAY (CLAUSE 41)

UNFORESEEN/DIFFERING CONDITIONS (CLAUSES 21-23)

OTHER:

AGENCY REQUEST
VALUE ENGINEERING/COST REDUCTION
2. DESCRIPTION OF MODIFICATION:

3. WHY IS IT IN THE BEST INTEREST OF THE GOVERNMENT TO ACCOMPLISH THIS WORK AND UNDER THIS CONTRACT?

4. AS A RESULT OF THIS CHANGE, THE CONTRACTOR'S TIME WILL BE EXTENDED
B. PRESENT COMPLETION DATE

C. NEW COMPLETION DATE

D. APPROPRIATION/ALLOWANCE NUMBER

A. CALENDAR DAYS
E. AMOUNT OF THIS CHANGE

$
GENERAL SERVICES ADMINISTRATION

GSA 2437 (REV. 8/2016)

5. JUSTIFICATION FOR EXTENDING OR NOT EXTENDING CONTRACTOR'S TIME

THE ABOVE CONTRACTOR HAS SUFFICIENT EQUIPMENT, MATERIALS, PERSONNEL, AND SKILLS TO ACCOMPLISH THE WORK
REQUIRED BY THIS CHANGE AND IT IS IN THE BEST INTEREST OF THE GOVERNMENT TO MODIFY THIS CONTRACT AS:
SIGNATURE (Site Representative or Recommender)

DATE

SIGNATURE (Contracting Officer or Authorized Representative)

DATE

INSTRUCTIONS FOR PREPARATION
General. GSA 2437 shall be prepared by the contracting officer or authorized representative. This form shall be used on all
construction contracts awarded under new construction, repair, and alteration programs. It may be used for other types of
contracts.
In the case of other contracts, equivalent clauses are intended. The GSA 2437 provides part of the necessary documentation on
contract changes. A copy of the form shall be completed promptly prior to issuance of a contract modification (including PDL
change orders). The modification must include a clearly defined scope of work for the change. All PDL modification files shall
include the GSA 2437, Findings of Fact. A copy of the form shall be completed promptly prior to the issuance of a contract
modification, to include PDL change orders. Section 4 of GSA 2437 shall be completed with the best estimates available at the
time the PDL modification is issued. The information provided on this form shall be kept current.
Specific. The form is generally self-explanatory. However, care must be exercised in filing out the items. Additional guidance
follows:
Item 1.
The reason for change is to be indicated by checking the appropriate box(es).
Items 2 and 3.
Give a complete and concise description of the change (Item 2) and justification (Item 3) for accomplishing the work under the
contract. Attach additional sheets if necessary.
Items 4 and 5.
Indicate the amount of time extension under Item 4 and give justification under Item 5. These items are to be completed even if
no time extension is justified. (In case of no time extension, insert "0" in space under "Calendar Days".) Time must be resolved
in each contract modification concurrently with any appropriate price adjustment.
GSA 2437 (REV. 8/2016) BACK


File Typeapplication/pdf
File Modified2017-01-26
File Created2017-01-26

© 2024 OMB.report | Privacy Policy